INITIAL SUBMITTAL OF THE WALKTHROUGH JPMS FOR THE PERRY INITIAL EXAMINATION - MARCH 2002

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:

Task

Title:

K/A

Reference:

Perry Shift Recirculation Pump B from Slow Speed to Fast Speed and Raise Reactor Power using Recirculation Flow (Alt. Path).

202001 A1.07, A1.08, A4.01 202002 A1.07, A1.08, A4.08 Task No:

JPM No:

202-547-01-01 202-511-01-01 2002 NRC SI NRC Examiner:

Method of testing Simulated Performance Actual Performance Classroom Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Examinee:

Facility Evaluator:

N/A Date:

In simulator

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

A plant startup is in progress. Recirc Pump A has just been transferred from slow to fast speed in accordance with SOI-B33, Reactor Recirculation System, Section 5.1, Steps 1 through 7.

Recirculation Flow Control Valve A is responding following failure to open from minimum position or HPU A is shutdown.

SOI-B33, Rev. 6, PIC 15 SOI-B33, Rev. 6, PIC 15 The Unit Supervisor, with concurrence from Reactor Engineering, directs you, as the Reactor Operator, to transfer Recirc Pump B from slow to fast speed and raise core flow to 55x 106 LBM/HR in accordance with SOI-B33.

Raise Recirculation flow by simultaneously operating the Recirc Loop A and B Flow Control slide switches using 2 second bumps.

NO 30 minutes

Appendix C Page 3 of 12 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk *)

Cue: If requested, inform candidate you will provide SRO oversight for the reactivity manipulation.

Cue: If a reactivity brief is requested, restate the initiating cue, inform candidate you will provide SRO oversight for the reactivity manipulation, and direct the candidate to discuss possible problems and contingencies.

Performance Step:

5.1.8 Standard

Transfer RCIRC PUMP B, 1B33-COO1B, from slow to fast speed by reperforming Steps 2 through 7 for Rcirc Pump B.

Returns to Step 5.1.2 for Recirc Pump B.

Comment:

Performance Step:

5.1.2 Standard

Verify CBs 3B and 4B are closed.

Confirms CBs 3B and 4B are closed.

Comment:

Performance Step:

5.1.3 Standard

Comment:

Take the CAVITATION/FCV LIMIT RCIRC RESET switch, 1B33-S I 11, to A then to B.

Take the CAVITATION/FCV LIMIT RCIRC RESET switch, 1B33-S 111, to A then to B.

Verifies white lights are out and alarms are clear.

Candidate should read the note and check the lights. This step is not critical because it was previously performed prior to shifting Recirc Pump A to fast speed.

Appendix C Page 4 of 12 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

If the following conditions are met:

5.1.4

"* ICS Computer point N27ME008, Total Rx Feedwater Flow (suct-recirc), indicates > 3.43 Mlbm/hr, and

"* ICS Computer point C34EA013, Total Rx Steam flow, indicates

> 3.1 Mlbm/hr, and

"* The CAVITATION/FCV LIMIT RCIRC RESET lights are not reset, and

"* Reactor Engineer recommends no further increase in reactor power prior to transferring to fast speed, and

"* Reactor Engineer recommends bypassing the power interlock.

Then place the following switches in BYPASS on Auxiliary Relay Panel, 1B33-POO1A and B:

a. POWER INTERLOCK, 1B33-S126A and B.

Note:

If the lights did not reset in Step 3 above, they will reset when the following step is done.

b. TOTAL FEEDWATER LOW FLOW INTERLOCK, 1B33-S127A and B.

Standard:

Determines Steps 4a and 4b are not required.

Comment:

NOTE The valve position permissive may not initiate at a flow control valve position of 10%. Adjusting the valve (between 8% and 10%) while monitoring terminal point 95 on Rack 2 in 1H13 P634 and ground for A and terminal point 103 and ground on Rack 2 in 1H13-P634 for B for a positive voltage will confirm when the permissive is met.

Cue:

Inform the candidate that I&C is not available to monitor for positive voltage and that he is to continue the task.

The flow control valve may not open from 8% while in fast speed operation. If this occurs, proceed to Recovery From Failure to ODen Flow Control from Minimum Position.

Appendix C Page 5 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

5.1.5 Standard

Comment:

Performance Step:

5.1.6a Standard:

Comment:

Performance Step:

5.1.7 Standard

Comment:

Operate RCIRC LOOP B FLOW CONTROL, 1B33-K603B, slide switch on P680 to obtain < 10% VALVE TRAVEL.

Operates 1B33-K603B slide switch to obtain < 10% valve position.

Operations Section expectation is to not lock the slide switch in the fast detent position.

Cue:

If requested, direct the candidate to reposition FCV B to the 9% open position.

If RCIRC B TEMP INTERLOCK is locked in, perform SVI-B33 Ti 168, Idle Recirculation Loop Temperature and Flow.

Determines step is not applicable because the alarm is not locked in.

Note:

During slow to fast speed transfer, annunciator E2 on 1H13-P870-1A, Bus H12 BREAKER TRIP will be received due to lB Breaker trip.

Take RCIRC PUMP B BRKR 5B control switch on P680 to START and verify the following:

a. LFMG B SUPPLY BRKR lB and LFMG B OUTPUT BRKR 2B on P680 open.
b. RCIRC PUMP B BRKR 5B on P680 closes and RCIRC B PUMP SPEED, 1B33-R65IB, increases to 1800 RPM.

Takes RCIRC PUMP B BRKR 5B control switch on P680 to START.

Confirms LFMG B SUPPLY BRKR 1 B and LFMG B OUTPUT BRKR 2B open. Verifies RCIRC PUMP B BRKR 5B closes and RCIRC PUMP B SPEED increases to 1800 RPM.

Candidate may announce expected alarm H13-P870-1 (E2).

Appendix C Page 6 of 12 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

5.1.8 Standard

Comment:

Performance Step:

5.1.9 Standard

Comment:

Transfer RCIRC PUMP A(B), 1B33-COOIA(B), from slow to fast speed by reperforming Steps 2 through 7 for RCIRC PUMP A(B).

Determines no operator action is required.

Recirc Pump A and B have already been transferred to fast speed.

After the transfers are complete, reset bus H 11 and H12 breaker trip annunciators by taking LFMG A and B SUPPLY BRKR 1A and B control switches to TRIP then back to NORM.

Takes LFMG A SUPPLY BRKR control switch to TRIP and back to NORM.

Takes LFMG B SUPPLY BRKR control switch to TRIP and back to NORM.

Note:

Candidate may announce expected alarm H13-P870-1 (El) and (E2) are reset.

Note:

It may be necessary to increase reactor power per 101-3 prior to performing the following step.

Appendix C Page 7 of 12 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

5.1.10 Standard:

Comment:

Performance Step:

5.1.11 Standard:

Comment:

When ICS Computer point N27ME009, Total Rx Feedwater Flow (venturi), indicates consistently > 3.43 Mlbm/hr:

a.

Verify Recirc Flow Control Cavitation Runback is reset.

b.

Verify Feedwater Cavitation Interlock relay contacts closed at 1HI3P612, card 1C34K618A(B) as follows:

Terminals 9 & 10 Terminals 13 & 14

c.

Place the following switches in NORMAL on Auxiliary Relay Panel, 1B33-POO1A and B:

1) POWER INTERLOCK, 1B33-S126A and B.
2) TOTAL FEEDWATER LOW FLOW INTERLOCK, 1B33-S127A and B.

Determines no action is required for step b.

Cue:

As the Unit Supervisor, inform the candidate that Step 5.1.10 is not required to be performed because Step 5.1.4 was not performed earlier.

Perform independent verification of required components.

Performs independent verification of required components.

Requests second individual to complete the independent verification.

Cue:

Inform the candidate that the independent verification check is completed.

Note:

Candidate proceeds to SOI-B33, Section 5.3 in order to increase core flow to 55 x 106 lbm/hr.

Note: The following step will require the candidate to perform the alternate path.

Appendix C Page 8 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

With RCIRC LOOP A and B FLOW CONTROL, 1B33-K603A and 5.3.1 1B33-K603B, in MAN on the Unit Control Console, 1H13-P680, operate the slide switches to adjust loop flows as required.

Standard:

Raises core flow by simultaneously operating both Recirc Loop A and B Flow Control slide switches using 2 second bumps (as directed in the JPM cue).

Candidate observes that FCV A did not move.

Comment:

Note: This step may require several core flow adjustments before the candidate is able to determine Recirc Flow Control Valve A is not moving.

