Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 200318 August 2003Fitness-for-Duty Program Performance Report for Period January - June 2003Fitness for Duty
Stolen
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 200430 August 2004Fitness-for-Duty Program Performance Report for the Period January - June 2004Fitness for Duty
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 200428 February 2005Fitness-for-Duty Program Performance Report for the Period July - December 2004Fitness for Duty
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 200529 August 2005Fitness-for-Duty Program Performance Report for the Period January - June 2005Fitness for Duty
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection28 September 2005Entergy Nuclear Northeast - Proof of Financial Protection
BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 200527 February 2006Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005Fitness for Duty
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee13 July 2006Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont YankeeMururoa
ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 200629 August 2006Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006Fitness for Duty
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 200628 February 2007Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006Fitness for Duty
JPN-02-002, Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 200125 February 2002Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 2001Fitness for Duty
JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 200215 August 2002Fitness-for-Duty Program Performance Report for the Period January - June 2002Fitness for Duty
Accidental discharge
Inattentive
JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 200226 February 2003Fitness-for-Duty Program Performance Report for the Period July - December 2002Fitness for Duty
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G6 July 2021Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML02123029925 March 2002Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power StationReactor Vessel Water Level
ML03052026915 February 2003Follow-up Report, Reference Event #39516
ML03084038217 March 2003Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate RequestPower change
ML0411704729 March 2004Engineering Report No. PNPS-RPT-04-00001, Rev. 0, Risk Impact Assessment of Extending Containment Type a Test Interval.Safe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
VT-2
Large early release frequency
Moisture barrier
Earthquake
Dissimilar Metal Weld
ML06030002825 January 20062006/01/25-Pilgrim Nuclear Power Station License Renewal Application
ML06122063026 April 2006License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293Incorporated by reference
Aging Management
Fire Protection Program
Backfit
ML06228060231 July 2006Groundwater Protection - Data Collection Questionnaire
ML06291043217 November 2006Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station
ML06306030211 July 2006Email: (PA-LR) FW: Pilgrim Document 83Zebra Mussel
Aging Management
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Power Uprate
ML06311010823 October 1992(PA-LR) Ltr to D. Mulligan Report of the Review Committee for the Southeastern Massachusetts Heath Study of Leukemia Around the Pilgrim Power Plant
ML06347017629 March 2006Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental)
ML0634701803 April 2006Pilgrim: NRC Contact Report - Arrange Meeting with Town Personnel During May Site Audit (Intergovernmental)
ML0634804026 November 2006E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan
ML07044047918 May 2006CR-PNP-2006-01914 - Pilgrim
ML07078018826 March 1999Condition Report CR-PNP-1999-09102, Loose Anchor Bolt Extensions
ML07078036724 September 1996CR-PNP-1996-00396, High Mitrate Levels Exists in the Tbccw System
ML07078037227 November 1996CR-PNP-1996-09593, Crack in Housing for MO-1001-34A
ML07078038030 April 1997Condition Report CR-PNP-1997-01787, RFO-11 Erosion-Corrosion Data Review of Inspection Point #15 Found Instances of Wall Thickness Increases of Up to 0.227 When Comparing Previous Outage Results
ML07078041123 February 1997Condition Report CR-PNP-1997-09135, Two Cracks Found in Core Spray Weld SW8BN
ML0707804121 June 1999CR-PNP-1990-01467, During Inspection of 2nd Pass FW-8 MT of Weld Revealed Indication 4 Long Crack- Like Linear
ML07078041622 May 1999CR-PNP-1990-09249, Torus Containment Shell One Area of Pitting Exceeding Acceptance Criteria of .066 Inches Base Depth
ML07078041812 June 2000CR-PNP-2000-09228, P-161C Suction Piping 98 Deg. Elbow for C Continuous SSW Hypo Pump Cracked and Leaking Into Burm Area
ML0707804313 May 2001CR-PNP-2001-02275, a SSW Discharge Piping 20 Foot Section of Rubber Lining Peeled Off of Piping Exposing Bare Metal
ML07078043910 September 2001CR-PNP-2001-04048, Received SBO DG Fuel Tank Leakage Alarm Alert Wet Probes
ML07078045320 September 2001CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm
ML07078049127 September 2001CR-PNP-2001-04238, HCU 50-31 Leak
ML0707805088 November 2001CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak
ML07078052921 April 2001CR-PNP-2001-09403, Fire System Has Broken Pipe Between 12-D-8, 12D-9 in Aog Building
ML07078054527 February 2002CR-PNP-2002-09283, Unable to Reassemble E-122B, B Tbccw Heat Exchanger Head
ML07078056419 June 2002CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4) Several Times During Shift on 06/19/2005
ML07078060313 December 2002CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had PittingCoatings
ML07078061517 April 2003CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted
ML07078062419 April 2003CR-PNP-2003-01413, Secondary Containment Leakrate Testing Was Aborted
ML07078063219 April 2003CR-PNP-2002-01414, the Concrete Shield Block for the Drywell Equipment Hatch Was Removed Prior to the Reactor Being Less than 212F
ML07078065322 April 2003CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased But Acceptable Local Leak Rate Test Results
ML0707901154 October 2006CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and StrengthenedAging Management
ML0707901206 October 2006CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping