Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
AECM-85-0354, Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations30 June 1982Nuclear Qualification Test Plan for Generic Equipment Qualification for Grand Gulf 1 & Clinton 1 Nuclear Power Stations
ML15264A1572 January 1990Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21Health Physics Network
ML16152A8952 January 1990Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations.
ML17301A03930 April 1983Detailed Control Room Design Reviews Program Plan.Emergency Lighting
Backfit
ML17342B06430 December 1987Rev 1 to Independent Mgt Appraisal Program Plan for Florida Power & Light Co.Systematic Assessment of Licensee Performance
ML17345B40615 December 1983Public Version of Revised Emergency Plan Implementing Procedure 1301, Emergency Roster - Offsite Emergency Organization. W/831229 Ltr
ML17346A4608 August 1984Emergency Plan Implementing Procedure EPIP-1301, Emergency Roster - Offsite Emergency Organization.
ML17346A5391 September 1984Emergency Plan Implementing Procedure 1107, Duties of Emergency Planning Supervisor,Offsite Emergency Organization.
ML17346A5401 September 1984Emergency Plan Implementing Procedure 1211, Activation & Use of Emergency News Ctr (Turkey Point),Offsite Emergency Organization.
ML17347A22422 December 1986Emergency Plan Implementing Procedures,Including Procedure 1101, Duties of Emergency Control Officer,Offsite Emergency Organization & Procedure 1102, Duties of Recovery Officer,Offsite Emergency.... W/861222 Ltr
ML18025B8549 November 1979Revision R to Acceptance Test Procedure IT 527 P/N 1801104.
ML18025B85713 June 1979Revision T to Acceptance Test Procedure IT 519 P/N 1801102.Breakaway torque
ML18025B85916 February 1979Revision R to Acceptance Test Procedure IT 524 for 1801106.Breakaway torque
ML18025B86115 August 1979Revision R to Acceptance Test Procedure IT 523 P/N 1801103.
ML18025B86510 May 1977Revision J to Acceptance Test Procedure IT 534 P/N 1801112.Breakaway torque
ML18025B8687 April 1977Revision H to Acceptance Test Procedure IT 533 P/N 1801119.Safe Shutdown Earthquake
Nondestructive Examination
Breakaway torque
Overtravel
Earthquake
ML18047A3243 May 1982Requalification Program - Reactor Operator & Senior Reactor Operator.Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML18047A35131 May 1982EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package.
ML18092B49828 February 1986Number 1,Generator Operating Guide.
ML18092B49920 March 1987Artificial Island Stability Limitation Operating Restrictions.High winds
ML18130A26131 August 1979Cobra Iiic/Mit Computer Code Manual,Vepco Version.
ML18130A37621 September 1982Inservice Insp Program,Interval 2,821222-921222.Boric Acid
Stroke time
Hydrostatic
VT-2
Dissimilar Metal Weld
ML18130A38322 December 1982Inservice Insp Program,Interval 2,830428-930428.Boric Acid
Grab sample
Stroke time
Hydrostatic
VT-2
Dissimilar Metal Weld
Scaffolding
ML18130A3924 May 1983Offsite Dose Calculation Manual.Offsite Dose Calculation Manual
ML18130A4183 April 1986Revised Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel, Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr & Rev 2 to EPIP-4.03 Re Dose AssessmentHealth Physics Network
High winds
Grab sample
Earthquake
Fuel cladding
Fire Protection Program
ML18136A04524 August 1979Proposed Startup Test Procedure 1-ST-9,Revision 0, Voltage Profile.Reserve Station Service Transformer
ML18139A02631 December 1979Steam Generator Repair Program for Unit 2,Final Rept (Progress Rept 6) for Period 790203-1231.Scaffolding
ML18139B51530 June 1981Steam Generator Repair Program for Surry Power Station Unit 1:Final Rept (Radiological Progress Rept Number 5) for Period 800914-810630.Hydrostatic
Scaffolding
ML18139B5567 October 1980Preservice Insp Plan Associated W/Steam Generator Replacement for Surry Power Station Unit 1.
ML18139B55815 September 1980Insp Program Plan for Surry Unit 1 Power Station Refueling Outage Core V-VI 1980.
ML18139B8388 April 1982Emergency Operations Facility.
ML18139B92226 May 1982VEPCO Sys Operator Procedures Manual,Power Sys Emergency Operation.
ML18139C16118 November 1982Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure.
ML18139C18127 December 1982Inservice Insp Program,Revision 1
ML18141A04518 May 1983Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide.Boric Acid
Health Physics Network
Post Accident Monitoring
Design basis earthquake
Earthquake
ML18141A5052 February 1984Rev 10 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. W/840217 Ltr
ML18141A5301 March 1984Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737Backfit
ML18141A62118 May 1984Rev 3 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure. W/840518 Ltr
ML18141A72120 June 1984Rev 1 to Emergency Plan Implementing Procedure EPIP-4.24, Gaseous Effluent Sampling During Emergency. W/840620 Ltr
ML18142A0117 June 1984Rev 9 to Emergency Plan Implementing Procedure EPIP-3.01, Callout of Emergency Response Personnel.
ML18142A07511 September 1984Revised Emergency Plan Implementing Procedures,Including EPIP-2.01 Re Notification of State & Local govts,EPIP-3.02 Re Activation of Technical Support Ctr & EPIP-3.03 Re Activation of Operational Support Ctr
ML18142A0932 October 1981Rev 0 to Procedure 466, Insp Record Checklist.
ML18142A09419 November 1980Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys.
ML18142A0958 December 1981Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules.Safe Shutdown Earthquake
Earthquake
ML18142A0965 November 1984Procedure 466, Remote Multiplexer Integrated Functional Test Procedure.Safe Shutdown
ML18142A09715 January 1981Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards).
ML18142A09829 October 1981Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards).
ML18142A09910 December 1980Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly.
ML18142A10015 January 1981Rev a to Acceptance Test Procedure Atp 447, AD296-Q2-1,-2 Digital Pcba.Reverse polarity
ML18142A10126 February 1981Rev a to Acceptance Test Procedure Atp 451, PS294-Q2.