Cue: If candidate recommends additional core flow adjustments to confirm the failure, direct the candidate to raise Recirculation flow by operating the Recirc Loop A Flow Control slide switch using a 2 second bump.

Note: Candidate should proceed to SOI-B33, Section 7.9.

Cue: If candidate asks for direction upon recognition of FCV A failure to move, then ask for his recommendation.

Cue: If candidate recommends suspending the evolution:

"* State that you have discussed the situation with the Shift Manager, Reactor Engineering, and Operations Management, and inform the candidate the startup will continue.

"* Then ask the candidate what course of action is recommended to allow the startup to continue.

"* Candidate should recommend using SOI-B33, Section 7.9.

Cue: If candidate requests a briefing prior to performing SOI-B33, Section 7.9, then direct the candidate to lead the brief.

Appendix C Page 9 of 12 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

7.9.1 Standard

Prior to adjusting HPU pressure in any of the subsequent steps verify Servo Error is 0%.

Takes Flow Controller B33-K603A to lower position until Servo Error indicates 0% on B33-K603A Servo Error indicator.

Comment:

Performance Step:

7.9.2.a If Loop A FCV failed to open:

Standard:

Comment:

Performance Step:

7.9.2.b Standard:

Increase the pressure setting of HPU 1B33-DO03A, Subloop 1, as read on local gauge 1B33-R708A, to 2000 psig by adjusting HPU A Subloop I Pump Discharge Relief, 1B33-F587A.

Directs NLO to raise pressure to 2000 psig or directs NLO to perform SOI-B33, Section 7.9.2.a for HPU A Subloop 1.

Cue: If asked, NLO will report an initial pressure of 1900 psig.

Cue: NLO reports pressure has been raised to 2000 psig.

Note: Verify that the Simulator Driver has deleted Malfunction TH23A before Step 7.9.2.b is performed by the candidate.

Note: When the malfunction is deleted, candidate may observe several small servo error oscillations and take conservative action to shutdown the HPU and lockup Recirc Flow Control Valve A.

Increase the VALVE TRAVEL of the control valve using the slide switch of RCIRC LOOP A FLOW CONTROL, 1B33-K603A, on P680.

Operates 1 B33-K603A slide switch to increase valve travel.

Determines Recirc FCV A is responding and informs the Unit Supervisor.

Note: SRO oversight required for this action.

Comment:

Appendix C Page 10 of 12 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

7.9.2.c Standard:

If the flow control valve still will not open, consult the Shift Supervisor and, at his direction, increase HPU pressure up to a maximum of 2100 psig in 50 psig steps.

No action is required.

Comment:

Performance Step:

7.9.2.d Increase the VALVE TRAVEL of the control valve using the slide switch of RCIRC LOOP A FLOW CONTROL, 1B33-K603A.

No action is required.

Performance Step:

7.9.2.e Standard:

Comment:

Restore the pressure setting of I-IPU 1B33-DO03A, to 1850-1950 psig.

Directs NLO to restore pressure setting to 1850 to 1950 psig.

Cue: NLO reports pressure setting restored to 1900 psig.

Cue: Inform candidate core flow adjustments will be suspended until management has reviewed all issues concerning the sticking Recirc Flow Control Valve A.

Note: This step is critical only if the candidate does not shutdown the HPU to lockup the Recirc Flow Control Valve.

Terminating Cue:

When SOI-B33, Section 7.9.2 is completed or HPU A has been shutdown, the evaluation for this JPM is complete.

Standard:

Comment:

Form ES-C-I Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC S I Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

N/A Number of Attempts:

Time to complete:

Appendix C Page 12 of 12 Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE:

A plant startup is in progress. Recirc Pump A has just been transferred from slow to fast speed in accordance with SOI-B33, Reactor Recirculation System, Section 5.1, Steps 1 through 7.

The Unit Supervisor, with concurrence from Reactor Engineering, directs you, as the Reactor Operator, to transfer Recirc Pump B from slow to fast speed and raise core flow to 55x 106 LBM/HR in accordance with SOI-B33.

Raise Recirculation flow by simultaneously operating the Recirc Loop A and B Flow Control slide switches using 2 second bumps.

Appendix C Job Performance Measure Form ES-C-I Worksheet Facility:

Task

Title:

K/A

Reference:

Examinee:

Facility Evaluator:

Perry CRD Pump Alternate Iniection for Level Control (Alt. Path) 295009 EA1.08/EAI.10 Task No:

JPM No:

201-565-05-01 2002 NRC S2 NRC Examiner:

N/A Date:

Method of testing Simulated Performance Actual Performance Classroom Simulator READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

The reactor is shutdown. PEI-B 13, RPV Control (Non-ATWS) has been entered due to RPV level less than Level 3. Feedwater, HPCS, and RCIC are unavailable and RPV level is slowly decreasing.

CRD Alternate Injection into the RPV using CRD Pump A is completed.

Control Room PET File Cabinet:

PEI-SPI 4.1, Rev 0, PIC 1 Two PEI-SPI keys PEI-SPI 4.1, Rev 0, PIC I The Unit Supervisor directs you, as the Reactor Operator, to perform CRD Alternate Injection in accordance with PEI-SPI 4.1.

NO 15 minutes NUREG 1021, Revision 8, Supplement 1 In simulator Plant

Appendix C Page 2 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

7.0 Standard

If any CRD pump is running and any Service Air Compressor or Instrument Air Compressor is running, then proceed to step 7 of this instruction.

Observes CRD Pump A and Service Air Compressor are running.

Proceeds to step 7.

If Instrument Air is isolated to Containment and no known air leak is present in Containment, then OPEN INST AIR CNTMT ISOL P52-F200.

Observes Instrument Air not isolated to Containment; P52-F200 open (red light on, green light off).

Performance Step:

8.1 Commence injection as follows:

Verify the following pushbuttons are armed and depressed:

RPS MANUAL SCRAM CH A C71A-S3A RPS MANUAL SCRAM CH C C71A-S3C RPS MANUAL SCRAM CH B C71A-S3B RPS MANUAL SCRAM CH D C71A-S3D Standard:

Verifies RPS Manual Scram pushbuttons are armed and depressed or confirms white scram solenoid lights are out at H13-P680.

Comment:

NUREG 1021, Revision 8, Supplement I Performance Step:

1.0 Standard

Comment:

Comment:

Appendix C Performance Step:

8.2 Standard

Comment:

Performance Step:

8.3 Standard

Comment:

Performance Step:

2.1 Standard

Comment:

Page 3 of 10 Form ES PERFORMANCE INFORMATION Verify CRD HYDRAULICS FLOW CONTROL C 1 -R600 is in MANUAL.

Places CRD Hydraulics Flow Controller in MANUAL.

C-1 Note: The following step will require the candidate to perform the alternate path.

Adjust CRD HYDRAULICS FLOW CONTROL C 1 -R600 output slowly to 100 to maximize flow.

Raises CRD Hydraulics Flow Controller output in MANUAL to 100.

Note: Drywell leak will result in a LOCA signal. Candidate must recognize CRD pump trip and return to procedure step 2 for additional actions.

Cue: If candidate asks, CRD alternate injection is still required.

If Bus XH1 I is de-energized, then restore Bus XH1 I as follows:

PLACE BUS XH1 I LOCA BYPASS keylock switch in BYPASS.

Places BUS XHI 1 LOCA BYPASS keylock switch in BYPASS.

Expected alarm, H13-P877-1 (G5), BUS XHI I LOCA BYPASS.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 4 of 10 Form ES-C-i PERFORMANCE INFORMATION Performance Step:

2.2 Standard

Comment:

CLOSE ISOLATING BRKR EHI 116.

Closes Isolating Breaker EH 1116. Candidate may match green flag breaker prior to closing the breaker. If breaker green flag is matched, alarm H 13-P877-1 (G2) will clear.

Candidate observes breaker closed (red light on, green light off).

When breaker is closed, these alarms are expected to clear at panel H13-P877-1:

G2, BUS EH 1I BREAKER TRIP G4, BUS XH1 1 STRIPPED UNDERVOLTAGE Performance Step:

3.1 Standard

Comment:

If Bus XH12 is de-energized, then restore Bus XH12 as follows:

PLACE BUS XH12 LOCA BYPASS keylock switch in BYPASS.

Places BUS XH12 LOCA BYPASS keylock switch in BYPASS.

Candidate may announce expected alarm, H13-P877-2 (G5), BUS XHI2 LOCA BYPASS.

