ARTIFICIAL ISLAND STABILITY LIMITATION OPERATING RESTRICTIONS Introduction 01 7-8-04 Sheet 1 of 6

This instruction will serve to provide operating guidance concerning the stable operation of Artificial Island during the extended outage of Keeney-Hope Creek 5015.

  • General Generator Stability Limits Concern for stability is based on the need to operate the system in a manner which will allow generators to remain synchronized with the bulk power system.

Remaining in synchronism is very much dependent on transmission system configuration and generatiion.

The proper control of voltage plays an important role in helping to maintain stability in the system as wel 1.

Rapid changes in the system Csuch as the loss of a major load *c~nter, a large generator, line switching, or a fault occurrence, etc.) have the potential to upset generator s1nchronism.

As a System Operator, the safe and reliable

-operation of the system depends on the ability to recognize that load, excitation levels and var requirements all influence the ability of generating units to remain synchro-nized under adverse conditions.

Increased Mvar output is necessary to maintain stable operation should the next worst contingency happen (such as the loss of the Salem-Deans line, 5021).

Under contingency conditions, the system may not be able to handle full Mw output from the island; therefore, output must be reduced.

The stabi 1 ity guidelines for each machine mu*;t be careful l i fol lowed by both System Operators and Plant Operators.

These are provided at the end of this instruction.

The v o 1 t a g e r e g u 1 a t o r w i 1 1 n o t p r o v i d e m i n i mum c o v e r a g e f o r t h i *;

case.

Due to the extreme importance of maintaining Mw and Mvar 1 imits, one system operator will be assigned solely to monitor and control system voltages.

5021/Salem No. 1 Cross Trip The cross trip scheme has been installed, where the trip of 5021 or the opening of both 5021-500 Kv breakers at.Sal em Jr" Deans causes Salem No. 1 to trip, which eases overall operating restrictions.

The cross trip should be in serv1ce at all fimes except as outlined below.

Following operation Date Written 3-20-87 Date Revised

  • Denotes Changes Written by LJM:edl Approval by P..ww

(~ -8764070353 870403 PDR ADOCK 05000272 p

PDR Distribution Gen. Mgr. -

Salem Gen. Mgr. -

Hope Cree~

Mgr. -

Planning Mgr. - Substation

ARTIFICIAL ISLAND STABILITY LIMITATION OPERATING RESTRICTIONS 01 7-8-04 Sheet 2 of 6

of the crciss tripping, the remaining units CSalem No. 2 and Hope Creek No. 1) will remain stable on 5023 and 5024.

This will allow all three units to operate.:;.tan* island tiJtal of approximately 3100 g~oss Mw (from Appendix 8).

Cross trip is to be in service 8xcept under the Pollowing conditions:

a.

Island gross tot a 1 is below 2330 Mw due to unit reductions or unit outages with a 1 1

. ' 500 Kv lines in service (refer to Appendi:< 8)

b.

Thunder and 1 ightning

c.

lee/winter storms d

  • Forest fires
f.

Required maintenance work With the return of a unit, enable the cross trip when the island total reaches 2330 Mw C790 Mw on each Sa~em unit and 750 Mw at Hope Creek).

If the cross trip is unavailable when a unit is returning to service, begin reducing the in-service units after the returning unit is synchronized, to maintain an isiand gross Mw output not to exceed 2330 Mw.

Cross Trip Disable To reduce the risk of unnecessary outages on Salem No. 1, adhere to the following guidelines:

Total Island Mw Output Reductions

-Whenever the island gross total is less than 2330 Mw due to a unit outage or reduction, and all 500 Kv lines are available, follow the attached guidelines for the appropriate Mw le~els.

The cross trip shall be disabled at both Salem and Deans when Mw reductions are complete.

S t o r-rr1 S i t u a t i o n s

a.

Thunder and lightning--Whenever storms are within SO miles of Salem. New Freedcim or Deans (as inditated by contracted weather services, Atlantic Electric back-up or OPL storm scope).

The machines will be reduced to the appropriate guidelines for 3-machine/3-line operation with

~G cross trip.

The cross trip scheme shall be disabled upon reaching final Mw values.

Date Written 3-20-87 Date Revised

'i<Oenotes Changes Written by LJM:edl Approval by

~WW Distribution Gen. Mgr. - Salem Gen. Mgr. -

Hope Creek Mgr. -

Planning Mgr. - Substation

ARTIFICIAL ISLAND STABILITY LIMITATION OPERATING RESTRICTIONS OI 7-8-04 Sheet 3 of 6

b

  • Ice/Winter storm--Whenever i~ing conditi~ns are predicted by the weather service or confirmed by field reports in either Camden, Trenton, or.

Brunswick Division, the appropriate Mw reductions wi 11 be made for 3-machine/3-1 ine op er at ion and the cross trip disabled.

