Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
PNO-II-85-070, utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm23 July 1985PNO-II-85-070:utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm
PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed24 July 1985PNO-II-85-070A:on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If NeededHigh winds
PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm26 July 1985PNO-II-85-070B:monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm
PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures29 August 1985PNO-II-85-086:on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures
PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures30 August 1985PNO-II-85-086A:on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures
PNO-II-85-092, on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power26 September 1985PNO-II-85-092:on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power
PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 85111819 November 1985PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118
PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path22 November 1985PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path
PNO-II-86-074, on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry14 October 1986PNO-II-86-074:on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
PNO-III-82-062, on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette30 June 1982PNO-III-82-062:on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette
PNO-III-82-068, on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated22 July 1982PNO-III-82-068:on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated
PNO-III-82-071, on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder30 July 1982PNO-III-82-071:on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder
PNO-III-85-053, on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs26 June 1985PNO-III-85-053:on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs
PNO-III-86-009, on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation Encl31 January 1986PNO-III-86-009:on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation EnclEarthquake
PNO-III-86-009A, on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage Noted3 February 1986PNO-III-86-009A:on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage NotedSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Scaffolding
PNO-III-86-142, on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days5 December 1986PNO-III-86-142:on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days
PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected7 January 1987PNO-III-87-004:rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected
PNO-III-87-009, on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc14 January 1987PNO-III-87-009:on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered27 July 1987PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems3 November 1987PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems
PNO-IV-86-021, on 860626,Hurricane Bonnie Came Ashore Near Port Arthur,Tx on Louisiana/Texas Border.Bonnie Described as Minimal Hurricane.Hurricane Protection Procedures Implemented as Required26 June 1986PNO-IV-86-021:on 860626,Hurricane Bonnie Came Ashore Near Port Arthur,Tx on Louisiana/Texas Border.Bonnie Described as Minimal Hurricane.Hurricane Protection Procedures Implemented as Required
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends9 May 1988PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred5 July 1989PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage OccurredEarthquake
PNO-V-80-001, on 800109,members of Ibew Voted 522 to 27 to Authorize Strike on 800114.Approx 51% of Site Employees Are Members.Resident Inspector Has Completed Prestrike Insp Requirements10 January 1980PNO-V-80-001:on 800109,members of Ibew Voted 522 to 27 to Authorize Strike on 800114.Approx 51% of Site Employees Are Members.Resident Inspector Has Completed Prestrike Insp Requirements
PNO-V-80-016, on 800305,Region 5 Mgt Met W/Licensee at Site to Discuss Valve & Electrical Noncompliance That Has Rendered Portions of HPI Sys Inoperable.Escalated Enforcement Will Be Requested 8003146 March 1980PNO-V-80-016:on 800305,Region 5 Mgt Met W/Licensee at Site to Discuss Valve & Electrical Noncompliance That Has Rendered Portions of HPI Sys Inoperable.Escalated Enforcement Will Be Requested 800314
PNO-V-80-038, during 800525-27,series of Major Earthquakes Centered in Mammoth Lakes Region of Central CA Occurred. No Effect on Operations or Structures Occurred & No Seismic Instrumentation Triggered.Diablo Canyon Not Affected27 May 1980PNO-V-80-038:during 800525-27,series of Major Earthquakes Centered in Mammoth Lakes Region of Central CA Occurred. No Effect on Operations or Structures Occurred & No Seismic Instrumentation Triggered.Diablo Canyon Not AffectedEarthquake
PNO-V-80-081, on 801222,while Installing Gas Monitor at 100% Power,Auxiliary Bldg Stack,Control Room & Condenser Air Ejector Radiation Monitoring Sys Alarmed & Pegged High. Caused by Wide Swings in Movement of Common Ac Power Lead22 December 1980PNO-V-80-081:on 801222,while Installing Gas Monitor at 100% Power,Auxiliary Bldg Stack,Control Room & Condenser Air Ejector Radiation Monitoring Sys Alarmed & Pegged High. Caused by Wide Swings in Movement of Common Ac Power LeadGrab sample