Cue: If asked about the necessity to reenergize Bus XH12, direct candidate to perform procedure as written.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

3.2 Standard

Comment:

Performance Step:

4.0 Standard

CLOSE ISOLATING BRKR EH1214.

Closes Isolating Breaker EH1214. Candidate may match green flag breaker prior to closing the breaker. If breaker green flag is matched, alarm Hl3-P877-2 (G2) will clear.

Candidate observes breaker closed (red light on, green light off)

Observes Bus XH12 voltage available lamp lit.

When breaker is closed, alarms expected to clear at panel H13 P877-2:

G2, BUS EH12 BREAKER TRIP G4, BUS XH12 STRIPPED UNDERVOLTAGE At H13-P970, verify only one of the following is running:

"* NCC PUMP A P43-COOIA

"* NCC PUMP B P43-COOlB

"* NCC PUMP C P43-COO1C Determines only NCC Pump C is operating.

Comment:

Performance Step:

5.0 If no Service Air Compressor is running and no Instrument Air Compressor is running, then refer to SOI-P51/52, Service and Instrument Air System, Section 4.3, Serv (Inst) Air Compressor Manual Startup from Standby Readiness.

Determines Service Air Compressor is running.

No action required.

Comment:

NUREG 1021, Revision 8, Supplement I Standard:

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE [NFORMATION Performance Step:

If no CRD pump is running, then start CRD Pump A as follows:

6.0

"* Start CRD AUX OIL PUMP A C 11-CO02A.

"* Verify blue PERM light is energized.

"* Place CRD HYDRAULICS FLOW CONTROL C1 I-R600 in MANUAL and ADJUST output to 0.

"* Start CRD Pump AClI-COOIA.

Standard:

0 Starts Aux Oil Pump. Observes red light on, green light off, H13-P601-22 (F2), CRD PUMP A TRIP OIL PRESSURE LOW alarm clears.

"* Observes blue permissive light is on.

"* Places CRD Hydraulics Flow Controller in MANUAL and adjusts output to 0.

"* Starts CRD Pump A, observes red light on, green light off.

Candidate may elect to first clear the pump trip alarm (H13-P601-22 (D2) by placing the control switch in STOP prior to starting the pump.

Comment:

Alarm H13-P601-22 (D2), CRD PUMP AUTO TRIP is expected to clear when CRD Pump A is started.

Performance Step:

If Instrument Air is isolated to Containment and no known air leak is 7.0 present in Containment, then OPEN INST AIR CNTMT ISOL P52-F200.

Standard:

Places valve control switch to OPEN position. Observes red light on, green light off, and amber override light on.

Comment:

Cue: If asked, no known air leak is present in Containment.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

8.1 Commence injection as follows:

0 Verify the following pushbuttons are armed and depressed:

6 S

0 Standard:

RPS MANUAL SCRAM CH A C71A-S3A RPS MANUAL SCRAM CH C C71A-S3C RPS MANUAL SCRAM CH B C71A-S3B RPS MANUAL SCRAM CH D C71A-S3D Confirms RPS Manual Scram pushbuttons are armed and depressed or confirms white scram solenoid lights are out at H13-P680.

Comment:

Performance Step:

8.2 Standard

Verify CRD HYDRAULICS FLOW CONTROL C1 I-R600 is in MANUAL.

Verifies CRD Hydraulics Flow Controller is in Manual.

Comment:

Performance Step:

8.3 Standard

Comment:

Performance Step:

8.4 Standard

Adjust CRD HYDRAULICS FLOW CONTROL C 1 -R600 output slowly to 100 to maximize flow.

Raises CRD Hydraulics Flow Controller output in MANUAL to 100%.

Following alarms may come in as flow is raised:

H13-P601-22 (H3)

H13-P601-22 (D3)

Open CRD DRIVE PRESS CONTROL VALVE CI1 -F003.

Holds control switch in open until red light is on and green light is off.

Comment:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 8 of 10 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

8.5 Standard

Comment:

At IB 574' C/08, CRD Pump Room, UNLOCK and CLOSE Pump A Minimum Flow Isolation ICI 1 -F015A.

Directs NLO to close IC 1-FOl5A.

Cue: Minimum Flow Isolation 1Cll-FO15A is closed.

Terminating Cue:

When PEI-SPI 4.1 Step 8.5 is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result:

2002 NRC S2 N/A SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

IMTIATING CUE:

The reactor is shutdown. PEI-B 13, RPV Control (Non-ATWS) has been entered due to RPV level less than Level 3. Feedwater, HPCS, and RCIC are unavailable and RPV level is slowly decreasing.

The Unit Supervisor directs you, as the Reactor Operator, to perform CRD Alternate Injection in accordance with PEI-SPI 4.1.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet PerrM Shift Control Room HVAC and Emergency Recirculation System from Emergency Recirculation to Normal Task No:

JPM No:

037-532-01-01 2002 NRC S3 K/A

Reference:

Examinee:

Facility Evaluator:

Method of testing 290003 A4.01 NRC Examiner:

N/A Date:

Simulated Performance Actual Performance Classroom Simulator In Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

Train A and B of the Control Room HVAC and Emergency Recirculation System automatically started due to a spurious upscale trip of the Control Room Airborne Gas Monitor, D17-K776.

SOI-M25/26 Section 4.5 has been performed with Train A in operation and Train B overridden off.

The spurious signal has cleared and alarms at D 17-K776 have been reset.

Control Room HVAC Train A is operating in the Normal mode.

SOI M25/26, Rev. 9, PIC 05 SOI M25/26, Rev. 9, PIC 05 The Unit Supervisor directs you, as the Reactor Operator, to shift Control Room HVAC Train A from the Emergency Recirculation Mode to the Normal Mode in accordance with SOI M25/26.

NO 23 minutes NUREG 1021, Revision 8, Supplement I Facility:

Task

Title:

Appendix C Page 2 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

5.6.1 Standard

If CONT RM HVAC A INBD SUPP DMPR, M25-F020B, or CONT RM HVAC B INBD SUPP DMPR, M25-FO20A, is closed, perform Reset of Emergency Recirculation Auto Initiation.

Observes that M25-FO20A and M25-FO20B are closed. Proceeds to Section 7.2.

Comment:

Performance Step:

7.2.1 Standard

Comment:

Verify both of the following in EMERG RCIRC:

a.

CONT RM HVAC TRAIN A MODE SELECT, M25-$7.

b. CONT RM HVAC TRAIN B MODE SELECT, M25-$8.

Verifies both switches in EMERG RCIRC.

Performance Step:

7.2.2 If Train A is operating, perform the following:

a.

Place CONT RM HVAC TRAIN A CONT, M25-$5, in ON.

b.

Take CONT RM EMG RCIRC A ELEC HTG CONT, M26-DOO1A, to STOP.

c.

Observe if an amber LOCA, LOOP, or HI RAD Override light comes on.

Standard:

Verifies M25-$5 is in ON position.

Places Electric Heating Coil A control switch to STOP position.

Observes green light on, red light off.

Observes amber light flicker but does not remain on.

Comment:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

7.2.3 If Train B is operating, perform the following:

a. Place CONT RM HVAC TRAIN B CONT, M25-$6, in ON.
b. Take CONT RM EMG RCIRC B ELEC HTG CONT, M26-DOOIB, to STOP.
c.

Observe if an amber LOCA, LOOP, or HI RAD Override light comes on.

Standard:

No action required. Train B is overridden.

Comment:

Performance Step:

7.2.3a Standard:

If Train A (B) is in secured status, take CONT RM HVAC TRAIN A (B) CONT, M25-S5(6) to STOP.

No action required. Neither train is in secured status.

Comment:

Performance Step:

7.2.4 Standard

Comment:

Wait 2 minutes to allow the heating coils to cool.

Acknowledges 2 minute wait period.

Cue: Inform the candidate 2 minutes has elapsed.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 4 of 9 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

7.2.5 Standard

Perform the following to reset any initiation signals as necessary:

a. If either LOCA Override light is on, perform the appropriate sections of ONI-B21-4.
b. If either LOOP Override light is on, perform the appropriate sections of ONI-R1O.
c.

If either HI RAD Override light is on, reset CONTROL ROOM ATMOS HI RAD, D17-K776, module by depressing the white FAIL RESET pushbutton on Common Airborne Radiation Monitoring Panel, H13-P902.

No action required. Control Room ABRM Module, D17-K776 has already been reset.

Comment:

Performance Step:

7.2.6 Standard

Confirm all amber LOCA, LOOP, and HI RAD Override lights are OFF.

