ML080370199
ML080370199 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 02/05/2008 |
From: | Bywater R L Region 4 Engineering Branch 1 |
To: | Blevins M Luminant Generation Co |
References | |
IR-08-003 | |
Download: ML080370199 (12) | |
See also: IR 05000445/2008003
Text
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV611 RYAN PLAZA DRIVE, SUITE 400ARLINGTON, TEXAS 76011-4005
February 5, 2008
Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC
ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000445/2008003 AND 05000446/2008003) AND REQUEST FOR INFORMATION
Dear Mr. Blevins:
From March 31 to April 11, 2008, reactor inspectors from the Nuclear Regulatory
Commission's (NRC) Region IV office will perform the baseline inservice inspection at Comanche Peak Steam Electric Station, Unit 2, using NRC Inspection Procedure 71111.08. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for
documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date
and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Bob Kidwel of your
licensing organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector S. Makor at (817) 276-6507 (stm@nrc.gov).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's
Luminant Generation -2- Company LLC
document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/
Russell L. Bywater, Chief Engineering Branch 1 Division of Reactor Safety
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
Enclosure: Inservice Inspection Document Request
cc w/enclosure: Fred W. Madden, Director
Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004
Anthony Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157
Austin, TX 78711
Somervell County Judge P.O. Box 851 Glen Rose, TX 76043
Richard A. Ratliff, Chief
Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189
Environmental and Natural
Luminant Generation -3- Company LLC
Resources Policy Director Office of the Governor P.O. Box 12428
Austin, TX 78711-3189
Brian Almon Public Utility Commission William B. Travis Building
P.O. Box 13326 Austin, TX 78711-3326
Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on
Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087
Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189
Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI
800 N. Loop 288 Denton, TX 76209
Luminant Generation -4- Company LLC
Electronic distribution by RIV: Regional Administrator (EEC) DRP Director (DDC)
DRS Director (RJC1) DRS Deputy Director (ACC) Senior Resident Inspector (DBA) Branch Chief, DRP/A (CEJ1) Senior Project Engineer, DRP/A (TRF)
Team Leader, DRP/TSS (CJP) RITS Coordinator (MSH3)
SUNSI Review Completed: ______ ADAMS: Yes No Initials: ______ Publicly Available Non-Publicly Available Sensitive Non-Sensitive
S:\DRS\REPORTS\CP2008003lt-lee1.doc RI:EB1 SRI:EB1 C:EB1 SMakor/lmb LEEllershawRLBywater /RA/ /RA/ /RA/ 2/5/08 2/5/08 2/5/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
1 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates: March 31, 2008 - April 11, 2008
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/166 "Pressurized Water Reactor Containment Sump Blockage"
Inspectors: S. Makor, Reactor Inspector (Lead Inspector - ISI)
J. Drake, Senior Reactor Inspector K. Clayton, Senior Reactor Inspector L. Ellershaw, Senior Reactor Inspector
A. Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or
electronic format (ims.certrec.com preferred), in care of L. Ellershaw, by March 17, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected
from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and
provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as
possible.
A.1 ISI/Welding Programs and Schedule Information
a) A detailed schedule (including preliminary dates) of:
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI programs during the upcoming outage.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information)
ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable)
2 Enclosure
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
v) Welding activities that are scheduled to be completed during the upcoming
outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service. The list of NDE reports should include a brief description of the SSC
where the relevant condition was identified.
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last
refueling outage, or are planned to be fabricated this refueling outage.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference
numbers for applicable procedures that will be used to conduct these examinations.
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample
sizes if relevant conditions are identified. (If applicable)
3 Enclosure
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP)
a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid
leakage/corrosion evaluation.
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.
c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator Tube (SGT) Inspections
a) A detailed schedule of:
i) SGT inspection, data analyses, and repair activities for the upcoming outage. (If occurring)
ii) SG secondary side inspection activities for the upcoming outage. (If occurring)
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available:
i) Degradation Assessment ii) Condition Monitoring Assessment
c) If you are planning on modifying your Technical Specifications such that they are
consistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.
4 Enclosure
f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)
h) Please provide copies of your most recent self assessments of the SG
monitoring, loose parts monitoring, and secondary side water chemistry control programs.
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested. A.5 Metals Reliability (MRP-139) Program Activities
a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs
have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous
examinations should be available for review.
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed then records of previous welding on DMBWs and postweld NDE documentation.
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage. If none are scheduled then have qualification reports for any SIs previously performed.
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.
A.6 Additional information related to all ISI activities
5 Enclosure
a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME
Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.
b) Please provide names and phone numbers for the following program leads:
ISI contacts (Examination, planning) Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer
Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (March 31, 2008):
B.1 ISI / Welding Programs and Schedule Information
a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds
vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds.
xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable
6 Enclosure
welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems
selected by the inspector from section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
f) For the NDEs selected by the inspector from section A of this enclosure, provide
copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include qualification documentation
of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)
i) RPVH and CRDM nozzle configurations ii) RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle attachment
welds as applicable.
c) Copy of NDE reports from the last RPVH examination.
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern
7 Enclosure
this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
f) Provide a copy of the updated calculation of effective degradation years (EDY)
for the RPVH susceptibility ranking.
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from
that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
c) Please provide a copy of the ET procedures used to perform the SGT
inspections (sp ecifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the specific equipment to be used.
d) Please provide copies of your responses to NRC and industry operating
experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.
B.5 Codes and Standards
8 Enclosure
a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.
Inspector Contact Information:
L.E. Ellershaw Shiattin Makor Senior Reactor Inspector Reactor Inspector 817-860-8127 817-276-6507
lee1@nrc.gov stm@nrc.gov
Mailing Address: US NRC Region IV
Attn: L. Ellershaw 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011