Similar action should be taken during any winter storm condition if transmission security is in jeopardy.

c.

High winds/Hurricane--Whenever winds are in excess of 50 mph as measured at Camden Switching Station, Deans Switching Station or Artificial Island, the appropriate Mw reductions will be made and the cross tripping scheme will be disabled.

d.

Forest Fires--Whenever forest fires are reported in the area of the Salem/Deans/New Freedom right-of-ways, the appropriate Mw reductions will be made and the cross tripping will be disarmed.

500 Kv line outage lf any one of the three remaining lines comes out of service, reduce all three units to 650 Mw gross and a minimum of 100 Mvars per machine

  • Voltage Regulator Out of Service If a voltage regulator is out of service, reduce 200 Mw on the affected unit until the regulator is returned to service.

Emergency Repairs/Forced outages Emergency repairs may be performed on a p~iority basis without additional action, except those facilities associated with 5021.

5021 -

any work affecting 5021 will require the cross tripping scheme to be disabled and appropriate MW reductions made:*

a.

any relaying on 5021-regular and back-up relays and transfer trips.

Date Written 3-20-87 Date Revised

-1<Denotes Changes Written by LJM:edl Approval by R.!J.Jw Distribution Gen. Mgr. -

Salem Gen. Mgr. -

Hope Creek Mgr. -

Planning Mgr. - Substation

ARTIFICIAL ISLAND STABILITY LIMITATION OPERATING RESTRICTIONS OI 7-8-04 Sheet 4 of 6

b.

breakers - Salem 500 KV-Section 1-8, 2-8 Deans 500 KV-Section 1-5, 2-5 Deans 230 KV-Section 2-8, 7-8 Deans 500-2 transformer and any disconnects assoc1atpd with these bus sections.

To further insure system integrity, T&D has increased the frequency of line patrols.with specific emphasis on the cross over area near New Freedom.

Maintenance Work No routine work on the facil iti~s 1 isted in Appendix A wi 11 be performed, especially where human error ma'{ be a factor.

Specifically this includes:

a.

No line outages

b.

No in-service relay work--the relay technicians are discouraged from working at locations where any mishap may have an impact.

c.

No hot line work

d.

No substation work (i.e. breakers, disconnects) at any 500 Kv station

e.

GETAC work by the laboratory must be carefully evaluated. ~_Request a relay technician to assist in the repair or diagnosis.

Cross Trip Disable/Enable Procedure The two cutoff switches used to disable the cross trip scheme are located one each at Salem and at Deans.

Disable

a.

Whenever it becomes necessary to disable the cross trip scheme, unit output at Salem and Hope Creek must first be reduced to appropriate levels.

b.

Request an operator at Salem and Deans to turn the cutoff switches to the "off" position and apply a r'ed blocking tag for the system operator. C5021/Salern No.

1 cross tripping cutoff switch)

Date Written 3-20-87 Date Revised

  • Denotes Changes Written by LJM:edl Approval by Distr*ibution Gen. Mgr. - Salem*

Gen. Mgr. -

Hope Cree~

Mgr. - Planning M*:ir. - Substation

ARTIFICIAL ISLAND.

STABILITY LIMITATION OPERATING RESTRICTIONS OI 7-'-8-04 Sheet 5 of '6

c.

Log all information in the South Switching log.

d.

Verify via the ESOC computer alarms that both cutoff switches are in the "off" position.

e.

Notify the Salem and Hope Creek senior shift supervisors that the cross trip scheme has been disabled.

Enable

a.

Request an operator at Salem and Deans to turn the cutoff switches to the "on" position and remove the red blocking tag for the system operator.

b.

Log all information in the South Switching log.

c.

Verify via the ESOC computer alarms that both cutoff switches are in the "on" position.

d.

Notify the Salem and Hope Creek senior shift supervisor that the cross trip scheme has been enabled.

e.

Increase unit output at Salem and Hope Creek to appropriate levels

  • CONDITION Cross Trip Available Cross Trip Unavailable One Line Out of Service SAL 1 1162 790 650 SAL 2 1000 790 650 NOTE:

Incorporated into documents given to the NRC.