Confirms all amber lights are off.

Comment:

Performance Step:

7.2.7 Standard

If either AUTO INIT. ACTIVE light is on, momentarily depress the following to reset the isolation:

a.

CONT ROOM HVAC DIV 1 ISOL RESET, M25-SI 1.

b.

CONT ROOM HVAC DIV 2 ISOL RESET, M25-S12.

"* Depresses DIV I ISOL RESET pushbutton.

"* Depresses DIV 2 ISOL RESET pushbutton.

Comment:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

7.2.8 Standard

Take the following control switches to OPEN:

a.

CONT RM HVAC A INBD SUPP DMPR, M25-F020B.

b. CONT RM HVAC B INBD SUPP DMPR, M25-FO20A.

Places both control switches to OPEN position. Observes red light on, green light off for each damper.

Comment:

Performance Step:

7.2.9 Standard

Comment:

Performance Step:

5.6.2 Standard

Comment:

Confirm CONT RM HVAC A INBD SUPP DMPR, M25-FO20B, and CONT RM HVAC B INBD SUPP DMPR, M25-FO20A, remain open when their control switches are returned to AUTO.

Confirms dampers remain open.

Section 7.2 is complete. Candidate should return to Section 5.6, Step 2.

If in operation, take CONT RM EMG RCIRC A ELEC HTG CONT, M26-DOOIA, to STOP. Wait for 2 minutes to allow the heating coils to cool.

Confirms Electric Heating Coil is off. Observes green light on, red light off.

Electric Heating Coil was previously secured in Step 7.2.2.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

Place both of the following in NORM:

5.6.3

a.

CONT RM HVAC TRAIN A MODE SELECT, M25-S7.

b.

CONT RM HVAC TRAIN B MODE SELECT, M25-S8.

Standard:

Places Train A Mode Select switch in NORM position and observes fans shift and dampers reposition.

0 Places Train B Mode Select switch in NORM position and observes dampers reposition. (Fans remain off.)

Comment:

With Train A Mode Select in NORM, expect alarm H13-P904-2 (B3), CONT. RM HVAC EMER RECIRC A INIT to clear.

Performance Step:

Confirm components in the proper configuration in accordance with 5.6.4 the appropriate attachment:

a., Configuration with Train A in Operation, Train B Shutdown.
b., Configuration with Train B in Operation, Train A Shutdown.
c., Configuration with Both Trains in Operation.

Standard:

Candidate selects Attachment 5 and confirms all components are in the position required by the Attachment.

Comment:

Cue: If asked, the NLO will report that MCC, SWGR, BATT RMS MODE SWITCH TRAIN A DAMPER switch is in NORMAL and CONT RM EXHAUST DAMPER A, M24-F051A, is open.

Cue: If asked, the NLO will report that MCC, SWGR, BATT RMS MODE SWITCH TRAIN B DAMPER switch is in NORMAL and CONT RM EXHAUST DAMPER B, M24-F051B, is closed.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 7 of 9 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

5.6.5 Standard

Comment:

Verify the condensate loop seals of Supply Plenum M25-BOOIA and M25-BOOIB are filled as follows:

a. Check all loop seals for the blowing or sucking of air.
b. If either situation is present, remove the fill cap and fill the seal with water.
c.

Recheck the seal for the blowing or sucking of air.

Dispatches NLO to check loop seals.

Cue: Notify candidate that loop seals are full.

Terminating Cue:

When SOI-M25/26, Section 5.6 is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure No.

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Page 8 of 9 Page 8 of 9 VERIFICATION OF COMPLETION 2002 NRC S3 Form ES-C-I N/A Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

Train A and B of the Control Room HVAC and Emergency Recirculation System automatically started due to a spurious upscale trip of the Control Room Airborne Gas Monitor, D I7-K776.

SOI-M25/26 Section 4.5 has been performed with Train A in operation and Train B overridden off.

The spurious signal has cleared and alarms at DI 7-K776 have been reset.

INITIATING CUE:

The Unit Supervisor directs you, as the Reactor Operator, to shift Control Room HVAC Train A from the Emergency Recirculation Mode to the Normal Mode in accordance with SOI M25/26.

NUREG 1021, Revision 8, Supplement I

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:

Task

Title:

K/A

Reference:

Examinee:

Facility Evaluator:

Perry RCIC Startup from Standby Readiness (CST to CST) (Alt.

Path) 217000 A1.01, A2.10, A3.02, A4.04 Task No:

JPM No:

217-509-01-01 2002 NRC S4 NRC Examiner:

N/A Date:

Method of testing Simulated Performance Actual Performance Classroom Simulator In Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

The reactor is shutdown. PEI-B 13, RPV Control (Non-ATWS), has been entered due to low RPV level. The MSIVs are closed. ESW Loop A and ECC Loop A are in operation.

RCIC System is operating in the CST to CST mode at 700 gpm.

SOI-ES1, Rev 7, PIC 12 SOI-E51, Rev 7, PIC 12 The Unit Supervisor directs you, as the Reactor Operator, to startup RCIC from standby readiness (CST to CST) and establish and maintain 700 gpm flow in accordance with SOI-E51.

NO 14 minutes NUREG 1021, Revision 8, Supplement I

Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

Initiate evacuation of any personnel from the Reactor Building 4.5.1 Annulus and Containment.

Standard:

Candidate makes plant announcement.

Comment:

Performance Step:

4.5.2 Standard

Cue: If candidate contacts SAS to request Key Card verification, inform candidate that all personnel are clear.

Perform ECC Loop A Manual Startup per SOI-P42.

Confirms that ECC Loop A is in operation.

Comment:

Performance Step:

4.5.3 Standard

Verify RCIC PUMP CST SUCTION VALVE, IE51-F010, is open Verifies valve is open. Observes red light on, green light off.

Comment:

Performance Step:

4.5.4 Standard

Take the RCIC SECOND TEST VALVE TO CST, 1E51-F059, to OPEN to provide a discharge path to the CST.

Places valve control switch to OPEN position. Observes red light on, green light off.

Comment:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

4.5.5 Standard

Take RCIC TURBINE GLAND SEAL COMP, 1E51-C004, to START.

Places RCIC Turbine Gland Seal Compressor control switch to START position. Observes red light on, green light off.

Comment:

Performance Step:

4.5.6 Standard

Comment:

Performance Step:

4.5.7 Standard

Simultaneously perform the following:

a. Take RCIC STEAM SHUTOFF, 1E51-F045, to OPEN to roll the RCIC turbine.
b. Open the RCIC FIRST TEST VALVE TO CST, i E51-F022, by holding the control switch in OPEN.

Simultaneously places F045 valve control switch to OPEN position and holds F022 valve control switch in OPEN position. Observes red light on and green light off for each valve. Observes turbine speed, pressure, and pump flow increasing (E51 -R607, R601, and R606).

RCIC Pump Flow Controller failure is active. Candidate must determine RCIC Pump Flow Controller has failed before the completion of Step 4.5.9.

Ensure RCIC PUMP MIN FLOW VALVE, IE5 1-F019, opens if RCIC flow is less than 120 GPM and the RCIC pump discharge pressure is greater than 125 psig.

Observes flow and pressure indication and verifies valve remains closed.

Comment:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 4 of 7 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

4.5.8 Standard

Comment:

  • Performance Step:

4.5.9 Standard

Comment:

Performance Step:

4.5.10 Standard:

Verify the following valves automatically close after RCIC STEAM SHUTOFF, I E51-F045 is open:

a.

RCIC TURB CNDS TO CRW FIRST SHUTOFF, l E51-F004.

b.

RCIC TURB CNDS TO CRW SECOND SHUTOFF, IE51-F005.

c.

RHR & RCIC ST SUPP FIRST DRN SHUTOFF, IE5 1-F025.

d. RHR & RCIC ST SUPP SECOND DRN SHUTOFF, 1 E51 -F026.

Verifies valves are closed. Observes green light on and red light off for each valve.

Note: The following step will require the candidate to perform the alternate path.

Using RCIC PUMP FLOW CONTROL, IE5 I-R600, adjust flow until the desired flow is reached.

Determines RCIC Pump Flow Controller has failed in Automatic, informs Unit Supervisor, takes manual control, and adjusts RCIC flow to 700 gpm.

Cue: Acknowledge RCIC Pump Flow Controller failure in Automatic and concur with placing the RCIC Pump Flow Controller in Manual.

Prior to lowering RCIC flow to less than 350 GPM, take manual control of RCIC flow by placing RCIC PUMP FLOW CONTROL, l E51-R600, in MANUAL.

