Millstone Power Station (MPS)
Independent Spent Fuel Storage Installation NRC Office R December 12t
[SFSI)
)n I
MPS ISFSI
Background
"* Dominion Nuclear Connecticut (DNC) has initiated the Independent Spent Fuel Storage Installation (ISFSI) Project for Millstone Power Station (MPS) site.
"* A Site Selection Study has been completed.
"* MPS will use the Transnuclear, Inc. (TN)
NUHOMS Dry Cask Storage System using the 10CFR72 General License process.
12/12/02 2
MPS ISFSI Background (contd.)
"* The current plant Protected Area (PA) fence will be expanded to include the ISFS[ Site.
"* The ISFSI Site will have a footprint to accommodate MPS spent fuel through License Renewal.
"* The initial storage pad will be for 20 NUHOMS Horizontal Storage Modules (HSMs).
12/12/02
MPS ISFSI Current Status and Schedule
"* MPS has initiated the design & engineering of the NUHOMS ISFSI facility with TN.
"* Initial campaign is to load MPS Unit 2 spent fuel into 9 Dry Shielded Canisters (DSCs).
"* MPS Units 1 and 3 spent fuel is not part of the initial 9 DSCs.
12/12/02 4
MPS ISFSI Current Status and Schedule (contd.)
- Target Dates for Major Milestones (subject to state and local reviews)
- Complete ISFSI Site Construction, receive HSMs and DSCs in first half of 2004.
- Finish MPS and NRC dry runs and readiness reviews by the end of 3rd qtr. of 2004.
- Start loading 4 DSCs into the HSMs in 4th qtr.
of 2004 and 5 more DSCs by mid-2005.
12/12/02 5
MPS ISFSI External Stakeholders Meetings
"* Joint discussion with host and border communities early Summer '02 to discuss spent fuel storage options.
" Periodic updates during independent studies.
"* Informational site visits.
12/12/02 6
MPS ISFSI Future Community Outreach Initiatives
"* Ongoing meetings with affected towns.
" Process provides opportunity for public comment.
"* Ongoing stakeholder informational meetings throughout '03.
"* Public outreach '03.