PNO-V-83-028, on 830718,licensee Representative Called Region V Office to Report That PG&E Determined That Less than Min Wall Thickness Existed in RCS at Location of Gouges Previously Identified on 83041918 July 1983PNO-V-83-028:on 830718,licensee Representative Called Region V Office to Report That PG&E Determined That Less than Min Wall Thickness Existed in RCS at Location of Gouges Previously Identified on 830419
PNO-V-84-017, on 840331-0401,licensee Discussed Main Steam Safety Valve Failure,Inoperable Radwaste Valve & Loss of Control Room Annunciation2 April 1984PNO-V-84-017:on 840331-0401,licensee Discussed Main Steam Safety Valve Failure,Inoperable Radwaste Valve & Loss of Control Room Annunciation
PNO-V-84-023, on 840422,seal Water Leak Developed Past Mechanical Seal in Reactor Coolant Pump 14.Cause Unknown.Rcs Cooled.Problem Will Be Corrected Prior to Proceeding Further Toward Initial Criticality23 April 1984PNO-V-84-023:on 840422,seal Water Leak Developed Past Mechanical Seal in Reactor Coolant Pump 14.Cause Unknown.Rcs Cooled.Problem Will Be Corrected Prior to Proceeding Further Toward Initial Criticality
PNO-V-85-029, on 850518 & 20,reactor Trip & Safety Injection Occurred Due to Loss of Vital Instrument Ac Power.Caused by Failure of Transformer in Vital Instrument Ac Inverter IY-13 & IY-12 Output Breaker Tripping Open20 May 1985PNO-V-85-029:on 850518 & 20,reactor Trip & Safety Injection Occurred Due to Loss of Vital Instrument Ac Power.Caused by Failure of Transformer in Vital Instrument Ac Inverter IY-13 & IY-12 Output Breaker Tripping Open
PNO-V-85-031, on 850521,during Chemical Cleaning of Boiler, Sight Glass Fitting on Large Auxiliary Boiler Failed While Boiler at Approx 130 Psi Steam Pressure.Cause Not Stated. Plant Shut Down Since 850315 for Refueling Outage21 May 1985PNO-V-85-031:on 850521,during Chemical Cleaning of Boiler, Sight Glass Fitting on Large Auxiliary Boiler Failed While Boiler at Approx 130 Psi Steam Pressure.Cause Not Stated. Plant Shut Down Since 850315 for Refueling Outage
PNO-V-85-033, on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage6 June 1985PNO-V-85-033:on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage
PNO-V-85-033A, Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined10 June 1985PNO-V-85-033A:Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined
PNO-V-85-036, on 850618,facility Manually Shut Down from 15% Power Due to Flow Blockage in Main Turbine Lubricating Oil Sys.Turbine Must Be Secured,Vacuum Broken in Condenser & Primary Plant Cooled to 230 F.Shutdown Will Last 4 Days19 June 1985PNO-V-85-036:on 850618,facility Manually Shut Down from 15% Power Due to Flow Blockage in Main Turbine Lubricating Oil Sys.Turbine Must Be Secured,Vacuum Broken in Condenser & Primary Plant Cooled to 230 F.Shutdown Will Last 4 Days
PNO-V-85-037, on 850623,unisolable 20 Gpm Reactor Coolant Leak Occurred.Caused by Cracked Weld in 1-inch Diameter High Point Vent Line from Rcs.No Personnel Contamination or Radioactive Release from Reactor Bldg Occurred24 June 1985PNO-V-85-037:on 850623,unisolable 20 Gpm Reactor Coolant Leak Occurred.Caused by Cracked Weld in 1-inch Diameter High Point Vent Line from Rcs.No Personnel Contamination or Radioactive Release from Reactor Bldg Occurred
PNO-V-85-037A, initial Investigation Results Indicated Mode of Failure of High Point Vent Loop B Was Fatigue Cracking. Caused by Inadequate Class 2 Piping Support.Investigation Expanded to Include Walkdown,Per IE Bulletin 79-1428 June 1985PNO-V-85-037A:initial Investigation Results Indicated Mode of Failure of High Point Vent Loop B Was Fatigue Cracking. Caused by Inadequate Class 2 Piping Support.Investigation Expanded to Include Walkdown,Per IE Bulletin 79-14
PNO-V-85-038, on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged26 June 1985PNO-V-85-038:on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged
PNO-V-85-040, on 850708,licensee Informed Region That Site Unaffected by Current Brush Fires.On 850707,fire Caused 45 Minute Outage to Emergency Notification Sys8 July 1985PNO-V-85-040:on 850708,licensee Informed Region That Site Unaffected by Current Brush Fires.On 850707,fire Caused 45 Minute Outage to Emergency Notification Sys
PNO-V-85-047, on 850721-22,interference Problem W/Upper Lateral Support Bumper Block Assemblies on Steam Generators Identified.Originally Discovered During Hot Functional Testing in Late 1984.Bumper Installation Modified25 July 1985PNO-V-85-047:on 850721-22,interference Problem W/Upper Lateral Support Bumper Block Assemblies on Steam Generators Identified.Originally Discovered During Hot Functional Testing in Late 1984.Bumper Installation Modified
PNO-V-85-051, on 850804,two Earthquakes Measuring 4.6 & 5.5 on Richter Scale Occurred 70 Miles from Facility.Primary Seismic Recording Equipment Failed to Trigger as Setpoint Higher than Acceleration Experienced at Site5 August 1985PNO-V-85-051:on 850804,two Earthquakes Measuring 4.6 & 5.5 on Richter Scale Occurred 70 Miles from Facility.Primary Seismic Recording Equipment Failed to Trigger as Setpoint Higher than Acceleration Experienced at SiteEarthquake
PNO-V-85-053, on 850814,grass Fire Occurred,Burning Approx 80 Acres.Caused by Automobile Accident on Plant Access Road, Approx 2.5 Miles South of Plant.Licensee Requested Assistance from State of CA Div of Forestry15 August 1985PNO-V-85-053:on 850814,grass Fire Occurred,Burning Approx 80 Acres.Caused by Automobile Accident on Plant Access Road, Approx 2.5 Miles South of Plant.Licensee Requested Assistance from State of CA Div of ForestryFatality
PNO-V-85-055, on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days20 August 1985PNO-V-85-055:on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days