No action required.

Flow will not be reduced at this time.

Comment:

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 7 Form ES-C-i PERFORMANCE INFORMATION Performance Step:

4.5.11 Standard:

Throttle RCIC FIRST TEST VALVE TO CST, I E5 1 -F022, to achieve a RCIC Pump discharge pressure of approximately reactor pressure +100 psig.

Throttles valve and adjusts RCIC Pump Flow Controller to maintain RCIC Pump discharge pressure approximately 100 psig above reactor pressure and RCIC flow at 700 gpm.

Comment:

Terminating Cue:

When SOI-E5 1, Section 4.5 is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 6 of 7 Form ES-C-1 Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement 1 Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No.

2002-NRC S4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

The reactor is shutdown. PEI-B 13, RPV Control (Non-ATWS), has been entered due to low RPV level. The MSIVs are closed. ESW Loop A and ECC Loop A are in operation.

INITIATING CUE:

The Unit Supervisor directs you, as the Reactor Operator, to startup RCIC from standby readiness (CST to CST) and establish and maintain 700 gpm flow in accordance with SOI-E5 1.

NUREG 1021, Revision 8, Supplement I

Appendix C Job Performance Measure Form ES-C-1 Worksheet PerrM Terminate RHR Containment Spray Loop A Task No:

JPM No:

205-626-05-01 2002 NRC S5 K/A

Reference:

226001 A1.06. A4.03. A4.18 NRC Examiner:

N/A Date:

Simulated Performance Actual Performance Classroom Simulator In Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

A small break LOCA has occurred. The reactor is shutdown. PEI-B13, RPV Control (Non-ATWS) and PEI-T23, Containment Control, have been entered due to high Drywell pressure. RHR Loops A and B are operating in the Containment Spray mode.

RHR Containment Spray Loop A has been terminated.

PEI-SPI 3.1, Rev. 0 PEI-SPI 3.1, Rev. 0 The Unit Supervisor directs you, as the Reactor Operator, to terminate RHR Loop A Containment Spray in accordance with PEI-SPI 3.1 utilizing the procedure.

Cue: If asked, it is not necessary to perform this operation from memory.

NO 7 minutes Facility:

Task

Title:

Examinee:

Facility Evaluator:

Method of testing

Appendix C Page 2 of 6 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

3.1 Standard

If LPCI A initiation signal is present, then take LPCI A INJECTION VALVE El 2-F042A control switch to CLOSE to obtain the amber override light.

Determines LPCI A initiation signal is present:

"* H13-P601-20 (B3), LPCS AND LPCI A DRYWELL PRESSURE HIGH alarm is on.

"* LPCS and LPCI A white Seal-in light is ON above the LPCS and LPCI A Seal-in Reset pushbutton.

Place valve control switch to CLOSE position. Observes green light on, red light off, and amber override light on.

Comment:

Performance Step:

3.2 Standard

Comment:

Performance Step:

3.3 Standard

Comment:

Place CNTMT SPRAY A MANUAL INITIATION E12-S63A pushbutton collar in DISARM.

Rotates collar to the DISARM position.

Alarm H13-P601-20 (C4), CONTAINMENT SPRAY A MAN INITIATION SWITCH ARMED is expected to clear.

Depress CNTMT SPRAY A SEAL IN RESET EI2A-S64A pushbutton to reset the Containment Spray initiation logic.

Depresses pushbutton. Verifies CNTMT SPRAY white Seal-in light off above CNTMT SPRAY A SEAL-IN RESET pushbutton.

Alarm H13-P601-20 (A4), CONTAINMENT SPRAY A START SIGNAL RECEIVED is expected to clear.

Appendix C Page 3 of 6 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

3.4 Standard

Comment:

Performance Step:

3.5 Standard

Comment:

Performance Step:

3.6 Standard

Comment:

IF Combustible Gas Mixing System A is NOT running, then close CNTMT SPRAY A FIRST SHUTOFF E12-F028A.

Locates Combustible Gas Mixing System A at H13-P800 and verifies Combustible Gas Mixing System A is not running.

Places valve control switch to CLOSE position. Observes green light on, red light off, and RHR Pump A flow decreases to zero.

The candidate should confirm that RHR A Minimum Flow Valve IE 12-F064A automatically opens.

Close CNTMT SPRAY A SECOND SHUTOFF E12-F537A.

Places valve control switch to CLOSE Position. Observes green light on, red light off.

Note: The candidate may terminate the JPM at the completion of this step since he has not been directed to inject into the RPV or re-align to the Suppression Pool Cooling mode.

If directed to inject into the RPV, then commence injection with RHR A Pump as follows:

No action required.

Note: Candidate may have already terminated the JPM at the completion of Step 3.5.

Cue: RHR injection is not required.

Appendix C Page 4 of 6 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

3.7 Standard

Comment:

If directed to place RHR A in Suppression Pool Cooling, then commence Suppression Pool Cooling as follows:

No action required.

Note: Candidate may have already terminated the JPM at the completion of Step 3.5.

Cue: Suppression Pool Cooling is not required.

Terminating Cue:

When PEI-SPI 3.1, Step 3.5 is completed, the evaluation for this JPM is complete.

Appendix C Page 5 of 6 i.

Result:

Form ES-C-1 SAT OR UNSAT Examiner's Signature and Date:

Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC S5 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

N/A Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Appendix C Page 6 of 6 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE:

A small break LOCA has occurred. The reactor is shutdown. PEI-B 13, RPV Control (Non-ATWS) and PEI-T23, Containment Control, have been entered due to high Drywell pressure. RHR Loops A and B are operating in the Containment Spray mode.

The Unit Supervisor directs you, as the Reactor Operator, to terminate RHR Loop A Containment Spray in accordance with PEI-SPI 3.1 utilizing the procedure.

Appendix C Job Performance Measure Form ES-C-I Worksheet Facility:

Task

Title:

K/A

Reference:

PerrM Remotely Transfer Bus EH 12 to the Alternate Preferred Source from the DG 264000 A1.09. A4.04. A4.05 Task No:

JPM No:

264-521-01-01 2002 NRC S6 NRC Examiner:

Date:

Method of testing Simulated Performance Actual Performance Classroom Simulator In Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

The Division 2 Diesel Generator is supplying Bus EH12 with control of the Diesel Generator from the Control Room.

An NLO (Bill Smith) is on station at the Division 2 Diesel Generator.

Bus EH12 is transferred to the Alternate Preferred source from the Diesel Generator.

SOI-R43, Rev 8, PIC 17 SOI-R43, Rev 8. PIC 17 The Unit Supervisor directs you, as the Reactor Operator, to remotely transfer Bus EH12 to the Alternate Preferred source from the Diesel Generator in accordance with SOI-R43.

NO 22 minutes NUREG 1021, Revision 8, Supplement 1 Examinee:

Facility Evaluator:

N/A

Appendix C Page 2 of 7 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

5.4.1 Standard

Comment:

Performance Step:

5.4.2 Standard

If the Diesel Generator is being controlled locally, perform Transferring Control to the Control Room (Remote Control).

No action required.

Note: Information contained in Initial Conditions.

Perform one of the following as applicable:

a. If placing Bus EH12 on the Alternate Preferred Source, place SYNCH SEL SWITCH in TH21.
b. If placing Bus EH12 on the Preferred Source, place SYNCH SEL SWITCH in TH 1.

Places SYNCH SEL SWITCH to TH21 position. Observes Synchroscope is activated.

Comment:

Performance Step:

5.4.3 Standard

Comment:

Adjust the following as necessary:

a.

DIESEL GEN GOVERNOR such that SYNCHROSCOPE, 1R43-R032B, is moving slow in the FAST direction.

b.

DIESEL GEN VOLTAGE RGLTR to match Bus EH12 VOLTS, INCOMING, 1R22-R03I B; and RUNNING, 1R22-R032B.

Operates Governor control switch to ensure synchroscope is moving slowly in the FAST direction.

Operates Voltage Regulator control switch to match Bus EH12 incoming and running voltages.

Cue: If asked, mechanical governor control is not in use.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 3 of 7 Form ES-C-I PERFORMANCE INFORMATION

  • Performance Step:

5.4.4 Standard

Comment:

Performance Step:

5.4.5 Standard

Comment:

With SYNCHROSCOPE, 1R43-R032B moving slow in the FAST direction, at approximately the 2 minutes to 12 o'clock position, perform one of the following as applicable:

NOTE: When the Preferred or Alternate Preferred Source Breaker is closed, the indicated Generator Load will decrease (sometimes less than 0) unless using mechanical governor control. It may be necessary to raise load with the DIESEL GEN GOVERNOR to prevent a reverse power condition.

a. If placing Bus EH12 on the Alternate Preferred Source, close Brkr EH1213, ALTN PREFERRED SOURCE BRKR.
b. If placing EH12 on the Preferred Source, close Brkr EH1212, PREFERRED SOURCE BRKR.

Closes Brkr EH 1213 when synchroscope points to 2 minutes before 12 o'clock. Observes breaker red light on, green light off. Operates Governor control switch as necessary to prevent a reverse power condition.

Cue: If asked, mechanical governor control is not in use.

Place SYNCH SEL SWITCH in OFF.

Places SYNCH SEL SWITCH to OFF position.

Candidate should not exit SOI-R43 at Step 5.4.6, but should continue on to Step 5.4.7.

Cue: If asked, then inform the candidate it is not desired to operate the Diesel Generator in parallel with the grid.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 4 of 7 Form ES-C-i PERFORMANCE INFORMATION Performance Step:

Perform the following concurrently:

5.4.7

a. Adjust DIESEL GEN VOLTAGE RGLTR to achieve approximately 100 KVAR on DG LOADING KILOVARS, 1R43-R022B.
b. If time permits and rapid generator load reduction is not necessary, adjust DIESEL GEN GOVERNOR to achieve approximately 100 KW on DG LOADING KILOWATTS, 1R43-R023B as follows:
1) Lower generator load to 2500 KW at the rate of 150-200 KW per minute.

NOTE: The Diesel Generator should be shutdown within 5 minutes after reaching 2500 KW. Load reduction limitations do not apply below 2500 KW.

2) Lower generator load to 100 KW.
c.

If time does not permit and rapid load reduction is necessary, adjust DIESEL GEN GOVERNOR to achieve approximately 100 KW on DG LOADING KILOWATTS, 1R43-R023B.

Standard:

a. Operates Voltage Regulator control switch to achieve 100 KVARs.
b. Operates Governor control switch to achieve 100 KW.

Comment:

Cue: Rapid load reduction is not necessary.

Performance Step:

Take Brkr EH1201, DIESEL GEN BRKR, to TRIP.

5.4.8 Standard

Places breaker control switch to TRIP position. Observes green light on, red light off.

Comment:

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 5 of 7 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

5.4.9 Standard

Comment:

Shutdown Division 2 Diesel Generator to the desired configuration.

No action required.

Cue: Inform candidate that another Reactor Operator will be assigned to shutdown the Division 2 Diesel Generator.

Terminating Cue:

When SOI-R43, Section 5.4, is completed, the evaluation for the JPM is complete.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC S6 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

The Division 2 Diesel Generator is supplying Bus EH12 with control of the Diesel Generator from the Control Room.

An NLO (Bill Smith) is on station at the Division 2 Diesel Generator.

INITIATING CUE:

The Unit Supervisor directs you, as the Reactor Operator, to remotely transfer Bus EH12 to the Alternate Preferred source from the Diesel Generator in accordance with SOI-R43.

NUREG 1021, Revision 8, Supplement I

Appendix C Job Performance Measure Form ES-C-I Worksheet Facility:

Task

Title:

K/A

Reference:

Perry Task No:

Opening Inboard Main Steam JPM No:

Isolation Drain Valve (for RPV Pressure Control) 239001 A1.08, A4.02, A4.09, A2.12 239-546-05-01 NRC 2002 - S7 NRC Examiner:

Facility Evaluator:

Method of testing Simulated Performance Classroom N/A Date:

N/A Actual Performance Simulator In Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

A major seismic event has occurred. The Severe Accident Guidelines have been entered due to not being able to maintain RPV pressure at least 60 psig greater then Containment pressure. To provide an alternate method to prevent repressurization of the RPV, opening of the Inboard Main Steam Line Drain Valve (B2 1 -F0 16) is required by SAG-2, RPV, Containment, and Radioactivity Release Control.

Inboard Main Steam Line Drain Valve B2 l-F016 is open.

Control Room PEI-SPI File Cabinet:

PEI-SPI 9.1, Rev. 0 Four PEI-SPI keys PEI-SPI 9.1, Rev. 0 The Unit Supervisor directs you, as the Reactor Operator, to open the Inboard Main Steam Line Isolation Valve, B2 1-F016, in accordance with PEI-SPI 9.1.

NO 10 minutes NUREG 1021, Revision 8, Supplement I Examinee:

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

1.0 Standard

Comment:

Performance Step:

2.0 Standard

VERIFY the following valves are closed:

MSL DRN & MSIV BYP INBD ISOL B21-F016 MSL DRN & MSIV BYP OTBD ISOL B21-F019 Verifies each valve closed (green light on, red light off).

Comment:

NUJREG 1021, Revision 8, Supplement I VERIFY the following control switches are in CLOSE:

MSL B INBD MSIV B21-F022B MSL D INBD MSIV B21-F022D MSL A INBD MSIV B21-F022A MSL C INBD MSIV B21-F022C MSL B OTBD MSIV B21-F028B MSL D OTBD MSIV B21-F028D MSL A OTBD MSIV B21-F028A MSL C OTBD MSIV B21-F028C Verifies each MSIV Control Switch is in CLOSE position.

Appendix C Page 3 of 6 Form ES-C-I PERFORMANCE INFORMATION

" Performance Step:

3.1 Standard

Comment:

" Performance Step:

3.2 Standard

Comment:

" Performance Step:

3.3 Standard

Comment:

Performance Step:

3.4 Standard

Comment:

Defeat MSIV low RPV level isolation as follows:

At H13-P694, place MSIV ISOL LO LEVEL BYPASS CH D B21H-S76D keylock switch in BYP.

Places MSIV ISOL LO LEVEL BYPASS CH D in BYPASS.

Candidate may first locate panel H13-P694, and then proceed to the Simulator PEI-SPI panel and place the keylock switch in BYPASS.

At H13-P691, place MSIV ISOL LO LEVEL BYPASS CH A B21H-S76A keylock switch in BYP.

Places MSIV ISOL LO LEVEL BYPASS CH A keylock switch in BYPASS.

Candidate may first locate panel H13-P691, and then proceed to the Simulator PEI-SPI panel and place the keylock switch in BYPASS.

At H13-P692, place MSIV ISOL LO LEVEL BYPASS CH B B21H-S76B keylock switch in BYP.

Places MSIV ISOL LO LEVEL BYPASS CH B keylock switch in BYPASS.

Candidate may first locate panel H13-P692, and then proceed to the Simulator PEI-SPI panel and place the keylock switch in BYPASS.

At H13-P693, place MSIV ISOL LO LEVEL BYPASS CH C B21H-S76C keylock switch in BYP.

Places MSIV ISOL LO LEVEL BYPASS CH C keylock switch in BYPASS.

Candidate may first locate panel H13-P693, and then proceed to the Simulator PEI-SPI panel and place the keylock switch in BYPASS.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

4.0 Standard

Comment:

Performance Step:

5.0 Standard

When the following alarms have cleared, Note: Alarms located at H13-P601-19:

MSL ISOL MAIN STEAM LINE FLOW HIGH (A3)

MSL ISOL TURBINE AREA TEMP HIGH (33)

MSL & RWCU ISOL STEAM TUNNEL TEMP HIGH (B4) then depress the following pushbuttons:

MSL & NS4 INBD ISOL SEAL IN RESET, lB21H-S32 MSL & NS4 OTBD ISOL SEAL IN RESET, 1B21H-S33 Verifies alarms have cleared and then depresses each Seal-in Reset pushbutton.

Expect alarm H13-P601-19 (Al), MSIV CLOSED SIGNAL RECEIVED to clear.

  • Procedure discrepancy exists. S32 is the Outboard Seal-in Reset Pushbutton and S33 is the Inboard Seal-in Reset Pushbutton.

Verify the MSL DRN & MSIV BYP INBD ISOL B21-F016 valve is open.

Places control switch to OPEN; observes red light on, green light off.

Comment:

Terminating Cue:

When PEI-SPI 9.1, Step 5.0 is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 5 of 6 Form ES-C-1 Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement 1 Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC S7 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE:

A major seismic event has occurred. The Severe Accident Guidelines have been entered due to not being able to maintain RPV pressure at least 60 psig greater then Containment pressure. To provide an alternate method to prevent repressurization of the RPV, opening of the Inboard Main Steam Line Drain Valve (B21 -F0 16) is required by SAG-2, RPV, Containment, and Radioactivity Release Control.