Distribution H/C 1000 750 650 Date Written 3-20-87 Written by LJM:edl Approval by Gen. Mgr. - Salem Date Revised

  • Denotes Changes e.1.u w Gen. Mgr. -

Hope Creek Mgr. - Planning Mgr. - Substation

ARTIFICIAL ISLAND STABILITY LIMITATION OPERATING RESTRICTIONS APPENDIX A NO ROUTINE WORK ON THE FOLLOWING LINES:

500KV 5023 5024 5021 5019 5016 5017 5018 230kV K-2237 R-2244 W-2223 C-2255*

I-2235 P-2242 0-2241 E-2231 U-2247 C-220-29 D-220-30 2304 220-38 220-53 220-35 Hope Creek-New Freedom Salem-New Freedom Salem-Deans Deans-Branchburg Branchburg~Alburtis Branchburg-Elroy Branchburg-Ramapo New Freedom-Beaver Brook New Freedom-Monroe New Freedom-Cox's Corner New Freedom-Silver Lake Beaver Brook-Gloucester Gloucester-Deptford Deptfort-Mickleton Cox's Corner-Camden Silver Lake-Cox's Corner Richmond-Camden Cox's Corner-Burling-Croydon Monroe-Mickleton Mickleton-Trainer Chichester-Train Waneeta-Richmond Auto Transformer 500-2,3&4 New Freedom 500-1,2&3 Deans 500-1&2 Branchburg SOOkv1 5014 5010 5030 5029 Philadelphia Electric Peach Bottom-Keeney Peach Bottom-Limerick Whitpain-Limerick Whitpain-Elroy Date Written 3-20-87 Written by LJM:edl Approval by Date Revised

-+<Denotes Changes OI 7-B-04 Sheet 6 of 6

Distribution Gen. Mgr. -

Salem Gen. Mgr. -

Hope Creek Mgr. - Planning Mgr. - Substation

APPENDIX 8 SALEM 1 OPERATING GUIDE Ci.JRvE NO.

JO I 01 7-8-04:

ISSUED BY:

o 3/2o;a1Rww 00-t WITH SALEM CROSS TRIPPING SCHEME'.

SALEM 2 ON AND HOPE CREEK 1 ON SYSTEM PLANNING DEPARTMENT OUTAGE:

5015 (HOPE CREEK - KEENEY) 1

:: _,_--75.....,.1-PS_l_G _J' 2

~~~'rli ~~~:~~~:~~~:,.-,_ ------*+-------~+i~~~:~~~~~~~~:1 ~~~:1~~~:-f_-_ ---_:

-t---___

No'RMAL OPERATING PR 1

ESSUR~

I i

I I

I I

I I

800-- 60 PSIG H 2 I

MAXIMUM r-1-t-' _ _j____

1 TURBINE 1 ---.

~...........

CAPABILITY i

700+---+---+---+---t--=-..!.:=--+--+---+-~-.d---+--+---....--.;._--'

  • S,PSIG ~* L 1-----r----,______

-I'~

I 600+---+---+---+-~-===-----+--+-~~---'---+-~.,..--l----~'---

I 11~ ~

~

i soo:=~lEM ST!:P-UP(RANSf"ORMER TAP': 1.0921~~ ~"\\ \\\\

400 I

~

\\

~

I

\\

I 300--~>

I

\\

I 0

ARTIF"ICIAL ISLAND

\\

\\

. I

\\ I I

I AT ~ 162 M,W I

I

- \\

I 20 0 ;--~--r-----t--t---tl-+-1

--+l--+----l----t+\\--+-+\\-1--4---+-+-~

ART1F1CIAL ISLAND ~=~=~~~~U.--il

_ _JI 100 +---+----+-------~--

AT 2862 MW

~

I I

0-+---~---+----+----+--~--------..... ------------------~---~---'

I

-100-r--~--T---+---i~-+---+----l---+---+--+-+---+-+-f----+1----!

-200-+---t---+---+---+-*--+---+--+---+--+---++-l-+-~-!--+l+-___.I I ; I I

-300 __ ~ -r-~---+---+--.,.__--+--+---+--1--/--+---l-v~~,

1

~

1 1

-400--c-+---+---+---+--------~---'----+--~---r---..,...:i...---+_...~__.---4:

~

I,,/,_,,/ /v'/ I I

-500-r--~--+~~,

~-t---"'---+---~1V"~.~~--___.._..,....~~1~~-¥'-+--+-~~i.~~


~ ----

-~

I

-G 00 1~~~~~~E:::1*:::::~===P~c:::r~r--1--1-:-n----r~

-r--.....~~-+---~l----=t:::=-----~

1.*

i

~100~-,---t-~-+--.--+-~~~--,'----+---~_._---+--~~~__._~__._~~-----1..----.:

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 MEGAWATTS i13CROSS

I

~

i I !

I

  • ~

c...:>

w

~

(/)

(/)

Q.

a::

C)

--*~':.

~-

APPENDIX 8 01 7-3-04*

0 3/20/87 ~UJJ d,<_~

HOPE CREEK 1 OPERATING GUIDE WITH SALEM CROSS TRIPPING SCHEME SALEM 2 ON AND SALEM 1 ON ISSUED 3Y:

SYSTEM PLANNING DEPARTMENT OUTAGE:

5015 (HOPE CREEK - KEENEY) 1000..,----,r---~--,---~--*-r1----1;----;--------------------------------

75 PSIG H 2 I

. I 900-+===~1====i===--~~+-~-t-~_:__~-1-~J.~__J~~~. ~_j_~_j_~~~~

50 PSIG H 2 OPERATING PRESSURE I

I I

I i

800 +----t-I. ---+-1

__;=-!~:::;;:!i---l_:=-t-----+*----t--___.::::::i--

1 -~::::---l:----+-*

--~; MAXIMUM I

I I

TUR 81 NE. i 451 PSIG ~ 2 I

i

CAPA~ILITY !

100-p====r=--t-==~:::t-~t--~~~:::::::::::~~--t.=:::::..~~-t-~----:--~~~-

500-t--t---I -+l--t-1 --t-N--l-+-i.

~:-i-~--+-1

~""" ~~ ~~"~:

I l

"'-.~

\\I HOPE CRK STEP-UP XF'MR TAP= 1.092 I

..........._r-...

i'..,

500-t----:-' ---+'----1r----~:----+1 ____ ~i ---+----11~"'-~+---~I--"'"~~~~*__. __ ' __ _

8 i 1.*

I i

I I

I "~ \\~

i -~-r-----r---t----~--+---------+-----l.*----1~--.ft----~l-+-\\--L'I.\\--___;_ __ __

____ g+-_r1:~t----~-+~+i~+--+-I ~f--~\\-\\--+---\\~l_\\~1~:

~ '

I I

I

' I I,; ' \\

\\ i \\

400 300 200 100 i

I

~/ 1 I

0

-100 I

l I

I 6 ! s TA 81 ~I TY LI~ IT i

-100~.----~1...-+1----1----+!----:---.--;..-1--~~-..-4:----+-1 1 --.-___...:---.--.L-----.---------

-200

-300

-400

-500

-600 I

____ ~ +---+---t----1..---f--____._i --il~I -+-I __,_i-+--7 +--I-/_! -1 ____.:

-~;~1 ____,_

1


!-____ : ____ ~1 __ _._1 ____ ~

1 1 __ __.1~~~--:--~u;___~:--'-/ ___ ; __ ~

31 l

~~L--(

ii~~'.'"

~~I/

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1-10 J

. GROSS MEGAWATTS HC3CROSS

I I.

I I

I I

I I

I

~~

i I

I 4:

c..:>

w

~

V1 V1 0

~

c..:>

SALEM 2 OPERATING GUIDE Ci.JRVE NO.

iG.3 01 7-8-04:

APPENDIX B 0 3/20/87 ~;Ju)

1071-WITH SALEM CROSS TRIPPING SCHEME SALEM 1 ON AND HOPE CREEK 1 ON ISSUED BY:

SYSTEM PLANNING DEPARTMENT OUTAGE:

5015 (HOPE CREEK - KEENEY) 1000 I

I i

I I

75 PSIG H2 I

I I

I I

i I

I I

i 60 PSIG H2 I

--t:ORMAL OPERATING PRESSURE I

r---........_

I i

I I

i--

MAXIMUM

~

TURBINE 45 PSIG H2 CAPABILITY i

I I

~

r---

~ *~

r---,

I I

I~

........ \\!

I SALEM STEP-UP TRANSFORMER TAP= 1.092~

~

I I

I I

I i'....

I i

I

............ ~

\\

\\ I\\

i 0

i w

--1-u

\\ \\ \\

i w

a::

_.._w

~ \\

I \\!

i 0

~

v \\

I

~

I i

I

/

I I

900 800 700 600 500 400 300 200 100

-100

-200

-300

-400

-500

-600 I

I I

I I

I I

i I

I I

Q I

I I /,

I w

I-u I

) u I I j

x I

I w

/

i I

a::

w i

I

_....__a zl I

I I

~

l...--"'

((

I

l I i

v--L---:--

I I

I I

L.--:

I I

I t::::;::-:

~ ~

I I

I I

~

i t::---

I I

I I

I i

I STABILJTY LJMIT I

I I

I I

0 I

I I

l r

I I

I I

100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 GROSS MEGAWATTS S23CROSS

SlOP 3/20/87 J

~\\,Iii.;

oa1 SALEM 1 OPERATING GUIDE SALEM 2 ON AND HOPE CREEK 1 ON OUTAGE:

5015 (HOPE CREEK - KEENEY)

CU~VE ~O.

01 7-8-04:

!SSUED BY:

SYSTEM PLANNING JE:fARTMENT 1000,------,------.,..---------~------------------~

I I

i i

900 +--.75* PSIG Hz----~--------------------~----

I I

NORMAL OPERATING PRESSURE a o o +- 60 i PSI G H

=-z -------___;:=-~------~------ MAXIMUM ruRSiNE:

CAPABILITY 1

700-+---""---i-------=--""""=.:----------=:::::.....::1---------..:.._~------

4.5 PSIG Hz I

200 j

100 I

  • I I

0 i

i

-100 1

-1 I

I

'i i

  • i 0

I i..J I

-300~5-.--~--+---..,----+---..._ ______ _.__ ___

+-----+-i,__--+----~

~

>( '

~

w '

I Q::

~'

-4.00 -'.- 0 --------------------..,,,C....----"----1---1-----

z

-soo-;---------~----------~---_.c..----..,,L-1---~---

1 i

-700-------~-------.-------~. --,---,-----'L...-,.-----

0 100 2 o

  • 300 4.00 soo soo 100 aoo goo 1000 1100 1200 1300 GROSS MEGAWATTS

i I I V1

  • ~

I

.I I

(.;)

w

~

V1 V1 0 a::-

(.;)

S20P 3/20/87 ~v' d~~

1000 i

75 PSIG H2 900 60 PSIG H2 800 45 PSIG H2 700 SALEM 2 OPERATING GUIDE SALEM 1 ON AND HOPE CREEK 1 ON OUTAGE:

5015 (HOPE CREEK - KEENEY)

NORMAL OPERATING PRESSURE i

CURVE NO.. lOS 01 7-8-04:

ISSUED BY:

SYSTI:M PLANNING DEfARTI.4ENT MAXIMUM ----

TURBINE CAPABILITY 600~1--...;.._ ______...._ _______

~"""':::----i--_;::,,,~---~~~-----

1 SALEM STEP-UP TRANSFORMER TAP = 1.092 500 j 400~

1

~I W1 il: I 3 o o

~ --

1

______ _._I _ __. __

. -+-

1 --r--------i+---~--+--+------4----i-...--4~--

o~-+-~~I---'-~~~-

'\\

I/

I

. -1

-100 I. !

-200~*----..,.......--""-----------.----+--..__-+----++---+-"-----

-300...i.-~.1--+--~----.--~------_._----~~___.___,~;__-+---~

I u:

I J

x I I

i

~I I

-400+--~..;_ ________ __;. ____

~

....,..=::...-__ -=-=---!----+-----

i

I.

-500-+-----------------...,.....~=-"":::::t:..-_..,==--....::::::~---+--~

~

-soot:~~~:e::~~~~::=::=:=_~~~~~~~~~~-L~~~~

i

_2'.

STABILITY L:MIT

-700~,--------------.---------,---.---.----.-,---.-+----...__.----~

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 IJ.08 GROSS MEGAWATTS

(/)

a:::

VI Vl 0 a:::

0 3/20/86 J' r,.

1000 I

i 75 PSIG H 2 900 I

\\

J 60 PSlG Hi I

HOPE CREEK 1 OPERATING GUIDE SALEM 2 ON ANO SALEM 1 ON OUTAGE:

5015 (HOPE CREEK - KEENEY)

I 800 I +-~~~~~;:==---==~-~~---~~"-:::::--~~----___;_' MAXIMUM i

