INITIAL SUBMITTAL OF THE ADMINISTRATIVE JPMS FOR THE PERRY EXAMINATION - JAN/FEB 2003
Appendix C Job Performance Measure Form ES-C-I Worksheet Perry Evaluate Proposed Work Schedule Against Established Task No:
JPM No:
299-893-03-01 2003 NRC RO A. L.a Overtime Guidelines K/A
Reference:
2.1.2 Method of testing Simulated Performance Classroom NRC Examiner:
N/A Date:
Actual Performance Simulator Plant Task Standard:
Candidate determines that he cannot work the proposed overtime without additional authorization (i.e., an approved Technical Specification Overtime Deviation Request).
Required Materials:
NOP-LP-1002, Rev 0 General
References:
NOP-LP-1002, Rev 0 Time Critical Task:
Validation Time:
NO 10 minutes READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The plant is operating at 100% power. Operations Section shift manning is being severely affected due to a flu epidemic. All healthy licensed operators are being scheduled to work extra hours in order to cover shift vacancies.
Listed below is your proposed Work Schedule for the next 10 days.
Sun Mon Tue Wed Thu Fri Initiating Cue:
Sat Sun Mon Tue Off Off 12-24 12-24 12-24 12-24 16-24 06-16 Off 08-16 Note: All work hours shown exclude turnover time.
As a licensed operator, determine if you can work the proposed overtime without any additional authorization.
NUREG 1021, Revision 8, Supplement 1 Facility:
Task
Title:
Examinee:
Facility Evaluator:
Appendix C Page 2 of 4 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: Ensure a copy of NOP-LP-1002, Fitness For Duty Program, is available for use by the Candidate.
Performance Step:
The following guidelines are applicable to personnel performing 4.14.3 safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel).
Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods. (Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5. The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
Standard:
Determines that he will exceed Guideline #3 for his proposed Sat /
Sun work schedule (a break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods).
Determines that he cannot work the proposed overtime without additional authorization (a Technical Specification Overtime Deviation Request is requested by his Supervisor and authorized by the Plant Manager or his designees).
Comment:
Terminating Cue:
When the Candidate has determined that he cannot work the proposed overtime without additional authorization, the evaluation for this JPM is complete.
NUREG 1021, Revision 8, Supplement I
Appendix C Page 3 of 4 Form ES-C-I VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC RO A. L.a Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement I
Appendix C Page 4 of 4 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
The plant is operating at 100% power. Operations Section shift manning is being severely affected due to a flu epidemic. All healthy licensed operators are being scheduled to work extra hours in order to cover shift vacancies. Listed below is your proposed Work Schedule for the next 10 days.
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Off Off 12-24 12-24 12-24 12-24 16-24 06-16 Off 08-16 Note: All work hours shown exclude turnover time.
INITIATING CUE:
As a licensed operator, determine if you can work the proposed overtime without any additional authorization.
NUREG 1021, Revision 8, Supplement I
FENOC Procedure Number:
NOP-LP-1 002
Title:
Use Category:
Fitness For Duty Program General Skill Reference Revision:
Change:
Page 00 N/A 31 of 36 4.14 Overtime Guidelines 4.14.1 Plant staffing shall be such that adequate coverage of operating and key maintenance activities are maintained without the routine heavy use of overtime. The objective of the controls over the use of overtime is to assure that, to the extent practicable, personnel are not assigned to work activities while in a fatigued condition that could significantly reduce their mental alertness or their decision making capability and potentially create a Fitness for Duty concern.
4.14.2 The norm is for personnel work a 40-hour week while the plant is operating.
In the event that substantial amounts of overtime are required for unforeseen problems, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, the overtime guidelines shall be followed.
4.14.3 The following guidelines are applicable to personnel performing safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel). Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1.
An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2.
An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3.
A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods.
(Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4.
Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5.
The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
FENOC Procedure Number:
NOP-LP-1 002
Title:
Use Category:
Fitness For Duty Program General Skill Reference Revision:
Change:
Page 00 N/A 32 of 36 4.14.4 Deviation from the above guidelines shall normally not be required during times when the plant is operating and adequate shift coverage is available.
Exceptions to this policy may include a Limiting Condition for Operation (LCO), Emergency Plan activation or callout, or other significant need to maintain safe plant operation, to maintain shift compliment, or maintain production capability.
NOTE An electronic database version of the forms may be used as applicable to each site's overtime request program.
4.14.5 Deviations from the overtime guidelines are normally requested by the immediate supervisor and authorized by the Plant Manager or his designees (or by higher levels of management) using the Technical Specification Overtime Deviation Request (PNPP No. 7699) at the Perry Plant or the Overtime Deviation Request at DBNPS, DB-0047. Overtime deviation requests should not be completed significantly in advance of the hours to be worked.
4.14.6 Supervisors requesting overtime deviation must be familiar with the condition of the individual involved to ensure that the additional overtime hours can be safely worked.
4.14.7 The Section Manager responsible for personnel who perform safety-related functions; (e.g., Senior Reactor Operators, Reactor Operators, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants, Health Physics technicians, and Key Maintenance Personnel), shall maintain a method by which the overtime hours of an individual may be compared to the overtime guidelines.
4.14.8 The Plant Manager or his designees shall review individual overtime on a monthly basis to ensure that excessive hours have not been assigned and that routine deviation from the overtime guidelines is not authorized.
TECHNICAL SPECIFICATION OVERTIME DEVIATION REQUEST DEPTISECTION PNPP No. 7699 Rev. 9/27/00 DEVIATION CODES:
1 - MORE THAN 16 HRS STRAIGHT 3-MORE THAN 24 HRS IN 48 HRS 5-LESS THAN 8 HR BREAK BETWEEN ASSIGNMENTS 2 - MORE THAN 16 HRS IN 24 HRS 4 - MORE THAN 72 HRS IN 7 DAYS (CODES 01 -04 EXCLUDE SHIFT TURNOVER TIME)
NAME SOCIAL SECURITY CODE START END DATE REASON No.
DATE Reason shall include as a minimum: 1) the specific work to be performed, 2) why other individuals cannot not be used and 3) why the work cannot be rescheduled. General statements such as "outage support" and "to meet the schedule" are not acceptable.
I I
I I
I I
I I
I I
I I
Supervisors requesting an overtime deviation are signifying that they are familiar with the condition of the individual involved and that the individual's condition is such that the additional overtime hours can be safely worked.
REQUESTED BY GENERAL MANAGER/DIRECTOR APPROVAL
/
I Signature Date Section Signature Date I
I I
I I
I I
I I
I I
I
Appendix C Job Performance Measure Form ES-C-1 Worksheet Method of testing Simulated Performance Classroom Perry Determine the Effect(s) of Relay I E51A-K51 Removal Task No:
JPM No:
N/A 2003 NRC RO A. L.b NRC Examiner:
N/A Date:
Actual Performance Simulator Plant Task Standard:
Candidate determines that the removal of Relay I E5 IA-K51 will defeat the RCIC automatic suction transfer (i.e., prevent the automatic opening of RCIC Pump Suppression Pool Suction Isolation Valve, I E5 1 -F031, on low CST level or high SP level).
