Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000445/2019001 and 05000446/2019001) and Request for Information
ML18319A150
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/15/2018
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Peters K
Vistra Operations Company
References
IR 2019001
Download: ML18319A150 (5)


See also: IR 05000445/2019001

Text

November 15, 2018

Ken J. Peters, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Vistra Operations Company LLC

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION

(05000445/2019001 and 05000446/2019001) AND REQUEST FOR

INFORMATION

Dear Mr. Peters:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Comanche Peak Nuclear Power Plant from January 14 to January 18,

2019. The inspection will consist of three reactor inspectors from the NRCs Region IV office for

one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by January 7, 2019. Upon review

of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ken Vehstedt of your licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at

Wayne.Sifre@NRC.GOV.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

K. Peters 2

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a

copy of this letter and its enclosure will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos: 50-445 and 50-446

License Nos: NPF-87 and NPF-89

Enclosure:

Evaluations of Changes, Tests, and Experiments

Inspection Request for Information

cc: Electronic Distribution to the Comanche Peak Nuclear Power Plant

ML18319A150

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: WCSifre Yes No Publicly Available Sensitive

OFFICE EB1 C:EB1 C:PBA C:EB1

NAME WSifre TFarnholtz MHaire TFarnholtz

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 11/15/18 11/15/18 11/15/18 11/15/18

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

Comanche Peak Nuclear Power Plant

Inspection Report: 05000445/2019001 and 05000446/2019001

Inspection Dates: January 14 - 18, 2019

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector: Wayne Sifre, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by January 7, 2019 to the attention of Wayne Sifre. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

Procedures for conducting 10 CFR 50.59 screenings and evaluations.

A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented

changes, tests, and experiments performed since the last triennial modification inspection that

did not result in an evaluation.

A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and

experiments performed since the last triennial 10 CFR 50.59 inspection that did not result in an

application for a license amendment.

A list with descriptions of all temporary plant modifications implemented since the last triennial

10 CFR 50.59 inspection.

A list with descriptions of all compensatory actions for degraded or non-conforming conditions

implemented since the last triennial 10 CFR 50.59 inspection.

A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings

and evaluations since the last triennial 10 CFR 50.59 inspection.

A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including

qualification dates.

A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

Current revisions of the Technical Specifications and Bases and the Updated Final Safety

Analysis Report.

Enclosure

A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs.

A copy of the most recent submittal of the report containing a brief description of any changes,

tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2).

A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that, inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Wayne Sifre Chris Smith Shiattin Makor

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1193 817-200-1095 817-200-1507

Wayne.Sifre@nrc.gov Chris.Smith@nrc.gov Shiattin.Makor@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4125

2