ML24025A00525 January 2024Review of the Spring 2023 Steam Generator Tube Inspection Report
ML22346A08613 December 2022Acknowledgment of Response to Inspection Report 05000445/2022003 and Notice of Violation
ML20225A09312 August 2020Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information
ML19248B8285 September 2019Response to Request to Consider Revision to Cross-Cutting Aspects for Two Findings
ML18319A15015 November 2018Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000445/2019001 and 05000446/2019001) and Request for Information
ML16239A10626 August 2016Letter to Luminant - Response to Appeal of the Formal Disagreement with Adversary Characteristics, Attributes, or Tactics Employed or Prepared as Part of a U.S. NRC Evaluated Force-on-Force Exercise - Disputed Item 05000445,446/2016-01 (Com
ML16197A08015 July 2016Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection 05000445/2016007 and 05000446/2016007, and Request for InformationCommercial Grade Dedication
IR 05000445/20154022 March 2016Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000445/2015402 and 05000446/2015402)
IR 05000445/201140528 June 2011IR 05000445-11-405 and 05000446-11-405, on 06/13/2011, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Physical Security Requirements for Independent Spent Fuel Storage Installations Inspection ReportAffidavit
IR 05000445/201050110 January 2011IR 05000445-10-501, 05000446-10-501, on 12/31/2010, Comanche Peak Nuclear Power Plant, Units 1 & 2, NRC Emergency Preparedness Annual Inspection (Cover Letter)
IR 05000445/200940126 March 2010NRC Physical Security Annual Inspection Report 05000445-09-401 and 05000446-09-401
ML09208057027 July 2009Comanche, Notification of Inspection (NRC Inspection Report 05000446-09-005) and Request for InformationBoric Acid
Nondestructive Examination
VT-2
IR 05000445/200750121 February 2008Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2007501 and 05000446/2007501
ML0803701995 February 2008Notification of Inspection (NRC Inspection Report 05000445-08-003 and 05000446-080-03) and Request for InformationBoric Acid
Nondestructive Examination
VT-2
IR 05000445/200740510 September 2007IR 05000445-07-405, 05000446-07-405, on 09/07/2007; Comanche Peak Steam Electric Station - Letter OnlyAffidavit
IR 05000445/20070035 August 2007IR 05000445-07-003, 05000446-07-003, on 03/24/2007 - 06/22/2007, Comanche Peak Steam Electric Station, Units 1 and 2. Access Control to Radiologically Significant Areas; ALARA Planning and Controls; Problem Identification and ResolutionSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Stroke time
Water Inventory Control
Weld Overlay
Internal Flooding
Coatings
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Maintenance Rule Program
Control of Heavy Loads
Substantial potential for an overexposure
Overexposure
IR 05000445/200740330 July 2007IR 05000445-07-403, IR 05000446-07-403, on 06/25/2007 - 07/18/2007, Comanche Peak Steam Electric Station, Material Control and Accounting Program - Letter OnlyAffidavit
ML07053028122 February 2007IR 05000445-07-402, IR 05000446-07-002, 01/22/2007 - 01/25/2007, Comanche Peak Steam Electric Station, Security Access Control - Letter Only
IR 05000445/200740222 February 2007IR 05000445-07-402, IR 05000446-07-002, 01/22/2007 - 01/25/2007, Comanche Peak Steam Electric Station, Security Access Control - Letter OnlyAffidavit
IR 05000445/20060069 November 2006NRC Security Inspection Report 05000445-06-006 and 05000446-06-006Significance Determination Process
Affidavit
IR 05000445/20064013 November 2006Commanche Peak Steam Electric Station - NRC Inspection Report 05000445/2006401 and 05000446/2006401
IR 05000445/200100518 January 2002IR 05000445/2001-005; IR 05000446/2001-005; on 10/07/2001-12/29/2001; Txu Electric; Comanche Peak Steam Electric Station; Units 1 and 2. Integrated Resident & Regional ReportFire Barrier