Required Materials:
Electrical Drawings - 208-075 Series General
References:
Electrical Drawings - 208-075 Series Time Critical Task:
Validation Time:
NO 20 minutes READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant is operating at 100% power. The Reactor Core Isolation Cooling System (RCIC) is in the normal Standby Readiness lineup.
Agastat Relays has issued an industry-wide notice that has identified a specific batch of relays that were not built to design specifications.
Agastat Relays has recommended that these relays be replaced as soon as practicable. Perry has identified that currently installed Relay I E5 IA-K51 was part of this batch.
The Unit Supervisor directs you to determine the potential effect(s) on the RCIC System if Relay I E5 I A-K51 were to be removed with the plant in its current operating condition.
NUREG 1021, Revision 8, Supplement I Facility:
Task
Title:
K/A
Reference:
2.1.24 Examinee:
Facility Evaluator:
Appendix C Page 2 of 5 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: The Candidate will require access to the Plant Electrical (208) Drawings located either in the Simulator, TEC Reference Library, or the Unit 1 Control Room.
Performance Step: 1 Standard:
Using the Plant Electrical (208) Drawings, determine the potential effect(s) on the RCIC System if Relay I E51 A-K51 were removed with the plant in its current operating condition.
Determines that the removal of Relay I E5 I A-K51 will defeat the RCIC automatic suction transfer (i.e., prevent the automatic opening of RCIC Pump Suppression Pool Suction Isolation Valve, I E5 1-F031, on low CST level or high SP level).
NUREG 1021, Revision 8, Supplement I
Appendix C Page 3 of 5 Form ES-C-I PERFORMANCE INFORMATION Comment:
Detailed discussion of Relay I E5tA-K5I removal.
- 1. B208-075 Sh 02:
Locates Relay I E5 IA-K51 (in far-left column).
Determines relay is shown on Sh 04.
+ Determines relay contact T I-MI is shown on Sh 21 (for valve E51 -F03 I).
- 2.
B208-075 Sh 04 Line 25:
Identifies Relay I E5 IA-K5 1.
+ Determines relay is normally de-energized.
+ Determines relay would not energize on either a low CST level (K78) or high SP level (K79)
(B208-075 Sh 10 Lines 05 & 17).
Note: Relay K50 is normally de-energized, therefore, relay contact MI-RI is normally closed.
- 3. B208-075 Sh 21 Line 09:
Identifies Relay IE51A-K51 contact MI-TI.
Determines contact would not close.
Determines RCIC Pump Suppression Pool Suction Isolation Valve, 1 E5 I -F03 1, would not automatically open if either a low CST level or high SP level condition were to occur.
Note: It is not critical for the Candidate to determine the Operability of the RCIC System in accordance with Technical Specifications.
Terminating Cue:
When the Candidate has determined that the RCIC automatic suction transfer has been defeated, the evaluation for this JPM is complete NUREG 1021, Revision 8, Supplement I
Form ES-C-1 Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement I Appendix C Page 4 of 5 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC RO A. 1.b Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 5 of 5 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
The plant is operating at 100% power. The Reactor Core Isolation Cooling System (RCIC) is in the normal Standby Readiness lineup. Agastat Relays has issued an industry-wide notice that has identified a specific batch of relays that were not built to design specifications. Agastat Relays has recommended that these relays be replaced as soon as practicable. Perry has identified that currently installed Relay I E5 IA-K5 I was part of this batch.
INITIATING CUE:
The Unit Supervisor directs you to determine the potential effect(s) on the RCIC System if Relay I E5 I A-K51 were to be removed with the plant in its current operating condition.
NUREG 1021, Revision 8, Supplement I
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Task
Title:
K/A
Reference:
Perry Perform Independent Verification of Tag Placement Task No:
JPM No:
299-655-03-01 299-574-03-01 2003 NRC RO A.2 2.2.13 NRC Examiner:
Date:
Method of testing Simulated Performance Classroom Task Standard:
Actual Performance Simulator Plant Candidate determines that valve P42-F295B was incorrectly closed and tagged. Notifies the Clearance Authority of the tagging discrepancy.
Required Materials:
NOP-OP-1001, Rev 0 Clearance PYI-P47-0027 (Copy for training only)
General
References:
NOP-OP-1001, Rev 0 Time Critical Task:
Validation Time:
NO 10 minutes READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant is operating in MODE 1. The chilled water coils for Controlled Access and Misc. Equipment Areas HVAC System (CA&MEA) Supply Plenum M21-BO0IB has a 2 gpm leak. The chilled water coils are being isolated and tagged per Clearance PY I -P47-0027.
The initial placement of the Control Room tags has been completed.
The Unit Supervisor directs you, as a Reactor Operator, to perform the independent verification of the Control Room tag placement for Clearance PY 1 -P47-0027 in accordance with NOP-OP-1001.
NUREG 1021, Revision 8, Supplement I Examinee:
Facility Evaluator:
N/A
Appendix C Page 2 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: The Evaluator will role-play as the SRO / Clearance Authority for this Admin JPM.
Note: Hand the Candidate the Clearance for his review and independent verification of tag placement.
Note: The NOMS Clearance System will not be required / used for this JPM.
Note: Each Control Room clearance tag independent verification can be evaluated in any order and will be documented in separate Performance Steps.
Note: The following Performance Step is for Valve P47-F290B.
Performance Step:
Verify tags hung as follows:
4.10.2
- 1. For each tag, perform the following:
- a.
Confirm that the proper component was selected by comparing the information placed oil the tag, the clearance and in-plant label. Abbreviated terms need not match exactly.
- b.
Confirm the component in the specified position.
- c.
Confirm the tag is securely fastened to the component in a visible location.
- d.
Check Placement 2"d Verification for that tag on the clearance.
Standard:
For valve P47-F290B:
"* Determines that the component was properly selected by comparing the information placed on the tag. the clearance and in-plant label.
"* Confirms the component is in the specified position (closed).
"* Confirms the red tag is securely fastened to the valve control switch.
"* Checks Placement 2"(1 Verification for that tag oil the clearance.
Comment:
Note: It is not required for the Candidate to enter NOMS and electronically sign for Placement 2 "d Verification for that tag on the clearance.
Cue: Inform the Candidate that he will not be required to update NOMS for the Placement 2 nd Verification of tags.
NUREG 1021, Revision 8, Supplement I
Appendix C Page 3 of 6 Form ES-C-I PERFORMANCE INFORMATION Note: The following Performance Step is for Valve P47-F295B.
- Performance Step:
Verify tags hung as follows:
4.10.2
- 1. For each tag, perform the following:
- a.
Confirmn that the proper component was selected by comparing the information placed on the tag, the clearance and in-plant label. Abbreviated terms need not match exactly.
- b.
Confirm the component in the specified position.
- c. Confirm the tag is securely fastened to the component in a visible location.
- d.
Check Placement 2 "" Verification for that tag on the clearance.
Standard:
For valve P47-F295B:
"* Determines that the component was not properly selected by comparing the information placed on the tag, the clearance and in-plant label.
