November 15, 2018
Ken J. Peters, Senior Vice President
and Chief Nuclear Officer
Attention: Regulatory Affairs
Vistra Operations Company LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION
(05000445/2019001 and 05000446/2019001) AND REQUEST FOR
INFORMATION
Dear Mr. Peters:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your Comanche Peak Nuclear Power Plant from January 14 to January 18,
2019. The inspection will consist of three reactor inspectors from the NRCs Region IV office for
one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by January 7, 2019. Upon review
of these documents, the inspectors will select additional documentation for review upon arrival.
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ken Vehstedt of your licensing organization.
If there are any questions about this inspection or the material requested, please contact the
lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at
Wayne.Sifre@NRC.GOV.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
K. Peters 2
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a
copy of this letter and its enclosure will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos: 50-445 and 50-446
License Nos: NPF-87 and NPF-89
Enclosure:
Evaluations of Changes, Tests, and Experiments
Inspection Request for Information
cc: Electronic Distribution to the Comanche Peak Nuclear Power Plant
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: WCSifre Yes No Publicly Available Sensitive
OFFICE EB1 C:EB1 C:PBA C:EB1
NAME WSifre TFarnholtz MHaire TFarnholtz
SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 11/15/18 11/15/18 11/15/18 11/15/18
Request for Information
Evaluations of Changes, Tests, and Experiments Inspection
Comanche Peak Nuclear Power Plant
Inspection Report: 05000445/2019001 and 05000446/2019001
Inspection Dates: January 14 - 18, 2019
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector: Wayne Sifre, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by January 7, 2019 to the attention of Wayne Sifre. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the onsite inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
Procedures for conducting 10 CFR 50.59 screenings and evaluations.
A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented
changes, tests, and experiments performed since the last triennial modification inspection that
did not result in an evaluation.
A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and
experiments performed since the last triennial 10 CFR 50.59 inspection that did not result in an
application for a license amendment.
A list with descriptions of all temporary plant modifications implemented since the last triennial
10 CFR 50.59 inspection.
A list with descriptions of all compensatory actions for degraded or non-conforming conditions
implemented since the last triennial 10 CFR 50.59 inspection.
A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings
and evaluations since the last triennial 10 CFR 50.59 inspection.
A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including
qualification dates.
A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
Current revisions of the Technical Specifications and Bases and the Updated Final Safety
Analysis Report.
Enclosure
A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs.
A copy of the most recent submittal of the report containing a brief description of any changes,
tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2).
A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that, inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Wayne Sifre Chris Smith Shiattin Makor
Senior Reactor Inspector Reactor Inspector Reactor Inspector
817-200-1193 817-200-1095 817-200-1507