Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000440/200930112 March 2009Er 05000440-09-301(DRS); 1/12/2009 - 1/21/2009; First Energy Corp., Perry Station Initial License Examination ReportJob Performance Measure
IR 05000440/201330124 April 2013Er 05000440-13-301; 02/25/2013 - 03/14/2013; Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant, Initial License Examination ReportJob Performance Measure
IR 05000440/201730113 April 2017NRC Initial License Examination Report 05000440/2017301Job Performance Measure
IR 05000440/20173029 August 2017NRC Initial License Reexamination Report 05000440/2017302
IR 05000440/201930124 April 2019NRC Initial License Examination Report 05000440/2019301 (Jxd)Job Performance Measure
IR 05000440/201930227 September 2019NRC Initial License Reexamination Report 05000440/2019302 (Rdb)
IR 05000440/20213018 April 2021NRC Initial License Examination Report 05000440/2021301Job Performance Measure
IR 05000440/202230124 January 202305000440/2022301Job Performance Measure
L-08-027, 2009 Perry Nuclear Power Plant Initial Examination Outline Submittal8 September 20082009 Perry Nuclear Power Plant Initial Examination Outline Submittal
L-08-330, 2009 Perry Nuclear Power Plant Initial Examination Proposed Exam Files14 November 20082009 Perry Nuclear Power Plant Initial Examination Proposed Exam Files
L-09-034, Exam 2009, Memo to Withhold Spare Ssenario from Public Viewing16 February 2009Exam 2009, Memo to Withhold Spare Ssenario from Public Viewing
L-12-446, 2013 Perry Nuclear Power Plant Initial License Examination Proposed Exam Files25 February 20132013 Perry Nuclear Power Plant Initial License Examination Proposed Exam FilesJob Performance Measure
L-14-396, 2015 Perry Nuclear Station, Initial License Exam, Letter from Licensee Submitting Proposed Exam8 December 20142015 Perry Nuclear Station, Initial License Exam, Letter from Licensee Submitting Proposed ExamJob Performance Measure
Fire Watch
L-17-067, 2017 Perry Nuclear Power Plant Initial Licensed Operator Examination ES-403-122 February 20172017 Perry Nuclear Power Plant Initial Licensed Operator Examination ES-403-1
L-18-141, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations7 May 2018Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
L-18-265, Proposed Examination Submittal Letter14 November 2018Proposed Examination Submittal Letter
L-20-292, 75-Day Exam Submittal Cover Letter4 November 202075-Day Exam Submittal Cover LetterJob Performance Measure
L-21-087, 2021 Perry Ile Post-Exam Submittal Letter2 March 20212021 Perry Ile Post-Exam Submittal Letter
L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations23 March 2022Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations
L-22-184, Proposed Exam Cover Letter 2022 Signed14 September 2022Proposed Exam Cover Letter 2022 SignedJob Performance Measure
L-22-282, NRC 2022 Post Exam Submittal Cover Letter4 January 2023NRC 2022 Post Exam Submittal Cover Letter
L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations23 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
ML02078063019 March 2002GFE Registration Letter - June 2002 ExaminationGeneric Fundamentals Examination
ML02093079131 March 2002March 2002, Perry Initial Operator Licensing Examination Reactor Operator Written Examination
ML02093080731 March 2002March 2002, Perry Initial Operator Licensing Examination; Senior Reactor Operator Written ExaminationSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Half scram
Squib
Fast acting solenoid valve
Continuous fire watch
Fire Watch
Power change
ML0211600995 March 2002Miscellaneous Correspondence for the Perry Inital Examination - March 2002
ML0211601455 March 2002Various Checklist for the Perry Initial Examination - March 2002Job Performance Measure
ML0211601635 March 2002Initial License Exam March 5 Thru 13, 2002. Form ES-201-3, Examination Security Agreements.
ML0211602125 March 2002Initial License Exam March 5 Thru 13, 2002. Form ES-401-9, Written Examination Review Worksheet.
ML0211602695 March 2002Initial License Exam March 5 Thru 13, 2002. Form ES-401-10, Record of Rejected K/As.
ML0211606015 March 2002Final As-Administered Administrative Jpms for the Perry Initial Examination - March 2002Fitness for Duty
Loop seal
Packing leak
Job Performance Measure
Power change
ML0211902075 March 2002Final As-Administered Walkthrough Jpms for the Perry Initial Examination - March 2002Loop seal
High Radiation Area
Job Performance Measure
ML0211902925 March 2002Final As-Administered Scenarios for the Perry Initial Examination - March 2002Safe Shutdown
Reactor Vessel Water Level
Half scram
Squib
Scram Discharge Volume
Overtravel
Earthquake
Power change
ML0211904385 March 2002Initial Submittal of the Outline and NRC Comments for the Perry Initial Examination - March 2002
ML0211904905 March 2002Initial Submittal of the Administrative Jpms for the Perry Initial Examination - March 2002Loop seal
Packing leak
High Radiation Area
Job Performance Measure
Power change
ML0211906365 March 2002Initial Submittal of the Walkthrough Jpms for the Perry Initial Examination - March 2002Loop seal
High Radiation Area
Job Performance Measure
ML0211906815 March 2002Initial Submittal of the Scenarios for the Perry Initial Examinaton - March 2002
ML0211907485 March 2002Initial License Exam March 5 Thru 13, 2002. NRC Review Comments to Facility-Developed Written Exam & Operating Test
ML0212303245 March 2002Initial Submittal of Written Examination for the Perry Initial Examination - March 2002Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Grab sample
Time to boil
Post Accident Monitoring
Squib
Emergency Lighting
Locked High Radiation Area
Abnormal operational transient
Minimum Critical Power Ratio
Scram Discharge Volume
Fast acting solenoid valve
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Continuous fire watch
Fire Watch
Power change
ML02212028823 July 2002GFE Registration Letter for October 9, 2002 ExaminationGeneric Fundamentals Examination
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
ML0305805317 February 2002Initial Ro/Sro Examination 02/2003Unanalyzed Condition
High Radiation Area
Half scram
Stroke time
Squib
Earthquake
ML03071022727 January 2003Final As-Administered Walkthrough Jpms for the Perry Initial Examination - Jan/Feb 2003Boric Acid
Stroke time
Job Performance Measure
ML03071023427 January 2003Final As-Administered Scenarios for the Perry Initial Examination - Jan/Feb 2003Safe Shutdown
Loop seal
Squib
Overtravel
Earthquake
Power change
ML03071029927 January 2003SRO and RO Reference List for the Perry Initial Examination - Jan/Feb 2003
ML03078002827 January 2003Miscellaneous Correspondence for the Perry Examination - Jan/Feb 2003
ML03078005627 January 2003Various Checklists for the Perry Examination - Jan/Feb 2003Job Performance Measure
ML03078009727 January 2003Outline Submittal with NRC Comments for the Perry Examination - Jan/Feb 2003Shutdown Margin
Squib
ML03078012827 January 2003NRC Comments No the Operating Test and the Written Examination - ES-401-9 for the Perry Examination - Jan/Feb 2003
ML03078014327 January 2003Initial Submittal of the Administrative Jpms for the Examination - Jan/Feb 2003Unanalyzed Condition
Time of Discovery
Fitness for Duty
High Radiation Area
Stroke time
Locked High Radiation Area
Job Performance Measure
Fire Protection Program
Fatality