- Determines red tag was placed on the control switch for valve P42-F295B instead of the control switch for valve P47-F295B.
"* Confirms the component is not in the specified position (closed).
- Determines valve P42-F295B was closed instead of valve P47-F295B.
"* Confirms the red tag is not securely fastened to the valve control switch.
- Determines red tag was secured on the control switch for valve P42-F295B instead of the control switch for valve P47-F295B.
"* Does not check Placement 2 nd Verification for that tag on the clearance.
Comment:
NUREG 1021, Revision 8, Supplement I
Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step:
4.9.2 Standard
Comment:
Correcting discrepancies:
If conflicts between clearances or technical problems arise, Then inform the Clearance Authority.
The Clearance Authority (SRO) is informed that the tag for valve P47-F295B was initially placed on the wrong valve (P42-F295B).
Does not remove the incorrectly placed tag on valve P42-F295B, reposition valve P42-F295B to open, close correct valve P47-F295B, and tag valve P47-F295B control switch.
Note: The Candidate is not allowed to correct the clearance discrepancy (as discussed in NOP-OP-1001). The clearance will have to be revised.
Terminating Cue:
When the Candidate completes the independent verification for the red tag for valve P27-F290B control switch and determines that the red tag for valve P27-F290B control switch was improperly placed and informs the Clearance Authority, the evaluation for this JPM is complete.
NUREG 1021, Revision 8, Supplement I
Form ES-C-I Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement I Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC RO A.2 Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 6 of 6 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:
The plant is operating in MODE 1. The chilled water coils for Controlled Access and Misc. Equipment Areas HVAC System (CA&MEA) Supply Plenum M21-BOOIB has a 2 gpm leak. The chilled water coils are being isolated and tagged per Clearance PY I -P47-0027. The initial placement of the Control Room tags has been completed.
INITIATING CUE:
The Unit Supervisor directs you, as a Reactor Operator, to perform the independent verification of the Control Room tag placement for Clearance PY 1 -P47-0027 in accordance with NOP-OP-1001.
NUREG 1021, Revision 8, Supplement I
PY1-P47-0027 Perry Tagout PY-CYC-009 Equipment ID:
0M21 B0001 B
==
Description:==
Isolate Cooling Coils for Flushing and Leak Repairs Reason:
Results in Loss of P47 Chilled Water flow to CAA Cooling Coil 'B' and Computer Room Cooling Coil 'B' Hazards:
-lectrical Hot Work
-:ire Impairment (PAP-1914)
-CO Tracking (OAI-1 701)
-CO No.
ndependent Verification (PAP-0205)
DEO remporary Shielding (RPI-0122) 3hielding Req. No.
Temp. Mod or INFO Tags (PAP-1402/1404)
Tag No.
Other _
Number Equipment ID 03-000222-000 0M21BOO01B Status Irepared Description LEAN AND INSPECT COILS. REPAIR COIL LEAKAGE.
Description
ýrepared By User Apley, Marc Verification Date 01/14/2003 17:28 Reviewed eviewed By Apley, Marc 01/14/2003 17:32 Second Review Second Review By N/A 01/14/2003 17:32 Approved Approved By TESTER Baker 01/24/2002 20:32 Issued for Work Restoration Review Removal Authorized Clearance Closed Issued for Work By Restoration Review By Removal Authorized By Clearance Closed By 00/00/0000 00:00 00/00/0000 00:00 00/00/0000 00:00 01/24/2003 09:21
' Page I of I AINO asn DNINIVUI. dO0 Isolating Flow per Request - Suggest Shutdown of M21 B and M27 B HVAC Trains due to loss of Chilled Water Flow Work Required prior to Completion:
Attribute Attribute Description Value I
I 00/00/0000 00:00
Tag Hang List for PY1-P47-0027 Perry Tagout PY-CYC-009
, Equipment ID i
Equipment Equipment I
Description Location 60P47F0290B C/S ICCCW OUT FROM CAA CLG J0H13P0904 COIL B C/S 0P47F0290B DISC
-...... CCCW OUT FROM CAA CLG 0-CC-620-A/03 EF1CO9 - X COIL B DISC
,0P47F0290B CCCW OUT FROM CAA CLG 0-CC-679-B/03 COIL B 0)P47F0295B C/S CCCW IN TO CPA CLG COIL 0H13P0904 B C/S
'0P47F0295B DISC CCCW IN TO CAA CLG COIL O-CC-620-A/03 EFIC09-Y B DISC 0P47F0295B CCCW IN TO CPA CLG COIL O-CC-679-8/03 B
01/24/2003 09:21 Page 1 of 1 Notes FOR TRAINi USE ONLY
q~a, inmmw 41 0"lo
-:
,,d4'Atr4,.4h.
cg 1 Perry Tagout Tagout Red Danger Tag Tag Serial Number:
PY-CYC-009-05849 0P47F0290B CCCW OUT FROM CAA CLG COIL B O-CC-679-B/03 Position: TAGGED Perry Tagout Tagout Red Danger Tag Tag Serial Number:
PY-CYC-009-05852 0P47F0296B CCCW IN TO CAA CLG COIL B O-CC-679-B/03 Position: TAGGED DANGER Perry Tagout Tagout Red Danger Tag Tag Serial Number:
PY.CYC-009-05848 0P47F0290B DISC CCCW OUT FROM CAA CLG COIL B DISC O-CC-620-A103 EF1C09-X Position: OFF Perry Tagout Tagout Red Danger Tag Tag Serial Number:
PY-CYC-009-05851 0P47F0296B DISC CCCW IN TO CAA CLG COIL B DISC O-CC-620-A/03 EFIC09 - Y Position: OFF I
41-7 rx
.Ik.L g*
Iw' "
A DO NOT OPERATE SilDA1*NGER DONTOPRT
NUCLEAR OPERATING ADMINISTRATIVE PROCEDURE Procedure Number:
NOP-OP-1001
Title:
Use Category:
Clearance/Tagging Program General Skill Reference Revision:
Page 0
11 of 43 4.3.9 Grounds
- 1.
IF a grounding device is to be installed, THEN it shall be tracked by one of the following:
Clearance (tagged point)
Clearance (non-tagged point)
- 2.
IF a bus is to be grounded, THEN all electrical feeds to that bus shall be tagged prior to grounding.
4.3.10 Mechanical Systems
- 1.
IF preparing a Clearance on a mechanical system required to be depressurized or drained, THEN identify the method for depressurizing or draining.
- 2.
IF it is necessary to use a check valve as a Clearance boundary, THEN it shall be designated as an Exceptional Clearance.
- 3.
IF tagging a heat exchanger, THEN consider isolating, venting and tagging both process sides prior to opening for maintenance.
4.3.11 Manual Valve Positioning as Clearance Boundaries
- 1.
IF tagging manual valves, which have remote operators (reach rods), THEN only the remote operating handle is normally tagged for ALARA reasons.
4.3.12 Motor Operated Valves (MOV's) as Clearance Boundaries
- 1.
IF tagging motor operated valves as isolation points, THEN the following apply:
The tag for either the control switch (preferably) or the handwheel shall provide the required valve position.
