ML023090558

From kanterella
Jump to navigation Jump to search
Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002
ML023090558
Person / Time
Site: Dresden, Davis Besse, Palisades, Perry, Kewaunee, Point Beach, Braidwood, Duane Arnold, Cook, Quad Cities, LaSalle  Constellation icon.png
Issue date: 11/01/2002
From: Lanksbury R
Division of Reactor Safety III
To: Armitage R, Bogue E, Burns-Muntz J, Collings R, Dean Curtland, Davidson K, Clint Jones, Marler M, Myers D, Sanders L, Symonds C
Consumers Energy, Detroit Edison, Exelon Generation Co, FirstEnergy Nuclear Operating Co, Indiana Michigan Power Co, Nuclear Management Co
References
Download: ML023090558 (12)


Text

November 1, 2002 Mr. Darin J. Myers Training Department Braidwood Station Exelon Generation Company, LLC 35100 South Route 53, Suite 84 Braceville, IL 60407-9617

Dear Mr. Myers:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-456 Docket No.: 50-457

November 1, 2002 Ms. Caroline C. Jones Training Department Donald C. Cook Nuclear Power Plant American Electric Power Company One Cook Place Bridgman, MI 49106

Dear Ms. Jones:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-315 Docket No.: 50-316

November 1, 2002 Mr. Michael L. Marler Training Department Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449

Dear Mr. Marler:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-346

November 1, 2002 Mr. Chris G. Symonds Training Department Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765

Dear Mr. Symonds:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-237 Docket No.: 50-249

November 1, 2002 Mr. Dean A. Curtland Training Department Duane Arnold Energy Center Nuclear Management Company, LLC 3363 DAEC Road Palo, IA 52324

Dear Mr. Curtland:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 0154-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-331

November 1, 2002 Mr. Larry D. Sanders Training Department Fermi Power Plant Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

Dear Mr. Sanders:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-341

November 1, 2002 Mr. Kevin Davison Training Manager Kewaunee and Point Beach Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

Dear Mr. Davison:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-305 Docket No.: 50-266 Docket No.: 50-301

November 1, 2002 Ms. JoEllen Burns-Muntz Training Department LaSalle County Station Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341

Dear Ms. Burns-Muntz:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-373 Docket No.: 50-374

November 1, 2002 Ms. Elizabeth A. Bogue Training Department Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043

Dear Ms. Bogue:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-255

November 1, 2002 Mr. R. G. Collings Training Department Perry Nuclear Power Plant FirstEnergy Nuclear Operating Company Post Office Box 97 Perry, OH 44081

Dear Mr. Collings:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-440

November 1, 2002 Mr. Roger O. Armitage Training Department Quad Cities Nuclear Power Station Exelon Generation Company, LLC 22601 206th Avenue North Cordova, IL 61242-9740

Dear Mr. Armitage:

On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Docket No.: 50-254 Docket No.: 50-265

Multiple Addressees - Letter Dated: November 1, 2002 Region III Facility Training Managers as Listed Below Identical letters sent to:

D. J. Myers, Braidwood, Docket Nos. 50-456; 50-457 C. C. Jones, Donald C. Cook, Docket Nos. 50-315; 50-316 M. L. Marler, Davis-Besse, Docket No. 50-346 C. G. Symonds, Dresden, Docket Nos. 50-237; 50-249 D. A. Curtland, Duane Arnold, Docket No. 50-331 L. D. Sanders, Fermi, Docket No. 50-341 K. Davison, Kewaunee, Docket No. 50-305, and Point Beach, Docket Nos. 50-266; 50-301 J. Burns-Muntz, LaSalle, Docket Nos. 50-373; 50-374 E. A. Bogue, Palisades, Docket No. 50-255 R. G. Collings, Perry, Docket No. 50-440 R. O. Armitage, Quad Cities, Docket Nos. 50-254; 50-265 On October 9, 2002, the U. S. Nuclear Regulatory Commission administered a Generic Fundamentals Examination (GFE) section of the written operator licensing examination.

Your facility did not participate in this examination. However, a copy of the BWR and PWR GFEs and their answer keys will be available for your review on the NRCs web site (URL:

http://www.nrc.gov/reactors/operator-licensing.html) approximately 60 days following the examination administration date.

If you have any questions concerning this master examination copy, please contact Dr. George Usova at (301) 415-1064.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Distribution:

G. Usova, NRR:DIPM:IOHS DOCUMENT NAME: P:\GFES-NO_OCT02.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N NAME MABies:mab RDLanksbury DATE 10/30/2002 11/01/2002 OFFICIAL RECORD COPY