ML18139B922
From kanterella
Jump to navigation
Jump to search
ML18139B922 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 05/26/1982 |
From: | Virginia Power (Virginia Electric & Power Co) |
To: | |
Shared Package | |
ML18139B921 | List: |
References | |
1-OP-26.5, NUDOCS 8207080217 | |
Download: ML18139B922 (1) | |
Similar Documents at Surry | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18152B3591999-08-23023 August 1999
[Table view]Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML18151A1931998-05-0404 May 1998
[Table view]Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML20076F8341994-08-0404 August 1994 Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program ML18151A2451994-07-31031 July 1994 ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 ML18151A2101994-07-31031 July 1994 ISI Program,Interval 3,931014-031013, Rev 1 ML18151A9011994-03-0303 March 1994 ISI Program Interval 3,940510- 040509, Rev 0 ML18151A1651993-04-30030 April 1993 Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. ML18151A3711992-03-19019 March 1992 Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML18151A6411992-03-19019 March 1992 Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML20079L2091991-09-22022 September 1991 Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format ML18151A4121991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm. ML20092M9061991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm ML18151A6551990-11-14014 November 1990 Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 ML18152A5231989-04-19019 April 1989 Rev 0 to Motor-Operated Valve Action Plan. ML18152A2911988-10-19019 October 1988 Major Milestones Description of Issue Approach to Resolution. ML18150A0971987-05-21021 May 1987 Revised Emergency Plan Implementing Procedures,Including Rev 17 to EPIP-1.01, Emergency Manager Controlling Procedure & Rev 5 to EPIP-1.02, Response to Notification of Unusual Event. ML20207J1411986-12-23023 December 1986 Amend to Emergency Plan Implementing Procedures Deleting Procedure EPIP-2.05, Transmittal of Core Damage Data. Revised Index Included ML20215B1791986-12-12012 December 1986 Special Test Procedure 2-ST-191, Special Test to Inspect Operation of Mainsteam Trip Valve TV-MS-201C ML20215B1351986-10-28028 October 1986 Administrative Procedure ADM-89.13, Secondary Piping Insps ML20215H3081986-09-29029 September 1986 Rev 16 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure ML20215H3191986-09-29029 September 1986 Rev 0 to Emergency Plan Implementing Procedure EPIP-4.29, Technical Support Ctr/Leof Radiation Monitoring Sys ML20215F6701986-09-25025 September 1986 Revised Emergency Plan Implementing Procedures,Including Rev 17 to EPIP-3.01, Callout of Emergency Response Personnel & Rev 3 to EPIP-4.16, Offsite Monitoring ML20215H3221986-09-19019 September 1986 Rev 10 to Emergency Plan Implementing Procedure EPIP-5.03, Personnel Accountability ML20204F3371986-07-24024 July 1986 Rev 15 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. W/Procedure Index ML18130A4181986-04-0303 April 1986 Revised Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel, Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr & Rev 2 to EPIP-4.03 Re Dose Assessment ML20137J3921986-01-0202 January 1986 Revised Emergency Plan Implementing Procedures,Including Rev 5 to EPIP-1.05, Response to General Emergency, Rev 0 to EPIP-2.04, Transmittal of Plant Status & Core Assessment Data & Rev 0 to EPIP-2.05, Transmittal Core Damage Data ML18142A1971985-03-0505 March 1985 Revised Emergency Plan Implementing Procedures,Including Rev 3 to EPIP-1.02, Response to Notification of Unusual Event & Rev 9 to EPIP-2.01, Notification of State & Local Govts. ML18149A1781985-01-15015 January 1985 Revised Emergency Plan Implementing Procedures,Consisting of Rev 3 to EPIP-2.02, Notification of NRC & Rev 0 to EPIP-4.27, Dose Control Emergency Response. ML18142A0961984-11-0505 November 1984 Procedure 466, Remote Multiplexer Integrated Functional Test Procedure. ML18142A1191984-10-23023 October 1984 Rev 4 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure. ML18142A0751984-09-11011 September 1984 Revised Emergency Plan Implementing Procedures,Including EPIP-2.01 Re Notification of State & Local govts,EPIP-3.02 Re Activation of Technical Support Ctr & EPIP-3.03 Re Activation of Operational Support Ctr ML18141A7211984-06-20020 June 1984 Rev 1 to Emergency Plan Implementing Procedure EPIP-4.24, Gaseous Effluent Sampling During Emergency. W/840620 Ltr ML18142A0111984-06-0707 June 1984 Rev 9 to Emergency Plan Implementing Procedure EPIP-3.01, Callout of Emergency Response Personnel. ML18141A6211984-05-18018 May 1984 Rev 3 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure. W/840518 Ltr ML18141A5301984-03-0101 March 1984 Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 ML18141A5051984-02-0202 February 1984 Rev 10 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. W/840217 Ltr ML20093C5211984-01-13013 January 1984 Public Version of Rev 9 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure & Jm Felton 840322 Release Memo ML20083H7701983-12-0808 December 1983 Public Version of Rev 3 to Emergency Plan Implementing Procedure EPIP-4.23, Post-Accident Sampling of Reactor Coolant ML20083J7621983-11-10010 November 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-1.01 Re Emergency Manager Controlling Procedure & EPIP-1.02 Re Response to Notification of Unusual Event ML18142A1361983-11-0404 November 1983 Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask,Loading & Handling Procedures. ML20081A8101983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-4.01 Re Radiological Assessment Director & EPIP-4.09 Re Source Term Assessment ML20078F9301983-09-23023 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-4.22 Re post-accident Sampling of Containment Air & EPIP-4.01 Re Radiological Assessment Director ML18142A1371983-09-15015 September 1983 Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. ML20080P4501983-09-12012 September 1983 Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP-4.20, Health Physics Actions for Transport of Contaminated Injured Personnel & Rev 2 to Procedure EPIP-5.01, Transport of Contaminated Injured Personnel 1998-05-04 |