Preservice Insp Plan Associated W/Steam Generator Replacement for Surry Power Station Unit 1.
ML18139B556
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/07/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B554 List:
References
PROC-801007, NUDOCS 8110060245
Download: ML18139B556 (6)


Text

-..*::

PRESERVICE INSPECTION PLAN ASSOCIATED WITH STEAM GENERATOR REPLACF11ENT FOR SURRY POWER STATION UNIT NO. 1 Surry Power Station P. 0. Box 315 Surry, Virginia 23883 Virginia Electric and Power Company P. 0. Box 26666 Richmond, Virginia 23261 Inspection Plan Date: October 7, 1980 Commercial Service Date: December 22, 1972

  • ( 8110060245 811 OQ2\

, PDR ADOCK 05000280 G PDR

r I This document details the planned scope of preservice examinations associated with the Surry Unit 1 Steam Generator Replacement Project. These examinations I will be performed in accordance with the requirements of Section XI of the ASME Boiler and Pr...:ssure Vessel Code, 1974 Edition with Addenda thru the Summer 1975, to the extent practical with access provided and limitations of component geometry. The intent of these examinations is to pr:..ovide preservice baseline data for those new ASME Class 1 and 2 pressurp-retaining co~ponent (and their supports) welds associated with the steam ge~erator r~lacement. The NDT work that will be performed by construction personnel as:. required by the final design controlling procedures is not within the scope of this plan.

Qualification of NDT personnel, materials and equipment will be available prior to the start *of examinations. Examination procedures to be used wi_ll be those contained in the Vepco Nondestructive Test Manual and/or approved vendors' procedures to be determined prior to the actual testing.

The examinations outlined in the enclosed tabulations have been developed from the steam generator replacement design packages. Specific locations

  • on isometrics drawings of some of the welds cannot be determined from the information therein; and thus will be field located by the NDT personnel during performance of the examinations and indicated on the appropriate drawings.

With respect to ASME Class 2 components, the welds specified in the plan may be substituted by other welds as long as the requirement of IWC-2411 are complied with.

PREPARED BY: <<L ~ DATE /c)/s/f'tJ Til'LE: fta:1. .l=t?b

~ 91~~ s~. /

LEVEL III APPROVAL: ~~-~- DATE /tJ/2.2/frV TITLE: 11/421 ~;zrr*

STATION APPROVAL:

TITLE:

~PPROVED*~~~!!!!..:~.-!.!~~~~

CHAIRMAN- SUR NUCLEAR SAFETY COMMITTEE DA~ MAR 2 6 1981

r~

I, 'r:*,

SURRY UNIT 1 INSPECTION PLAN

... .- .... ,1.*** 1*-r-..

ASME CODE CLASS 1 COMPONENTS Plan Table IWB-2500 Reference Examination Item IWB-2600 Exam. Drawing Method No. Item No. Category No. DESCRIPTION OF EXAMINATION UT PT VT REMARKS 1 B 3.3 B-F West. R. C. Loop "A", Lines 29 "-RC-1 X X VPA-1-4100 and 31 "-RC-2. Examine 100% of 1980 welds 5 DM and 6 DM 2 B 3.3 B-F West. R.C. Loop "B", Lines 29"-RC-4 X X VPA-1-4200 and 31"-RC-5. Examine 100% of 1980 welds 5 DM and 6 *DM.

3 B 3.3 B-F West. R. C. Loop "C", Lines 29"-RC-7 X X VPA-1-4300 and 31 "-RC-8. Examine 100% of 1980 welds 5 DM and 6 DM.

4 B 4.5 B-J West. R.C. Loop "A" Lines 29"-RC-1 X X VPA-1-4100 and 31"-RC-2. Examine 100% of 1980 welds, 4 and 7.

5 B 4.5 B-J West. R. C. Loop "B", Lines 29"-RC-4 X X VPA-1-4200 and 31"-RC-5. Examine 100% of 1980 welds, 4 and 7.

6 B 4.5 B-J West. R. C. Loop "C", Lines 29"-RC-7 X X VPA-1-4300 and 31"-RC-8. Examine 100% of 1980 welds 4 and 7. ,L1', ,-, ~1 I 7 B 4.8 B-J West. R. c. Loop "A" RTD line 2"-RC-139 X VPA-1-4108 Examine 100% of 8 welds at socket 1980 weld coupling.

8 B 4.8 B-J West. R. C. Loop "B" RTD line 2"-RC-121 X VPA-1-4208 Examine 100% of 11 welds at socket 1980 weld coupling.

.... :*I *F** SURRY UNIT 1 INSPECTION PLAN ASME CODE CLASS 1 COMPONENTS Plan Table IWB-2500 Reference Examination Item IWB-2600 Exam. Drawing Method No. Item No. Category No. DESCRIPTION OF EXAMINATION UT PT VT REMARKS 9 B 4.8 B-J West. R. C. Loop "C", Lines 2"-RC-153 X VPA-1-4307 Examine 100% of 11 welds at 1980 socket weld coupling.

10 B 4.8 B-J West. R.C. Loop "A", Lines 2"-RC-53. X VPA-1-4110 Examine 100% of welds; 5 socket 1980 weld couplings No. 2,50,51,52,53.

11 B 4.5 B-J West. R.C. Loop "B", Drain Lines X VPA-1-4210 2"-RC-57. Examine 100% of 1980 welds; 7 socket weld couplings No. 2,9,40,42,43,44,45.

12 B 4.5 B-J West. R. C. Loop "C" Drain Lines 2"-RC-58. X VPA-1-4309 Examine 100% of welds; 5 socket weld 1980 couplings no. 2,37,38,39,40.

socket weld couplings **

13 B 3.1 B-B West. Steam Generators A, Band C Channel X VPA-1-3100 Head to Tube Sheet Welds. Examine

. 1980 100% of welds 1-1, 2-1 and 3-1

  • 14 B 3.8 B-I-2 West. Steam Generators A, Band C Vessel X VPA-1-3100 Cladding Patches. Examine one patch 1980 (36 sq. in.) near each primary side manway of each steam generator (6 patches total).

15 B 3.10 B-G-2 West. Steam Generators A, Band C Hotside X VPA-1-3100 and Coldside Manway Bolting. Examine 1980 100% of bolts on each manway of each steam generator.

SURRY UNIT 1

}*' ,'°**l,*'..1*,~
,.

INSPECTION PLAN I ASME CODE CLASS 2 COMPONENTS Plan Table IWB-2520 Reference Examination Item IWB-2600 Exam. Drawing Method No. Item No. Category No. DESCRIPTION OF EXAMINATION UT PT VT REMARKS 16 Cl. l C-A West. Steam Generator "A" Transition Cone X VPA-2-1100 Weld #11. Examine 20% of weld divided into three segments equally spaced around circumference.

17 Cl.1 C-A West. Steam Generator "C" Transition Cone X VPA-2-1100 to Lower Shell Weld #5. Examine 20%

of weld divided into three segments equally spaced around circumference.

18 Cl. l C-A West. Steam Generator "B" Lower Shell to Stub X VPA-2-1100 Barrel Weld lt3. Examine 20% of weld divided into three segments equally spaced around circumference.

19 Cl. l C-A West. Steam Generator "A" Stub Barrel to X VPA-2-1100 Upper Tubesheet Weld #2. Examine 20%

of weld divided into three segments equally spaced around circumference.

20 c2.1 C-G West. Steam Generator "A" Main Steam Line X VPA-2-2100 30"-SHP-l, nozzle to elbow weld.

1980 Examine 100% of weld.

21 C2.1 C-G West. Steam Generator "C" Main Steam Line X VPA-2-2300 30"-SHP-3, elbow to pipe weld.

1980 Examine 100% of weld.

22 C2.1 C-G West. Steam Generator "A" Feedwater Line X VPA-2-2101 14"-WFPD-17, nozzle to reducer 1980 weld. Examine 100% of weld.

SURRY UNIT 1

,I',*,

INSPECTION PLAN  : ..*.*;--.*,1.** . 1**r-..

tit ..

ASME CODE CLASS 2 COMPONENTS Plan Table IWB-2520 Reference Examination Item IWB-2600 Exam. Drawing Method No. Item No. Category No. DESCRIPTION OF EXAMINATION UT PT VT REMARKS 23 C2.l C-G West. Steam Generator "B" Feedwater Line X VPA-2-2201 14 "-WFPD-13, reducer to pipe weld.

1980 Examine 100% of weld.

24 c2.1 C-G West. Steam Generator "B" Feedwater Line X VPA-2-2201 14-WFPD-13, elbow to pipe weld.

1980 Examine 100% of weld.

25 C2.1 C-G West. Steam Generator "C" Feedwater Line X VPA-2-2301 14"-WFPD-9, elbow to elbow weld.

1980 Examine 100% of weld,