IF the control panel switch is tagged with the required valve position (e.g., open or close), THEN the tag on the valve handwheel should not designate a specific position.
Verify position of the valve using one of the following:
Remote electrical position indicator Process parameters
NUCLEAR OPERATING ADMINISTRATIVE PROCEDURE Procedure Number:
NOP-OP-1001
Title:
Use Category:
Clearance/Tagging Program General Skill Reference Revision:
Page 1
0 12 of 43 Local position indication Manually verify valve positioned (least preferred)
The normal sequence of applying tags is:
- 1)
Position the component using its control switch.
- 2)
Hang tag with the required position (i.e., open or closed), on the control panel switch.
- 3)
Verify valve position by control panel indication.
- 4)
Tag open motor breakers.
- 5)
Tag local control switches.
- 6)
Tag valve handwheel.
4.3.13 Pneumatic Valves as Clearance Boundaries
- 1.
Fail closed pneumatic valves used as tagging boundaries shall be tagged as follows:
Remove the motive force by either isolating the air supply (if desired vent off the actuator or regulator) or deenergizing the air solenoid valve.
0 Place a Danger Tag on the actuator.
- 2.
IF fail open pneumatic valves are capable of being blocked closed by a manual actuator or a stem collar locking device, THEN they may be used for tagging boundaries.
WARNING Some types of air operated valves will open due to downstream system pressure. When required as a boundary they must either be blocked closed or downstream pressure prevented from exceeding the lift pressure.
NUCLEAR OPERATING ADMINISTRATIVE PROCEDURE Procedure Number:
NOP-OP-1001
Title:
Use Category:
Clearance/Tagging Program General Skill Reference Revision:
Page 0
17 of 43 4.7 Work Group Review 4.7.1 The Clearance Holder or designee shall review the information on the following screens:
0 Clearance Detail 0
Clearance Tags 0
Work Documents 4.7.2 Verify the Clearance provides the following:
Adequate boundaries The correct job information IF any hazards exist that the Clearance does not provide protection from, THEN verify it is identified as an Exceptional Clearance (Refer to Attachment 1 for examples of when a Clearance shall be identified as an Exceptional Clearance).
4.7.3 IF the Clearance requires any changes, THEN inform the Clearance Preparer/Reviewer and resolve.
4.8 Authorization 4.8.1 The Clearance Authority shall evaluate the Clearance and current plant status to verify:
0 The notes and cautions are understood.
No adverse impact on current plant status will occur.
Required redundant equipment is verified operable.
Refer to the Clearance Attributes screen and document initiation of any required items.
0 The sequence for placement is correct.
0 Are there potential hazards during hanging.
4.8.2 Approve the Clearance.
4.9 Tag Placement 4.9.1 General Requirements Review the Clearance Cover Sheet, Tag Hang list, and Tags for applicable directions prior to positioning components.
NUCLEAR OPERATING ADMINISTRATIVE PROCEDURE Procedure Number:
NOP-OP-1001
Title:
Use Category:
Clearance/Tagging Program General Skill Reference Revision:
Page 1_0 1
18 of 43 0
Position components and place tags in the specified sequence.
Component positions may be verified by utilizing the position on danger tags currently hung.
4.9.2 Correcting Discrepancies Minor discrepancies such as typos, changes in the tag placement order, and functionally equivalent terms (Valve vice VLV, etc.) may be clarified under verbal direction from the Clearance Authority.
IF conflicts between Clearances or technical problems arise, THEN inform the Clearance Authority.
The Clearance Authority shall ensure all discrepancies are resolved with the work group.
IF any changes to the Clearance are required, THEN refer to Clearance Revision, Section 4.19.
4.9.3 Hang tags as follows:
- 1.
For each tag, perform the following:
- a.
Confirm that the proper component is selected by comparing the information on:
The tag The Clearance In-plant label Abbreviated terms need not match exactly.
- b.
Verify the component in the specified position.
- c.
Place the tag on the component in a secure manner and visible location.
- 2.
Update the computer tagging system for the placement of tags in the field.
- 3.
Return the Clearance to the Clearance Authority or independent verifier when completed.
NUCLEAR OPERATING ADMINISTRATIVE PROCEDURE Procedure Number:
NOP-OP-1001
Title:
Use Category:
Clearance/Tagging Program General Skill Reference Revision:
Page 1
0 19 of 43 4.10 Independent Verification of Tag Placement 4.10.1 General Requirements 0
Independent verification may be waived by the Clearance Authority based on ALARA concerns.
Independent verification shall be conducted in accordance with Station Procedures.
4.10.2 Verify tags hung as follows:
- 1.
For each tag, perform the following:
- a.
Confirm that the proper component was selected by comparing the information on the tag, the Clearance and in-plant label. Abbreviated terms need not match exactly.
- b.
Confirm the component in the specified position.
- c.
Confirm the tag is securely fastened to the component in a visible location.
- 2.
Update the computer tagging system for the placement of tags in the field.
- 3.
Return the Clearance to the Clearance Authority.
4.11 Clearance Activation 4.11.1 The Clearance Authority shall verify:
All items required on the Clearance Attributes screen are performed.
0 All tag placements have been checked as required.
All required plant conditions have been established.
4.11.2 IF any new hazards (i.e., excess boundary leakage) are discovered or problems occur during hanging of the Clearance, THEN inform the work group.
)
P47 - Rev. 5
.25
TI 11
[n 131
=
Ili N
.I.
U.
YLOBLOD II I
7 I
rj AUOIITATV
Appendix C Job Performance Measure Form ES-C-1 Worksheet Perry Task No:
299-910-03-01 Simulated Performance Classroom Determine Dress Out Requirements for a Contaminated Area JPM No: 2003 NRC RO/SRO A.3 NRC Examiner:
N/A Date:
Actual Performance Simulator Plant Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
Candidate determines that he must wear Full Protective Clothing and a Discrete Particle Suit in order to enter the RWCU Heat Exchanger Room.
Radiation Work Permit (marked up copy)
Survey Map (marked up copy)
HPI-C0005, Rev. 7 PAP-0 114, Rev. 4 NO 15 minutes READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant is operating at 100% power. There has been an increasing temperature trend in the Reactor Water Cleanup (RWCU) System Heat Exchanger Room over the past 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Operations Management has determined that entry into the room is required in order to confirm if any leakage exists, and to quantify the amount.
As a member of the Relief Crew, you have been assigned to enter the room to perform this activity.
Determine the protective clothing requirements for you to enter the RWCU Heat Exchanger Room.
NUREG 1021, Revision 8, Supplement I Facility:
Task
Title:
K/A
Reference:
2.3.4 Examinee
Facility Evaluator:
Method of testing
Perry Nuclear Power Plant RADIATION WORK PERMIT (RWP)
For Training Purposes Only Location: Containment 652' RWP Number: 03XXXX
==
Description:==
Leakage Inspection in RWCU Heat Exchanger Room This SRWP AUTHORIZES entry into the following areas:
IlX LHRAs Xl HRAs Xl RAs Xi ARAs IXl CAs IXl DPZs MWO Number: N/A
Contact:
- 0. P. Raitor Contact Phone Number: 5932 Work Code: OP Completion Date: 01-JAN-2004 Person-mrem Estimate: 0.5 Person-Hrs Estimate: 4 WORK AREA SURVEY Dose Rates: 3 - 30,000 mrem/hr.
