Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005
ML18235A361
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/23/2018
From: Alan Blamey
NRC/RGN-II/DRP/RPB2
To: Vehec T
Southern Nuclear Operating Co
References
IR 2018005
Download: ML18235A361 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 2 3, 2018 Mr. Tom Vehec Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: UPDATED INSPECTION PLAN FOR EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000321/2018005 AND 05000 366/2018005

Dear Mr. Vehec:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Edwin I. Hatch Nuclear Plant Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.

" Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely, /RA/ Alan Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.:

50-321, 50-366 License Nos.:

DPR-57 and NPF

-5

Enclosure:

Hatch Inspection Activity Plan (09/01/2018

- 06/30/2020)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2

- NRC INSPECTION REPORTS 05000321/2018005 AND 05000366/2018005 August 23, 2018 DISTRIBUTION

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML18235A36 1 OFFICE RII/DRP RII/DRP NAME NStaples ABlamey DATE 8/23/2018 8/23/2018 OFFICIAL AGENCY RECORD

Hatch 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION 2 1, 2 11/05/2018 11/09/2018 IP 71130.05 000737 Protective Strategy Evaluation EMERGENCY PREPAREDNESS PROGRAM 2 1, 2 12/10/2018 12/14/2018 IP 71114.02 000717 Alert and Notification System Testing 1, 2 12/10/2018 12/14/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 12/10/2018 12/14/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 12/10/2018 12/14/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 12/10/2018 12/14/2018 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1, 2 01/14/2019 01/18/2019 IP 71130.07 000739 Security Training RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 3 1, 2 02/04/2019 02/08/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/04/2019 02/08/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/04/2019 02/08/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/04/2019 02/08/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 02/04/2019 02/08/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation UNIT 2 POST-APPROVAL LR PHASE 3 1 2 02/11/2019 02/15/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 2 IN-SERVICE INSPECTION 1 2 02/11/2019 02/15/2019 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 2 2 1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2019 03/01/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 02/25/2019 03/01/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation TARGET SET INSPECTION 1 1, 2 04/15/2019 04/17/2019 IP 71130.14 000743 Review of Power Reactor Target Sets Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Hatch 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 04/29/2019 05/03/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

1, 2 05/13/2019 05/17/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1, 2 07/08/2019 07/12/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments HATCH INITIAL LICENSE EXAM 5 1, 2 07/08/2019 07/12/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 08/12/2019 08/30/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/05/2019 08/09/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION 1 1, 2 08/12/2019 08/16/2019 IP 71130.02 000734 Access Control 1, 2 08/12/2019 08/16/2019 IP 71151 001338 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 09/09/2019 09/13/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 09/23/2019 09/27/2019 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISE 8 1, 2 09/30/2019 10/04/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 10/21/2019 10/25/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EMERGENCY PREPAREDNESS EXERCISE 6 1, 2 10/21/2019 10/25/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 10/21/2019 10/25/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/21/2019 10/25/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 1, 2 10/21/2019 10/25/2019 IP 71151 001397 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION 1 1 02/17/2020 02/21/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP OCCUPATIONAL RAD SAFETY RAD HAZARDS & TRANSPORTATION BASELINE INSPECTION 2 1, 2 02/17/2020 02/21/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Hatch 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY RAD HAZARDS & TRANSPORTATION BASELINE INSPECTION 2 1, 2 02/17/2020 02/21/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation DESIGN BASIS ASSURANCE INSPECTION (PROGRAM)

3 1, 2 05/18/2020 05/22/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 06/01/2020 06/05/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RP PUBLIC RAD SAFETY BASELINE INSPECTION 2 1, 2 06/08/2020 06/12/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/08/2020 06/12/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.