Issue date | Title | Topic | |
---|---|---|---|
IR 05000269/2004013 | 24 September 2004 | EA-04-115 - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000269, 270, 287/2004013, Oconee Nuclear Station | |
IR 05000270/2000287 | 28 November 2011 | 11/16/2011- Summary of Meeting to Discuss the Safety Significance of Two Preliminary Greater Than Green Findings with Two Associated Apparent Violations Documented in Inspection Reports 05000269,05000270, 05000287/2011018 | Mission time Operability Determination |
IR 05000336/2011010 | 8 August 2011 | EA-11-047, Millstone - Final Significance Determination for White Finding, W/Assessment Follow-up;Notice of Violation and Results of Regulatory Conference (NRC Special Inspection Report No. 05000336/2011010) | Significance Determination Process Preliminary White Finding |
M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection | 17 July 2008 | M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection | Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Multiple Spurious Operation Fire Protection Program |
ML020810317 | 12 March 2002 | Meeting Agenda, to Discuss the Licensee'S Reactor Pressure Vessel Head Penetration Nozzle Inspection Plans | |
ML021080205 | 6 March 2002 | March 6, 2002 - RIC 2002 Presentation - W1 David A. Christian - Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | Boric Acid Liquid penetrant |
ML021080211 | 6 March 2002 | March 6, 2002 - RIC 2002 Presentation - W1 William R. Mccollum - Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | Boric Acid |
ML021090633 | 19 April 2002 | 4/10/2002 Columbia Generating Station End-of-Cycle Meeting Summary | |
ML021540118 | 24 May 2002 | Meeting with Columbia Generating Station Re Plant Fuel Corrosion Issues & Engineering Initiatives | Safe Shutdown |
ML022140237 | 8 August 2002 | Summary of July 16-18, 2002, Public Meeting with NMC Staff Regarding Inputs for Use in the Pressurized Thermal Shock (PTS) Risk Analysis of Pnp | |
ML023290184 | 20 November 2002 | Slides for 11/4/2002 Lrsc Meeting | Aging Management |
ML023580362 | 12 December 2002 | (Mps), Independent Spent Fuel Storage Installation (ISFSI) Handout Dtd December 12, 2002 | |
ML030310179 | 28 January 2003 | NRC Management Update Jan. 28, 2003 | |
ML030780346 | 17 March 2003 | Seabrook Meeting Notice Slides for Annual Assessment Meeting | Power change |
ML030900322 | 20 March 2003 | Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 | |
ML030900354 | 20 March 2003 | Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 | |
ML030980597 | 3 April 2003 | Annual Assessment Meeting for Surry Power Station. NRC Presentation Slides | |
ML031400314 | 18 April 2003 | Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station | |
ML031740421 | 12 June 2003 | Presentation Slides to Supplemental Emergency Power System (Seps) Project | Safe Shutdown |
ML040140447 | 13 January 2004 | Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003 | Reactor Vessel Water Level |
ML040150581 | 14 January 2004 | Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment | |
ML040230703 | 14 January 2004 | Summary of Meeting to Discuss Surry Power Station Performance Improvements (Slides) | High winds |
ML040350212 | 13 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040350687 | 5 August 2003 | DRS Open Item Status | Safe Shutdown Boric Acid Fire Barrier Hemyc |
ML040350691 | 27 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040630431 | 3 March 2004 | Powerpoint Presentation Slides for Meeting with Florida Power & Light Company Regarding Planned Power Uprate Request for Seabrook Station, Unit No. 1 | Scaffolding |
ML040750184 | 8 March 2004 | Slide Presentation by Duke Energy Corp. Regarding Reactor Trip Breaker Replacement | |
ML040770381 | 16 March 2004 | Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time Extension | Mission time |
ML041040112 | 8 April 2004 | Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2004 | Preliminary White Finding |
ML041040134 | 1 April 2004 | Regulatory Conference NRC Triennial Fire Protection Inspection Findings, Surry Power Station, Units 1 and 2 | |
ML041120482 | 13 April 2004 | NRC CY2003 Annual Assessment Meeting Oconee Nuclear Station | |
ML041400360 | 19 May 2004 | SB ROP-4 Annual Assessment Meeting NRC Slide Presentation | |
ML041400371 | 19 May 2004 | ROP-4 Annual Assessment Meeting NRC Slides | |
ML041940419 | 29 June 2004 | High Energy Line Break (HELB) Outside Containment Project Update | |
ML042180089 | 4 August 2004 | VIPRE-D Topical Report DOM-NAF-2 Meeting with NRC | |
ML042260276 | 12 August 2004 | Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback | Job Performance Measure |
ML042930203 | 25 October 2004 | Meeting Handouts, Summary of Meeting with Duke Energy Corporation Potential Flooding in the Auxiliary Building | Safe Shutdown Safe Shutdown Earthquake |
ML042940123 | 4 October 2004 | Regulatory Performance Mtg Presentation | |
ML043100148 | 4 November 2004 | Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station | |
ML043210527 | 9 November 2004 | 11/09-10/2004 Meeting Slides for Meeting Between the NRC Staff and the B&Wog Regarding BAW-2374 Rev 2 - Steam Generator Tube Failure Coincident with LBLOCA - Preliminary | |
ML043230504 | 23 September 2004 | Licensee Slides for the Pre-decisional Enforcement Conference (Seabrook Station) 09/23/2004 | Enforcement Discretion |
ML043450171 | 6 December 2004 | Attachment 2, to 11/16/2004 Meeting Summary Regarding Tornado Mitigation Strategy | Boric Acid Tornado Generated Missile TORMIS |
ML050250157 | 6 December 2004 | Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Probabilistic Risk Assessment |
ML050730206 | 14 March 2005 | NRC Slides for Public Meeting of Seabrook Station Annual Assessment | |
ML050730393 | 14 March 2005 | NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance | |
ML050760140 | 17 March 2005 | NRC Slides for Neac Public Meeting Re Millstone Station Annual Assessment Performance | |
ML050970463 | 30 March 2005 | Presentation Slides for Surry 03/30/2005 NRC Cy 2004 Regulatory Performance Meeting | Safe Shutdown |
ML051030212 | 30 March 2005 | NRC Cy 2004 Annual Assessment Meeting, Surry Plant, 03/30/2005 | Safe Shutdown |
ML051040083 | 13 April 2004 | Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station | |
ML051090141 | 17 March 2005 | Attachment 2 - Presentation Slides for Oconee Meeting to Discuss Tornado Mitigation Strategy | Safe Shutdown Operability Determination TORMIS Backfit |