Contamination Levels: <1000 - 150,000 dpm/100 cm2 DOSIMETRY REQUIREMENTS M-G DRD PEA-100 Telemetry TILD PROTECTIVE CLOTHING CA FULL PROTECTIVE CLOTHING DPZ Discrete Particle Suit RESPIRATORY PROTECTION EQUIPMENT Respirator Type: None WORKER INSTRUCTIONS
- 1.
A documented ALARA brief is required when entering the RWCU Heat Exchanger Room.
- 2. Locked High Radiation Area Door Guards are required for entries into Locked High Radiation AreasI ALARA NOTES
- 1. PEA-100s and Telemetry shall be used per direction of RP Supervision.
- 2.
MG Setpoints should be evaluated for each entry and changes documented in the Narrative Log.
GENERAL RP NOTES PREPARED BY:
Date:
v RP PLANNING
,j Date: -
y RP SUPERVISOR:
O Date:
PHP APPROVAL:
0/,
Date:
WORK SUPERVISOR: 61ý7 Date:
TERMINATED BY:
Date:
For Training Purposes Only A B-DAC calculation is required for ARA >1.0 DAC CONTINUOUS Radiation Protection Coverage is required for entries into work areas > or = 1000 mRem/hr.
A Radiation Protection Brief is required for all entries on this RWP.
MG Setpoints for dose rate are not to be set above 5000 mRem/hr.
RWP NUMBER RADIOLOGICAL SURVEY REPORT o1s-K-.,<y BUILDING CTMT SURVEY NUMBER Y Y, y._ x )<
ELEVATION AREA / ROOM / SYSTEM 652' Containment RWCU Heat Exchar PURPOSE AIR SAMPLE #1 p
N/A uCi/cc C
ON/A AIR SAMPLE #2 N/A uCi/cc p
N/A uCi/cc C
ON/A N/A uCi/cc all dose rates are in mrem/hr @ waist level unless otherwise noted.
All smears are < 1000 dpm/100 cm 2 p,y unless otherwise noted.
Legend:
O - Air Sample,O-Smear XXXXX - Boundary, ### - Direct Frisk
- 1-Contact/30cm Bkgd - Background MDA-Minimum Detectable Activity NDB-No Detectable Beta SOP - Step Off Pad CA - Contamination Area DPZ - Discrete Particle Zone ARA - Airborne Radioactivity Area RA - Radiation Area NRA - Neutron Radiation Area HRA - High Radiation Area LHRA - Locked High Radiation Area VHRA - Very High Radiation Area N - Neutronm - Alpha, B-Betay - Gamma Smear Smear dpm/1 00cn*
Location B-Y 2i 5oe
- /
2-
'50P ty.
3I FLooQ
?oK I0 FLUOIZ 1OV-__
INSTRUMENTS USED SURVEY BY MODEL INSTRUMENT NUMBER CAL DUE DATE Ný,ME (Print)
SIDEDAT
-rC.TCI-g&T-LQ L-7 DD V 0-Z A, L-7 X-LY M/DY/1 REVIEWED BY
-'JI L7 -r-y-. K)
S*-
IS GAME (PT-t)
T.U..
DAT N /~ P,-'4~)-
/'A.4gz1jSC4 I
,T&/
I t- ý-=
A, V-_ -T"' S F F-,-- --r 1 0 'j
Appendix C Page 2 of 4 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Performance Step: 1 Standard:
Comment:
Performance Step: 2 Standard:
Comment:
Performance Step: 3 Standard:
Comment:
Locate the correct Radiation Work Permit (RWP) in order to determine the Radiation Protection Program requirements for the assigned task.
Locates the Specific RWP that allows entry into the RWCU Heat Exchanger Room for Leakage Inspection.
Cue: Provide Candidate with marked up RWP after he either shows or states that the RWPs are kept at the RRA entrance.
Locate the correct Survey Map in order to determine the contamination levels inside the RWCU Heat Exchanger Room.
Locates the Survey Map for the RWCU Heat Exchanger Room.
Cue: Provide Candidate with marked up Survey Map after he either shows or states that the Survey Maps are kept at the RRA entrance.
Determine the protective clothing requirements for the assigned job task.
Evaluates RWP and associated Survey Map, and determines that he must wear Full Protective Clothing and a Discrete Particle Suit in order to enter the RWCU Heat Exchanger Room.
Terminating Cue:
When the Candidate has determined that he must wear Full Protective Clothing and a Discrete Particle Suit, the evaluation for this JPM is complete.
NUREG 1021, Revision 8, Supplement I
Form ES-C-I Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement I Appendix C Page 3 of 4 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC RO/SRO A.3 Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 4 of 4 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:
INITIATING CUE:
The plant is operating at 100% power. There has been an increasing temperature trend in the Reactor Water Cleanup (RWCU) System Heat Exchanger Room over the past 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Operations Management has determined that entry into the room is required in order to confirm if any leakage exists, and to quantify the amount.
As a member of the Relief Crew, you have been assigned to enter the room to perform this activity.
Determine the protective clothing requirements for you to enter the RWCU Heat Exchanger Room.
NUREG 1021, Revision 8, Supplement I
Appendix C Job Performance Measure Form ES-C-I Worksheet Perry Perform Site Accountability Actions for Control Room Staff Task No:
JPM No:
N/A 2003 NRC RO A.4 NRC Examiner:
N/A Date:
Actual Performance Simulator Plant Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
Candidate obtains temporary relief as the Licensed Operator 'At the Controls' and then locates the Emergency Personnel Accountability card reader located in either the Unit I or 2 Control Room and simulates inserting his keycard into the card reader.
EPI-B0005, Rev 6, PIC 7 PAP-0126, Rev 2, PLC 2 EPI-B0005, Rev 6, PIC 7 PAP-0126, Rev 2, PlC 2 NO 5 minutes READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant is in MODE 3. You are the Licensed Operator 'At the Controls' when a Site Area Emergency is announced. In addition, the Emergency Coordinator has announced that site accountability is now in effect.
The Shift Manager directs you, as a member of the Control Room staff, to perform your action(s) for site accountability.
NUREG 1021, Revision 8, Supplement I Facility:
Task
Title:
K/A
Reference:
2.4.39 Examinee:
Facility Evaluator:
Method of testing Simulated Performance Classroom
Appendix C Page 2 of 5 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: The Evaluator will role-play as another licensed Reactor Operator for the Candidate.
Note: The Candidate may explain that he can give his keycard to another member of his crew who will then insert his keycard into the designated accountability card reader for him. If this occurs, then cue the Candidate that he is required to demonstrate the action(s) himself.
Performance Step:
The Licensed Operator 'At the Controls' may be temporarily 6.8.3.1 relieved for personal reasons by another licensed operator as long as a verbal turnover of applicable items below has occurred:
- a.