The Unit Supervisor directs you, as the Reactor Operator, to open the Inboard Main Steam Line Isolation Valve, B2 1 -F0 16, in accordance with PEI-SPI 9.1.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Perry Commence Alternate Boron Iniection Task No:

JPM No:

211-524-05-01 2002 NRC P 1 K/A

Reference:

Examinee:

Facility Evaluator:

211000 295037 EAI.10 NRC Examiner:

N/A Date:

Method of testing Simulated Performance Classroom Actual Performance In-Plant Simulator READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

An ATWS has occurred. PEI-B 13, RPV Control (ATWS) has been entered. Alternate Boron Injection is required.

Alternate born injection into the RPV has commenced.

PEI-SPI 1.8, Rev. 1 (from OSC PEI File Cabinet)

PEI-SPI 1.8, Rev. 1 The Unit Supervisor directs you, as an In-Plant Operator, to coordinate with the Control Room to inject boron into the RPV in accordance with PEI-SPI 1.8, Alternate Boron Injection.

PEI-SPI 1.8 has been completed up through Step 9.3.

NO 18 minutes NUREG 1021, Revision 8, Supplement I Facility:

Task

Title:

Plant

Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

Standard:

Comment:

Performance Step:

9.4.1 Standard

Comment:

Performance Step:

9.4.2 Standard

Comment:

Candidate obtains procedure and necessary equipment for the task.

Locates copy of procedure.

Cue: When candidate has stated where procedure is located (Control Room or OSC PEI File Cabinet), then provide candidate with copy of procedure.

Commence Alternate Boron Injection as follows:

At AX 620' D/02, AX hallway, open ABI Pump Inlet Valve 1C41-F561.

Opens (simulates) valve by turning handwheel in the counterclockwise direction.

Cue: Valve 1C41-F561 is open.

Verify the following valves are closed:

0 0

0 0

0 HPCS INJECTION VALVE, E22-F004 HPCS PUMP MIN FLOW VALVE, E22-F012 HPCS TEST VALVE TO SUPR POOL, E22-F023 HPCS FIRST TEST VALVE TO CST, E22-FO10 HPCS SECOND TEST VALVE TO CST, E22-FO11 Contacts (simulates) Control Room to verify valves are closed (or to perform Step 9.4.2).

Cue: Step 9.4.2 is completed (valves are closed).

NUREG 1021, Revision 8, Supplement I

Appendix C

" Performance Step:

9.4.3 Standard

Comment:

Performance Step:

9.4.4 Standard

Comment:

"Performance Step:

9.4.5.2 Standard:

Comment:

Page 3 of 6 Form ES-C-1 PERFORMANCE INFORMATION At AX 620' D/02, IPCS Valve Room, open HPCS Pump Disch Line Flush Conn 1E22-F03 1.

Opens (simulates) valve by turning handwheel in the counterclockwise direction.

Note:

If the HPCS Valve Room is still designated as a High Radiation Area, then the candidate should explain (but not enter) the radiological controls required to enter the HPCS Valve Room.

Cue: The candidate is not required to enter the HPCS Valve Room.

Cue: Valve 1E22-F031 is open.

Notify the Control Room that you are ready to inject with boron.

Notifies (simulates) Control Room that he is ready to inject with boron.

Cue: Direct candidate to inject boron in accordance with Step 9.4.5.

Cue: Inform candidate that Step 9.4.5.1 is completed.

Note: If the candidate requests assistance, then inform him that no one else is available.

At IB 620' 1105, close Trsf Pump A Test Line Isol Vlv C4 I-F516A.

Closes (simulates) valve by turning handwheel in the clockwise direction.

Cue: Valve C41-F516A is closed.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

9.4.5.3 Standard:

Comment:

Performance Step:

9.4.5.4 Standard:

Comment:

Performance Step:

10.0 Standard:

Comment:

At AX 620' D/02, ABI Pump Local Starter, start ABI Pump 1C41-C004.

Depresses (simulates) START pushbutton. Observes red light on, green light off. Observes ABI Pump is running Cue: ABI Pump 1C41-C004 is running. Red light on, green light off.

At AX 620' D/02, AX Hallway, open ABI Pressure Gauge Isol Vlv 1C41-F564.

Opens (simulates) valve by turning handwheel in the counterclockwise direction. Informs Control Room that Step 9.4 is completed.

Cue: Valve 1C41-F564 is open.

Cue: Direct candidate to inform the Control Room when SLC Transfer Tank level begins to drop.

Cue: Inform candidate that another In-Plant Operator has been assigned to monitor the SLC Transfer Tank level in accordance with Step 10. You are to return to the Control Room.

When SLC Transfer Tank level reaches 18% as indicated on SLC Transfer Tank Level C4 1 -N415A or SLC Transfer Tank Level C4 1

N415B, Then SECURE injection into the RPV as follows:

Locates SLC Transfer Tank Level Indicators C4 1 -N415A and N415B in order to trend SLC Transfer Tank level.

Cue: Inform candidate that SLC Transfer Tank level is 90%

and slowly decreasing.

Cue: Inform candidate that another In-Plant Operator has been assigned to monitor the SLC Transfer Tank level in accordance with Step 10. You are to return to the Control Room.

Terminating Cue:

The evaluation for the JPM is complete when PEI-SPI 1.8, Step 10.0 is completed.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure No.

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to complete:

Question Documentation:

Question:

Response

Page 5 of 6 Page 5 of 6 VERIFICATION OF COMPLETION 2002 NRC P 1 Form ES-C-1 N/A Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 6 of 6 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:

An ATWS has occurred. PEI-B 13, RPV Control (ATWS) has been entered. Alternate Boron Injection is required.

INITIATING CUE:

The Unit Supervisor directs you, as an In-Plant Operator, coordinate with the Control Room to inject boron into the RPV in accordance with PEI-SPI 1.8, Alternate Boron Injection. PEI-SPI 1.8 has been completed up through Step 9.3.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-I Worksheet PerrM RHR Loop B Alternate Iniection Task No:

JPM No:

205-627-05-01 2002 NRC P2 K/A

Reference:

Examinee:

Facility Evaluator:

203000 A2.16 295031 EA1.08 NRC Examiner:

N/A Date:

Method of testing Simulated Performance Classroom Actual Performance In-Plant Simulator READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

A LOCA has occurred. PEI-B 13, RPV Control (Non-ATWS) has been entered. No injection systems are available. Alternate injection systems must be lined up. ESW Pump B is operating. The Division 2 Diesel Generator is in secured status.

RHR Loop B is aligned and injecting into the RPV PEI-SPI 4.2, Rev 0 (From OSC PEI File Cabinet)

PEI-SPI 4.2 Tools (From OSC PEI File Cabinet -- simulated)

Ladder (Simulated)

PEI-SPI 4.2, Rev 0 The Unit Supervisor directs you, as an In-Plant Operator, to coordinate with the Control Room to inject into the RPV in accordance with PEI-SPI 4.2, RHR Loop B Flood Alternate Injection. PEI-SPI 4.2 has been completed up through Step 2.4.

NO 34 minutes NUREG 1021, Revision 8, Supplement 1 Facility:

Task

Title:

Plant

Appendix C Page 2 of 7 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

Candidate obtains procedure and necessary equipment for the task.

Standard:

Locates copy of procedure.

Comment:

Performance Step:

2.5 Standard

Comment:

Performance Step:

2.6 Standard

Comment:

Cue: When candidate has stated where procedure is located (Control Room or OSC PEI File Cabinet), then provide candidate with copy of procedure.

At AX 599' C/03, above RHR B HX Room Door, verify RHR B FPCC Supplement Cooling Discharge Vlv 1E12-F099B is closed.

Confirms (simulates) green "close" locking device is installed.

Cue: Valve 1E12-F099B green "close" locking device is installed.

Note: Candidate should explain where he would obtain ladder (LB 599' K/os).

Note: Candidate should state that UP approval is required to gain access to equipment located more than 6 feet above floor level.

Note: Candidate should identify that 1E12-F099B is located in a Contaminated Area.

Verify RHR Pump B E12-CO02B is secured.

Contacts (simulates) Control Room to verify RHR Pump B is secured.

Cue: RHR Pump B E12-CO02B is secured.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 3 of 7 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

2.7 Standard

Comment:

Performance Step:

2.8.1 Standard

Comment:

" Performance Step:

2.8.2 Standard

Comment:

"Performance Step:

2.8.3 Standard

Comment:

Verify RHR B TO CNTMT SHUTOFF E12-F027B is open.

Contacts (simulates) Control Room to verify E12-F027B is open.

Cue: Valve E12-F027B is open.

At AX 599' B/03, perform the following:

Close ESW Emg Inject to Rx Vsl Loop Drain 1P45-F578.

Closes (simulates) valve by turning handwheel in clockwise direction.

Cue: Valve 1P45-F578 is closed.

Unlock and open ESW Emg Inject to Reactor Vessel Isol 1P45-F572.

Unlocks and opens (simulates) valve by turning handwheel in counterclockwise direction.

Cue: Valve 1P45-F572 is open.

Unlock and open approximately 260 turns ESW Emg Inject to Reactor Vessel Isol 1P45-F573 to open the valve 20%.

Unlocks and open (simulates) valve by turning handwheel 260 times in the counterclockwise direction.

Cue: Valve 1P45-F573 is opened 260 turns to 20% open.

Note: Candidate should explain that a ladder is required to reach valve.

Note: As candidate is exiting RCA to complete this JPM, the Evaluator is to continue with the remainder of Admin JPM A3.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:

2.9 Standard

Comment:

Performance Step:

2.10.1 Standard:

Comment:

Performance Step:

2.10.2 Standard:

Comment:

Performance Step:

2.11 Standard:

Comment:

At CC 574' C/05, close ECC HX B ESW Inlet IP45-F536B.

Closes (simulates) valve by turning handwheel in the clockwise direction.

Cue: Valve 1P45-F536B is closed.

If Division 2 Diesel Generator is not required to be operating, then secure ESW to Division 2 Diesel Generator as follows:

No action is required.

Note: Division 2 Diesel Generator is already in secured status.

At DGB 620' A/02, Division 2 Diesel Generator Room, unlock and close Div 2 Diesel HIX ESW Outlet 1P45-F534B.

Unlocks and closes (simulates) valve by turning handwheel in the clockwise direction.

Cue: Valve 1P45-F534B is closed.

At HI 3-P970, verify the following valves are closed:

ECC TO FPCC HX B IN VLV P42-F260B ECC TO FPCC HX B BYP VLV P42-F255B E

ECC TO FPCC HX B OUT VLV P42-F265B Contacts (simulates) Control Room to verify valves are closed (or to perform Step 2.11).

Cue: Step 2.11 is completed (valves are closed).

NUREG 1021, Revision 8, Supplement I

Appendix C Page 5 of 7 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

2.12 Standard:

Comment:

Performance Step:

2.13 Standard:

Comment:

Performance Step:

3.2.2 Standard

Comment:

Verify ESW Pump B P45-COO IB is running.

Contacts (simulates) Control Room to verify ESW Pump B is running.

Cue: ESW Pump B is running.

If ESW Pump B P45-COOIB is not running, then cross connect Fire Water and ESW as follows:

No action is required.

Note: ESW Pump B is running.

Cue: Inform the candidate that injection will be performed inside the shroud per Step 3.2 and that Step 3.2.1 has been performed in the Control Room.

At CC 620' B/03, MCC EF1D07 Compartment XL, place Remote Shutdown control switch for RHR B HX's ESW Outlet Valve 1P45-F068B in CLOSE to close the valve.

Momentarily places (simulates) control switch in the CLOSE position. Informs Control Room.

Cue: Green light on and red light off.

Terminating Cue:

When PEI-SPI 4.2, Step 3.2.2 is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement I

Appendix C Page 6 of 7 Form ES-C-1 Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 102 1, Revision 8, Supplement I App endix C Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC P2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

N/A Number of Attempts:

Time to complete:

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE:

A LOCA has occurred. PEI-B 13, RPV Control (Non-ATWS) has been entered. No injection systems are available. Alternate injection systems must be lined up. ESW Pump B is operating. Division 2 Diesel Generator is in secured status.

The Unit Supervisor directs you, as an In-Plant Operator, to coordinate with the Control Room to inject into the RPV in accordance with PEI-SPI 4.2. RHR Loop B Flood Alternate Injection. PEI-SPI 4.2 has been completed up through Step 2.4.

NUREG 1021, Revision 8, Supplement 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet PMrr Initiate CR Subfloor C02 from Outside Control Room (Alt. Path)

Task No:

JPM No:

286-518-04-01 2002 NRC P3 K/A

Reference:

Examinee:

Facility Evaluator:

286000 A2.08 600000 AA1.08 NRC Examiner:

N/A Date:

Method of testing Simulated Performance Classroom Actual Performance In-Plant Simulator READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Initiating Cue:

Time Critical Task:

Validation Time:

An electrical fire in the Control Room West Subfloor Area required the evacuation of the Control Room. All immediate actions for ONI-C6 1, Evacuation of the Control Room, have been completed.

C02 has been manually actuated for the Control Room West Subfloor Area.

SOI-P54 (Gas) Rev 0, PIC-10 SOI-P54 (Gas) Rev 0, PIC-10 The Unit Supervisor has directed you, as an In-Plant Operator, to manually initiate the Carbon Dioxide System for the Control Room West Subfloor Area in accordance with SOI-P54 (GAS).

NO 25 minutes NUREG 1021, Revision 8, Supplement 1 Facility:

Task

Title:

Plant

Appendix C Page 2 of 5 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)

Performance Step:

Standard:

Comment:

Performance Step:

5.4.1 Standard

Candidate obtains procedure and necessary for the task.

Locates copy of procedure.

Cue: When candidate has stated where procedure is located (Control Room), then provide candidate with copy of procedure.

If there is a fire in a Reactor Recirc Pump, verify open CNTMT C02 SUPPLY OTBD ISOL, 1P54-F340, per ONI-P54.

No action is required. Fire is not in Recirc Pump Comment:

Performance Step:

5.4.1a Standard:

Comment:

Performance Step:

5.4.2 Standard

Comment:

Open the Selector Valve by smashing the breakglass and rotating the pilot valve clockwise.

Locates Selector Valve Pilot Valve 1P54-F3451. (Simulates) smashing and rotating Selector Valve Pilot Valve 1P54-F3451 in the clockwise direction.

Cue: Selector Valve Pilot Valve 1P54-F3451 is open.

Hold the Selector Valve pilot valve open for the discharge time as listed in Attachment 3, then close the pilot valve.

(Simulates) holding Selector Valve Pilot Valve I P54-F3451 in the open position for 4 minutes, then closes the pilot valve.

Cue: No C02 flow noise is heard and 4 minutes have elapsed.

The following step will require the candidate to perform the alternate path.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 3 of 5 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

5.4.3 Standard

Comment:

If no C02 discharge occurs, leave the Selector Valve pilot valve open and open the Master Valve by smashing the breakglass and rotating the pilot valve clockwise and perform the following:

a. Hold the Master Valve open for the discharge time specified in.
b. Close the Master Valve pilot valve.
c. Close the Selector Valve pilot valve.

(Simulates) leaves Selector Valve Pilot Valve 1P54-F3451 in open position.

Locates Master Valve Pilot Valve P54-F344 1.

(Simulates) smashing breakglass, rotating the Master Valve Pilot Valve P54-F3441 clockwise and holds the Master Valve Pilot Valve open for 4 minutes.

(Simulates) closing Master Valve Pilot Valve P54-F3441.

(Simulates) closing Selector Valve Pilot Valve 1P54-F3451 Cue: Master Valve Pilot Valve P54-F3441 is open, C02 flow noise is heard and 4 minutes have elapsed.

Cue: Master Valve Pilot Valve P54-F3441 is closed.

Cue: Selector Valve Pilot Valve 1P54-F3451 is closed.

Terminating Cue:

When SOI-P54 (GAS), Step 5.4.3, is completed, the evaluation for this JPM is complete.

NUREG 1021, Revision 8, Supplement 1

Appendix C Page 4 of 5 VERIFICATION OF COMPLETION Job Performance Measure No.

2002 NRC P3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

N/A Number of Attempts:

Time to complete:

Form ES-C-1 Question Documentation:

Question:

Response

Result:

SAT OR UNSAT Examiner's Signature and Date:

NUREG 1021, Revision 8, Supplement I

Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

INITIATING CUE:

An electrical fire in the Control Room West Subfloor Area required the evacuation of the Control Room. All immediate actions for ONI-C61, Evacuation of the Control Room, have been completed.

The Unit Supervisor has directed you, as an In-Plant Operator, to manually initiate the Carbon Dioxide System for the Control Room West Subfloor Area in accordance with SOI-P54 (GAS).