45 PSIG H 2 TURBINE CAPABILITY 700 l

HOPE CRK STEP-UP XF"MR TAP= 1.092 CURVE NO.. 106 01 7-8-04:

ISSUED 9y*:

SYSTtM PLANNING OEfABrMENT 500~

1~---__..~-------~-----:--~~~~~-------~~+--_._---~t--~-4-~..,.-~~

f

! 1 O*

400+-i;:

J u,

I Cj !

+-0:'

.300

~'

Oj 200

  • 1*

100.

0 i

I*

-100

-200

-.300

~ I Lu

)( I l..J I

I a:: '

1, l..J.

-400.

a-. --

i Z!

'::;)

-500

~ STABILITY LIMIT i

100 200

.300 400 500 600 700 800 900 1000 1100 1200 1300

!400 GROSS MEGAWATTS COP

(J1

~

<t

~

c.::J u..J

~

(J1

,(,/)

0 0::

c.::J 1000 I

I

,I 900 75 PSIG H2 800 60PSIGH2 700 45 PSIG H2 SALEM 1 OPERATING GUIDE SALEM 2 Of"F' ANO HOPE CREEK 1 ON OUTAGE:

5015 (HOPE CREEK - KEENEY)

CURVE NO.: 10 7 01 7-8-04:.

ISSUED BY:

SYSTEM PLANNING DEPARTMENT

~AXIMU~

ru RSINE CAPABIL!TY 5004---~--__;, ___

_;;:,,,.,_=-------+--~.,....------~,..-.f--~~~-

so 0 i-SALEM STEP-UP TR ANSF"O R MER TAP = 1. 0 92 1~------..,...----+-+-----

i 8 400

~-------:-------,--~----""'o~-~--ii---f--+--~

u~

x*

l.J.

a::.

300

~~.-----------+---+-----'--~--IHl----"4-...._--+-__;._-~

o, 200 100

  • ' I

-700~-----.---------..------------....-..------.----------

0 100 200 300 400 500 600 700 aoo 900 1000 1100 11260 1300 1J.0u GROSS MEGAWATTS 3120P

i

. 3/20/87 I

~-;z.;.

SALEM 1 OPERATING GUIDE SAL£:M 2 OF'F' AND HOPE CRE£:1< 1 ON OUTAGE:

CURVE NO. l'Ja 01 7-S-04:

ISSUED BY:

J 5015 & 5021 (HC-KNY AND SAL-DNS)

OR 5015 & 5023 (HC-KNY AND HC-NF')

OR SYSTEM PLANNING DEPAffDdENT 5015 & 5024 (HC-KNY AND SAL-NF')

ooo--~~~~~--~~~-

OR i

! 50151 !.c 50~7 (HC~KNY ~ND H~-SAL)I I

900-,__:7SPSIGH2~_...~~~~.__~+-~-r~~~--i~~...._~~

1~~~~~*~~

j ~AL

~PERA;ING PR:ESSURf i

I 800 -- 60, PSIG H 2

MAXIMUM Ii

~I

'1 1'

TURBIN.E r1,*--r 1--l__

I CAPABILITY 700 I

SOOr::_4_5_:-:P::S::IG::H:

1 2;:::~}!._____::~;oi:::::-___;,_:~

_ ___;,_*~-.:-*~~i~-~~j

_ _._! ---=~* --1--'~i _*_:,___~

I.! I :~

i 1-------~ l'N 500 -- SALEM SrEP-UP TRANSF'ORMER TAP = 1.092 ~* '"\\

I l

I I

0 I*

i L.J I I

I I

  • I 1\\*

I\\ \\

400---5, I;

i I

i

  • ~

~I i

I j

I

\\

I tJ1 300 -- L.J i i 200 15 I

i I ! *

! \\ I I \\I

(.,.

100 I

V1 0

a::

(.;l i

I i

I 100

-2 00. §I

-3 00---

u

)(

L..I Q::

-4 00-L..I

-a

-5 00

~1

-6 00

.-700 0 300 I

100 I

200 s1202v l

I I

I I

\\

I\\

\\

!/

\\

I J I /I 1./1 T/

I Ii I :/Jy 1

/

i I/!,

j/'

I 1// l A" L./1

~/Vi i

I 6

STABILITY WAIT I

I I

i I

I T

I I

I I

400 500 600 700 800 900 1000 1100 1200 1300 GROSS MEGAWATTS 1400

3/20/87

  • ~;/

Cl 1.,.,,_f

~,

75 PSIG H2 400 SALEM 2 OPERATING GUIDE HOPE CREEK 1 ON ANO SALEM 1 OF'F' OUTAGE:

5015 (HOPE CREEK - KEENEY)

CURVE NO.: 109 01 7-8-04:

ISSUED BY:

SYSTEM PLANNING DEPARTMENT MAXIMUM TURBINE CAPABILITY

  • ~

.300

~

8

~

vi 100+-........... ---..................-+-~_,...~--i~........... +-........... -+~~+--........... 4-........... --+~.......--1---+--+-.......-'4-'l--.......-44-.......--..

vi 0

a::

~

04----+----------*1----~-------.... ----1----.... ------~---1---.... ~--,_,j.--......;

-100+-........... __.,.......-.......-..._.......----;-l.......-~..._,...__-+-.......-...............-.......-+--.......--+-~--+~.......------+--'-.......-l-+-I'--...........................-__

-200~.......----.......-.......-+-.......--+.......-~--.......-4-.......---+.......-.......-+--.......--+-.......---+.......-.......-.......--+-+-.......-W.-L----l.....I-~

-.300

-400 Q

W.I

...;.._.......--1-.......-.......-....._.......--1-,...__~,...__,...___._,...____._~......... i....-~.......-.......-.......--+-.-------4-.......-~i--.......-~

u

)(

W.I

~

I

~.;_,...__...,.............-.......-................--+----+-.......-~................-....;..-.......--.;....~.......--'"-.......-----=-~=---,1-----1-1.......-.......-~-

Z 1

=> I 6

STABILITY WAIT

-700-"------I-.---.---~,--.......-..--.............._........... __;..,...__........... ~.......---.---.-~.......-..--~--...........................-_~, --JL-..,..---.......-.....-.......--.

0 100 200

.300 400 500 600 700 800 900 1000 1100 1200 1.300 1400 GROSS MEGAWATTS

'S220P

3/20/87

. I

µv A;..,1f

()

SALEM 2 OPERATING GUIDE HOPE CREEi< 1 ON ANO SALEM 1 OF'F' OUTAGE:

5015 & 5021 (HC-KNY AND SAL-DNS)

OR 5015 & 502.3 (HC-KNY AND HC-NF')

OR 5015 & 5024 (HC-KNY ANO SAL-NF')

1000.....---------.......----~

OR 5015 & 50.37 (HC-KNY AND HC-SAL) i 75 PSIG Hz CURVE NO.: 110 01 7-8-0.4:

ISSUED SY:

SYSTEM PLANNING DEfARTMENT MAXIMUM TURBINE CAPABILITY 600-t----r1------+------:---~.;:::,,,,,,:::::-'.__ _ _.__ _ _;::::.....::--+----.;::::,..,_l.--J __

_;__~

I 1 SALEM STEP-UP XFMR TAP = 1.092 500-+-~~~.;_;__~~~:----:~___;_~~~--+~~~~~~-+-~~.--~

400 300

-300

-400

.6.

STABILITY LIMIT

-700~,--------:--..,......-......-----:..-...-r---_;__,:..___,. ___.--..;...........,.......---..-----.--~~----~

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 GROSS MEGAWATTS S2202V

3/20/87 cl~ ~"'u!

HOPE CREEK 1 OPERATING GUIDE ONE SALEM UNIT ON AND ONE SALEM UNIT OF"F'.

OU TA.GE:

SO 15 (HOPE CREEK - KEENEY)

C'JRVE NO.

01 7-8-04:

ISSUED BY:

SYSTI:M PLANNING DEPARTMENT Vl a:::

~

(..:;)

w

~

Vl Vl 0 a:::

(..:;)

1000

\\

75 PSIG H 2 900 60PSIGH2 800 45 PSIG Hz 700 I

I I 1 600 HOPE CRK STEP-UP XFMR TAP = 1.092 500 !

1 a

400-i -g 1

~.

3001s=

1 0

i i

200 1--:

100 '

0

-100:

  • I I

' MAXIMUM TURBINE CAPABILITY

.~ STABILiTY L.~IT

\\

I:

I

-700-'-----,--------,--,----~-------.-,..--__.......,--_._ ______

0 100 200 300 400 500 eOO 700 800 900 1000 1100 12JO 1300 i.1J.:'

GROSS MEGAWATTS HC20P

' 1000 900 800 700 600 500 400 VJ 300 a::

<(

~

200 c.:J w

~

VJ 100 VJ 0 a::

c.:J 0

-100

-200

-300

-400 I

75 PSIG H2 i

HOPE CREEK 1 OPERATING GUIDE ONE SALEM UNIT ON ANO ONE SALEM UNIT OF'F' OUTAGE:

5015 & 5021 (HC-KNY ANO SAL-DNS)

OR 5015 & 5023 (HC-KNY ANO HC-NF')

OR SO 15 & 5024 (HC-KNY AND SAL-NF')

OR SO 15 & 5037 (HC-KNY ANO HC-SAL)\\

i i

I

~ORMAL OPERATING PRESSURE j

60PSIGH2

+---+---r---=~-==,.--;.--..;.__ _ __.__-=......,,,,....--...:....... _ __;__~I MAX; MUM I TURBINE

! CAPABILITY !

I 45 PSIG H 2 I

I HOPE CRK STEP-UP XF'MR TAP = 1.092 I

[.

  • .I.

I I

1\\

STABILITY LIMIT CURVE NO.: 112 01 7-8-04:

ISSUED BY:

SYSTI:M PLANNING DEPARTMENT

-700~,----..,._....,..___,....__,...---..----------..,.------~--~+-----~L------------

0 HC202 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 14.QJ GROSS MEGAWATTS

  • ~

23 w

~

(/)

(/)

0 a:::

l'.)

i SALEM 1 OPERATING GUIDE SALE14 2 ON ANO HOPE CREEi< 1 OF'F' OUTAGE::

5015 (HOPE CREEK - KEENEY) 8 0 0 t-60 ! PSI G H -2 ______........::::::-.....c,.----+-=' *------

1-i*--r-~--

CURVE NO.: llJ 01 7-8-04:

ISSUED 8Y:

SYSTEM PLANNING JE?AIU'ME:NT MAXIMUM TURBINE:

CAPABILITY I

700 I

-'--~~-=~=---~~--~~~~~~~--1.-~~~-

45 PSIG H 2 I

I 500 SALEM STEP-UP TRANSF'ORMER TAP = 1.092-----

1 4.00L-~-*------------------:-'----~~--.(l~-~--l--l,..----

1

u.

X'. !

l..J i I

300

~~:----~----------------'--l-~--!...-\\--1-;__~\\--~

0 I

\\ \\ \\

200"t""""--:------:---:-----:---i-----:----------t-+----+11-----'-~~

j I

1

-100T----+------r---~--+---:---+---~----'---+----..._--~*-~

/:

-200T---------1------:~--------.,...--.,.._------'---+----'--..---"--'---~

L 8i I

/:

-300

=~:~~~~~~~~~~~~~~~~~~--+-~~r/+-~--~~

J j :

I 1

a: !

-4.00t--azw_: _________

--'--------~---,"-----r--+--..;..._--~

I

/:

-500 1 ~

/

'/

-eoo~l_.,.. __________ ___;_ _____._---~~-----.!---'

I -L i

.1

-r--6.

STABILITY LIMIT

-700.......... ______ _,_----

1---.,-------'-------.--,

0 100 200

.300 400 500 600 700 800 90lj 1000 1100 ;1200 1300

!J.QO GROSS MEGAWATTS 1

S120P2

(./)

~

~

(.:)

w

i

(./)

(./)

0

~

(.:)

1000 '

I I

I SALEM 1 OPERATING GUIDE SALE>.t 2 ON ANO HOPE CREEi< t OF'F' OUTAGE*

50 tS & 5021 (HC-KNY AND SAL-DNS)

OR 5015 & 5023 (HC-KNY AND HC-NF)

OR 5015 & 5024 (HC-KNY ANO SAL-NF)

OR 50 tS *& 5037 (HC-KNY AND HC-SAL)

CURVE N0.114 01 7-8-04:

ISSUED BY:

SYSTEM PLANNING JEFARTMENT 1

. I 900 +--- 7S 0

PSIG H. 2-----------------------------

1 I

500 -i-- SALE~ STEE-UP TRANSFORMER TAP = 1.092 I

I

  • I 8
  • I 4.00 r-=.

U.

)( I 1

w:

a:::.

300-r-~:

O*

I 200 I

100 0

-100

-200 J

0 w

-300r~

-4.0 0 -;--- 25 :

Z' 1

-500 I I

-500 1

-700 0

100 200 300 4.0 0 500 600 700 800

. GROSS MEGAWATTS 900 1000 MAXIMUM

,..'JRBINE CAPABILITY 1100 i 1200 lo I

1300

!.iJ J

V1 a::

<{

~

c.,:,

w

e V1 V1 0 a::

c.,:,

t 75 PSIG H2 SALEM 2 OPERATlNG GUIDE SALEM 1 ON AND HOPE CREEi< I OF'F' OUTAGE:

5015 (HOPE CREEi< - KEENEY)

CURVE NO. 115 01 7-8-04:

ISSUED BY:

SYSTEM PLANNING

'.)E?ARTMENT 900..+=::::::::;::=::=+/-::::-.....~:::::-_;,_ __ _;,_ __ ~.---+----+-, __ _J_~--L---L __ _i_ __ _.:._~

NORMAL OPERATING PRESSURE J

I aoo-+-~-+~~__;:==...... -=::=:--+-~~~~'"'---=~0:::---+~~1--~-1-~ MAXIMUM i

TURBINE 60 PSIG H 2 45 PSIG H 2 CAPABILITY I

I 1

I Oi 400t:;.

u, XI W*

a:: I 300 w >:

01 I

200 100 I

. I 0

I

, I I

-100

-200

§I

-300. ~I

-400 wl

~I

~I

-500 I I*

-600

/\\

STABILITY L!MIT

-700 '

I I

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 lJ.0 0 GROSS MEGAWATTS S220P1

(/')

  • ~

c.;J w

~

(/')

(/')

0 a::

<.J 3/20/87 oI

(

~}

SALEM 2 OPERATING GUIDE SALEM 1 ON ANO HOPE CREEi< 1 OF'F' OUTAGE:

5015 & 5021 (HC-KNY ANO SAL-DNS)

OR 5015 &: 502.3 (HC-KNY ANO HC-NF')

OR 5015 & 5024 (HC-KNY ANO SAL-NF')

OR lOOO.......----.------i--~--5015 &: 50.37 (HC-KNY AND HC-SAL)I 75 PSIG H2 CURVE: ~O. 116 01 7-8-04:

ISSUED BY:

SYSTEM PLANNING

~E:fAR'ENT 600-+--~---:------------~o::-------;:::,,,,..,..------~~~----~

i SALEM STEP-UP 1

XFMR rAP = 1.092 soo.+-~-----------~~---------~--__;-~~~~-~---

1 8 '

400+--=~--------------------....,Q,,--....--.+.---.:i...---1---:....---~

I

~ i l.J ;

I 0::: I I

l.J+--~-~------:--:~------+-__;_*_* ---!..4--'----\\,1-....:.....---l....----

> I 300 ol 200 100 i\\

J I

0

-100

-soo-,---------

~

-6001==~~::_~~:::::::;:=;~~~========-~~~~~~~~~~-1~~~~~

STABILITY L!MIT

. 1 ;

-700 ;

0 100 200 300 500 600 700 800 900 1000 1100 1200 1300

!J.G J GROSS MEGAWATTS