The status of work in progress, with emphasis on unit/personnel safety items and safety related systems.
- b. Any changes in the Unit status since shift turnover.
- c.
The status of testing and evolutions that has changed since shift turnover.
- d. Any alarms or equipment out-of-service that has changed since shift turnover.
Standard:
Obtains temporary relief from another licensed Reactor Operator in order to leave the Horseshoe Area.
Comment:
Cue: As another Reactor Operator on his crew, inform the Candidate that he is temporarily relieved.
Note: The Unit I Control Room Emergency Personnel Accountability card reader is located outside of the Horseshoe Area near the main entrance to the Unit I Control Room.
Note: Per PAP-0 126, Step 6.3.1, the Licensed Operator 'At the Controls' shall not leave the Horseshoe Area until relieved by another licensed operator or senior reactor operator, except as specified in 6.3.2.
Note: PAP-0 126, Step 6.3.2 does not allow the Licensed Operator
'At the Controls' to momentarily leave the Horseshoe Area without relief for the sole purpose of performing site accountability actions.
Note: This Step is not critical. If the Candidate does not obtain temporary relief, this would only be a violation of plant procedure (PAP-0126).
NUREG 1021, Revision 8, Supplement I
Appendix C Performance Step:
5.6.1.1 Standard:
Comment:
Page 3 of 5 Form ES-C-I PERFORMANCE INFORMATION Utilize Card Readers in either Unit I or 2 Control Rooms for accountability purposes.
Locates the Emergency Personnel Accountability card reader in either the Unit I or 2 Control Room.
Inserts (simulates) and then withdraws keycard into the designated accountability card reader.
Cue: The red light has blinked on the Accountability card reader.
Note: Control Room staff shall respond as outlined in Control Room Staff and General Site Accountability Actions (EPI-B0005, ).
Terminating Cue:
When the Candidate completes his actions to demonstrate Site Accountability, the evaluation for this JPM is complete.
NUREG 1021, Revision 8, Supplement 1 1
Form ES-C-I Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement I Appendix C Page 4 of 5 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC RO A.4 Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 5 of 5 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:
The plant is in MODE 3. You are the Licensed Operator 'At the Controls' when a Site Area Emergency is announced. In addition, the Emergency Coordinator has announced that site accountability is now in effect.
INITIATING CUE:
The Shift Manager directs you, as a member of the Control Room staff, to perform your action(s) for site accountability.
NUREG 1021, Revision 8, Supplement I
PAP-0126 Page:
5 Rev.:
2 / C-2 6.1.3 In the event that the Shift Manager (SM) is incapacitated, the on shift Unit Supervisor (US) assumes the SM function.
In the extreme event that the US is incapacitated concurrently with the SM, then the senior on shift licensed Reactor Operator (RO) assumes the SM function.
In either case, action shall be taken immediately to inform plant management, Operations Manager or above.
Actions shall also be taken immediately to obtain replacement personnel.
<P00054>
6.1.4 An additional SRO or SRO Limited to Fuel Handling shall supervise core alterations and shall have no other concurrent duties or responsibilities.
6.1.5 The Operations Section will normally have a minimum of five operating shifts, plus two relief operators.
During each shift cycle, Operations Section personnel assigned to a shift should be available for off-the-job retraining for a period of up to one week.
<S00269>
6.2 Fire Brigade Staffing
<F01401>
6.2.1 The site Fire Brigade consists of a Fire Brigade Leader and four members as described in
<PAP-1910>, Fire Protection Program.
6.2.2 Fire brigade composition may be one less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of members, provided immediate action is taken to restore the fire brigade to minimum requirements.
This does not mean that a shift position can be unmanned upon shift change due to an on-coming member being late or absent.
6.2.3 Fire brigade members shall have no duties during a fire except those directly related to fire-fighting.
6.3 Control Room Staffing
<F00442>
6.3.1 One licensed operator is required to be at the controls in the Horseshoe Area while fuel is in the vessel.
The licensed operator at the controls shall not leave the Horseshoe Area until relieved by another licensed operator or senior licensed operator, except as specified in 6.3.2.
6.3.2 The licensed operator at the controls may momentarily leave the Horseshoe Area without relief in the event of an emergency affecting the safety of operation in order to verify receipt of an annunciator or to initiate corrective actions on back panels located within the Operations Area.
6.3.3 In addition to the requirement of 6.3.1, one senior licensed operator shall be in the Control Room at all times while the reactor is in MODE 1, 2, or 3.
PAP-0126 Page:
11 Rev.:
2 6.8.3 Relief of the Licensed Operator "At the Controls" NOTE:
The Unit Supervisor may relieve the Licensed Operator at the controls.
If the plant is in Mode 1, 2 or 3, another SRO licensed individual is required to be present in the Control Room to assume the duties of the Unit Supervisor.
- 1.
The Licensed Operator at the controls may be temporarily relieved for personal reasons by another licensed operator as long as a verbal turnover of applicable items below has occurred:
- a.
The status of work in progress, with emphasis on unit/personnel safety items and safety related systems.
- b.
Any changes in the Unit status since shift turnover.
- c.
The status of testing and evolutions that has changed since shift turnover.
- d.
Any alarms or equipment out-of-service that has changed since shift turnover.
- 2.
The Licensed Operator at the controls may be relieved for an extended period provided the requirements of 6.8.1 and 6.8.2 are met.
6.9 Operations Foreman Relief 6.9.1 Operations Foreman Relief Turnover Checklist (Attachment 4),
or similar form, is to be signed by both the on-coming and off-going Operations Foreman.
6.9.2 Operations Foreman Relief/Turnover Instructions:
- 1.
Before being relieved, the Off-Going Operations Foreman will check the appropriate boxes to indicate that the following Plant Equipment Rounds have been approved or reviewed and initialed:
- a.
Outside
- b.
- c.
Nuclear Island (RRA/OUT)
- d.
Aux Boiler
- e.
Radwaste
- 2.
Just prior to being relieved, the off-going Operations Foreman will verify that all key rings are accounted for and are intact (welded) and check the appropriate box on the checklist.
Rev.:
2 I 1 CONTROL ROOM AREAS Page:
34 -
LAST I 1 PAP-012 6 4;?44
44444 4
4
+444 44
444 44.4444 4
>44 4
4>.>
444444
>
44 444444.
4444444444 Operations
Area 4
- j.
4.Z44444. 4 S4>
>>.)
4 4.4. 44444 A
A 444444 4.
4444k 44
4.4444.4444.4>4.
444 44444<4444
- 4.
4 44 44
4>
444444 444
- 44.
>4.
- 4.
44444 44
t4.
4
44 4
44
444 4.4444444 4
444444 44 4444 44 4>
44
EPI-B5 Page:
8 Rev.:
6 / C-4*
5.6 Emergency Response Organization (ERO)
Personnel Response 5.6.1 Control Room/Shift Staffing shall:
- 1.
Respond as outlined in Control Room Shift Staff and General Site Accountability actions (Attachment 3, Figure 1).
5.6.2 Technical Support Center (TSC) Staff shall:
- 1.
Use the TSC Hallway "accountability" card reader upon entering the TSC for accountability purposes.
- 2.
Log into and out of the TSC using the hallway Staffing Board, indicating location/destination upon leaving facility.
- 3.
Respond as outlined in TSC Staff Accountability Actions (Attachment 4, Figure 2),
when personnel accountability is initiated.
5.6.3 Operations Support Center (OSC)
Staff shall:
- 1.
Use the TSC Hallway "accountability" card reader upon responding to the OSC.
- 2.
Respond as outlined in OSC Staff Accountability Actions (Attachment 5, Figure 3),
when personnel accountability is initiated.
5.6.4 Emergency Operations Facility (EOF) Staff shall:
- 1.
Respond as outlined in EOF Staff Accountability Actions (Attachment 6, Figure 4).
5.6.5 Joint Public Information Center (JPIC) Staff shall:
- 1.
Respond as outlined in Attachment 3, Figure 1.
5.6.6 Plant management located within the Protected Area upon initiation of personnel accountability, who wish to remain onsite and are not required to staff an emergency facility, shall promptly utilize an accountability card reader in the Control Room or TSC to account for their presence onsite.
5.7 Non-ERO Personnel Response 5.7.1 Plant Personnel not assigned to ERO shall:
- 1.
Exit the Protected Area and Perry Plant Site using normal exiting procedures once accountability announcement is heard over the Plant PA, Exclusion Area Paging System or via another employee.
EPI-B5 Page:
4 Rev.:
6 / C-7 5.1.4 If the offsite monitoring/decontamination centers are being activated, direct the Administrative Assistant to notify the NRC, State of Ohio, and local counties on the next Follow-up Notification form (PNPP No.
7795) per <EPI-Bl>.
5.2 Shift Manager shall:
5.2.1 Perform the actions outlined in Section 5.1 if the TSC is not yet operational, and utilize TSC staff as they become available to accomplish the actions listed in Sections 5.2 thru 5.4.
5.2.2 Activate the applicable pre-recorded "Emergency" message (Attachment 1) on the Exclusion Area Paging (R53)
System every five (5) minutes until accountability is completed.
- 1.
Provide additional guidance, if required, to personnel evacuating the site, using the R53 PA feature, for the following:
designated evacuation routes due to a security contingency use of offsite monitoring and decontamination centers 5.2.3 Direct all Control Room staff and Plant Operators (POs) located in the Unit 2 Control Room, to promptly use the designated accountability card readers.
Plant management who are not currently staffing an emergency facility may utilize a Control Room accountability card reader in lieu of evacuation.
5.2.4 If not yet relocated to the OSC, verify the location and status of POs presently dispatched in-plant.
After the OSC is operational, shift personnel such as the Shift I&C/HP/Chemistry Technicians and Plant Operators (POs) will be accounted for through the OSC.
- 1.
Complete Personnel Accountability Checklist (PNPP No.
7957, )
to account for on-shift POs outside the Control Room, and forward to the CAS via the Secondary Alarm Station (SAS).
<P00073>
5.2.5 Obtain the number of unaccounted for people within the Protected Area from the CAS no later than 30 minutes after accountability was initiated.
Page:
12 / C-7 CONTROL ROOM/SHIFT STAFF & GENERAL SITE ACCOUNTABILITY GUIDELINES EPI-B5 ACCOUNTABILITY INITIATED Yes REPORT TO OSC FOR ES ACCOUNTABILITY PURPOSES NOTES: (1) Plant Management may utilize accountability card readers in the Control Room & TSC in lieu of Evacuating the Protected Area.
(2) Offsite Monitoring/Decon. Centers located at:
Mentor High School Football Stadium (Lake County)
Saybrook Elementary School (Ashtabula County)
Hambden Fire Department (Geauga County)
NF972 SHIFT MANAGER MUST VERIFY STATUS OF POs OUTSIDE CONTROL ROOM, & REPORT NAMES & BADGE NO. OF INDIVIDUALS TO THE SECONDARY ALARM STATION (SAS).
EPI-B5 Rev. :
6
Appendix C Job Performance Measure Form ES-C-I Worksheet Method of testing Simulated Performance Classroom Perry Evaluate Proposed Work Schedule Against Established Overtime Guidelines Task No:
JPM No:
343-710-03-02 299-892-03-01 2003 NRC SRO A. L.a NRC Examiner:
N/A Date:
Actual Performance Simulator Plant Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
Candidate determines that Fred can work the proposed overtime without additional authorization and either Bill or John cannot work the proposed overtime without additional authorization.
Candidate completes a Technical Specification Overtime Deviation Request for either Bill or John.
NOP-LP-1002, Rev 0 Access to Computer Workstation with Lotus Notes software (or hardcopy of Technical Specification Overtime Deviation Request Form 7699)
NOP-LP-1002, Rev 0 NO 15 minutes Facility:
Task
Title:
K/A
Reference:
2.1.2 Examinee
Facility Evaluator:
Appendix C Job Performance Measure Form ES-C-I Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
The plant is operating at 100% power. You are the Unit Supervisor for your crew. Two (2) Reactor Operators from your crew are needed to work a 12-hour overtime assignment on Sunday (2/10) firom 0800 to 2000.
It is not expected that any of the Reactor Operators who work on Sunday will work the following Monday.
Listed below is the current work week schedule for the three (3)
Reactor Operators on your crew.
Sun Mon Tue Wed Thu Fri Sat 2/3 2/4 2/5 2/6 2/7 2/8 2/9 Bill Off 08-20 08-20 08-16 08-16 08-20 08-20 Fred Off John Off 08-16 08-20 08-20 08-16 08-16 08-16 08-20 08-16 08-20 08-20 off 08-24 Note: All work hours shown exclude turnover time.
Initiating Cue:
Determine which Reactor Operator(s) can work the proposed overtime without any additional authorization and complete any form(s) required in order to fill the two (2) overtime assignments.
4ri~werke /
- e tec-6ý-anr'c Ve TECHNICAL SPECIFICATION OVERTIME OEPT/SEC7IION DEVIATION REQUEST PNPPD/POS - Perry Operations Section PNPP No. 7699 Rev. 09/27/00 DEVIATION CODES:
1 - More than 16 hrs straight 4 - More than 72 hrs in 7 days 2 - More than 16 hrs in 24 hrs 5 - Less than 8 hr break between assignments 3 - More than 24 hrs in 48 hrs (Code 1-4 exclude shift turnover time)
Main Information :
- 1. Bill SSN:xxx-xx-xxxx CODE:4 START DATE:02/10/2003 END DATE:02/10/2003 REASON: Work additional hours due to flu epidemic.
- 2. John SSN:yyy-yy-yyyy CODE:3 START DATE:02/10/2003 END DATE:02/10/2003 REASON: Work additional hours due to flu epidemic.
Requestor's Comments:
Director's Comments:
Requestor:
Signature C,,,-61ca t JT6erz-1 General Manager/Director Approval:
/
Date Na-,ýe.- (f a 11 d, -C/,( e - 1, --, 6, " /,v ee Lt C
- e 0 d
-,e, 0
" k4v /a -e,7 e t 4, -.ý,
,4-0
-44 JOi e 1 --6 r C,- tlIY, ll' T.O-h /Zv-11 6 6`7&,
'A1)
C,-,' A
., ['*0 Answer Key - Hard Copy DEPT/SECTION TECHNICAL SPECIFICATION OVERTIME DEVIATION REQUEST PNPPD/OPS PNPP No. 7699 Rev. 9/27/00 DEVIATION CODES:
I - MORE THAN 16 HRS STRAIGHT 3 - MORE THAN 24 HRS IN 48 HRS 5 - LESS THAN 8 HR BREAK BETWEEN ASSIGNMENTS 2-MORE THAN 16 HRS IN 24 HRS 4-MORE THAN 72 HRS IN 7 DAYS (CODES 01 -04 EXCLUDE SHIFT TURNOVER TIME)
NAME SOCIAL SECURITY CODE START END DATE REASON No.
DATE Reason shall include as a minimum: 1) the specific work to be performed, 2) why other individuals cannot not be used and 3) why the work cannot be rescheduled. General statements such as "outage support" and "to meet the schedule" are not acceptable.
Bill xxx-xx-xxxx 4
2/10/2003 1 2110/2003 Work additional hours due to flu epidemic.
I John I
yyy-yy-yyyy I
1 3
2/10/2003 211012003 Work additional hours due to flu epidemic.
I I
I I
I I
I I
I I
I Supervisors requesting an overtime deviation are signifying that they are familiar with the condition of the individual involved and that the individual's condition is such that the additional overtime hours can be safely worked.
REQUESTED BY GENERAL MANAGER/DIRECTOR APPROVAL Signature Date Section Signature Date I
I I
I I
I
Appendix C Page 4 of 12 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: This JPM is intended to be performed using the electronic database version of the Technical Specification Overtime Deviation Request (PNPP No. 7699) located in Lotus Notes. However, if the Candidate desires, he can complete a hardcopy of the form.
Note: Ensure a copy of NOP-LP-1002, Fitness For Duty Program, is available for use by the Candidate.
Note: Each Reactor Operator (Bill, Fred, and John) can be evaluated in any order and will be documented in separate Performance Steps.
Appendix C Page 5 of 12 Form ES-C-I PERFORMANCE INFORMATION Note: The following Performance Steps are for Bill.
Performance Step:
The following guidelines are applicable to personnel performing 4.14.3 safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel).
Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods. (Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5. The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
Standard:
Determines that Bill will exceed Guideline #2 for his proposed work week schedule (an individual shall not work more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period).
Determines that Bill cannot work the proposed overtime without additional authorization (a Technical Specification Overtime Deviation Request is requested by his Supervisor and authorized by the Plant Manager or his designees).
Comment:
Appendix C Page 6 of 12 Form ES-C-I PERFORMANCE INFORMATION Note: The following Performance Step is only critical if the Candidate determines that Bill (not John) will be designated as the second Reactor Operator to work the proposed overtime on Sunday.
Note: Provide the Candidate with the following directions before he prepares the electronic version of the Technical Specification Overtime Deviation Request:
- 1. Use a fictitious Social Security Number for Bill.
- 2. Do not submit the completed Technical Specification Overtime Deviation Request for approval.
- 3. Print a copy of the completed Technical Specification Overtime Deviation Request.
- 4. Closeout the completed Technical Specification Overtime Deviation Request without saving the request.
- 5. Exit the Lotus Notes electronic database.
Performance Step:
Deviations from the overtime guidelines are normally requested by 4.14.5 the immediate supervisor and authorized by the Plant Manager or his designees using the Technical Specification Overtime Deviation Request (PNPP No. 7699).
Standard:
Using Lotus Notes, accesses the Overtime Deviation electronic database from the Perry Main menu on PY-NOTESO 1.
Properly completes the Technical Specification Overtime Deviation Request.
The following items are critical: Name (Bill), Code (4).
See attached Technical Specification Overtime Deviation Request Answer Key.
Comment:
Note: The 'Start Date' and 'End Date' blocks are not critical items because they are used for administrative purposes only.
As a minimum, the dates should both be 2/10/03, but they could include the entire time interval of the hours worked or limit exceeded.
Note: If the electronic database version of the form is not available, then provide the Candidate with a hardcopy of PNPP No. 7699.
Appendix C Page 7 of 12 Form ES-C-I PERFORMANCE INFORMATION Note: The following Performance Step is for Fred.
Performance Step:
The following guidelines are applicable to personnel performing 4.14.3 safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel).
Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods. (Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5. The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
Standard:
Determines that Fred can work the proposed overtime without additional authorization.
Comment:
Note: Fred should be designated for I of the 2 proposed overtime assignments since he does not require additional authorization.
Appendix C Page 8 of 12 Form ES-C-1 PERFORMANCE INFORMATION Note: The following Performance Steps are for John.
Performance Step:
The following guidelines are applicable to personnel performing 4.14.3 safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel).
Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2. An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods. (Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5. The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
Standard:
Determines that John will exceed Guideline #2 for his proposed work week schedule (an individual shall not work more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period).)
Determines that John cannot work the proposed overtime without additional authorization (a Technical Specification Overtime Deviation Request is requested by his Supervisor and authorized by the Plant Manager or his designees).
Comment:
Appendix C Page 9 of 12 Form ES-C-1 PERFORMANCE INFORMATION Note: The following Performance Step is only critical if the Candidate determines that John (not Bill) will be designated as the second Reactor Operator to work the proposed overtime on Sunday.
Note: Provide the Candidate with the following directions before he prepares the electronic version of the Technical Specification Overtime Deviation Request:
- 1. Use a fictitious Social Security Number for John.
- 2. Do not submit the completed Technical Specification Overtime Deviation Request for approval.
- 3. Print a copy of the completed Technical Specification Overtime Deviation Request.
- 4. Closeout the completed Technical Specification Overtime Deviation Request without saving the request.
- 5. Exit the Lotus Notes electronic database.
Performance Step:
4.14.5 Standard:
Comment:
Deviations from the overtime guidelines are nonnally requested by the immediate supervisor and authorized by the Plant Manager or his designees using the Technical Specification Overtime Deviation Request (PNPP No. 7699).
Using Lotus Notes, accesses the Overtime Deviation electronic database from the Perry Main menu on PY-NOTESO 1.
Properly completes the Technical Specification Overtime Deviation Request.
0 The following items are critical: Name (John), Code (3).
See attached Technical Specification Overtime Deviation Request Answer Key.
Note: The 'Start Date' and 'End Date' blocks are not critical items because they are used for administrative purposes only.
As a minimum, the dates should both be 2/10/03, but they could include the entire time interval of the hours worked or limit exceeded.
Note: If the electronic database version of the form is not available, then provide the Candidate with a hardcopy of PNPP No. 7699.
Terminating Cue:
When the Candidate has determined that Fred can work the proposed overtime without additional authorization and either Bill or John cannot work the proposed overtime without additional authorization (and completes a Technical Specification Overtime Deviation Request for either Bill or John), the evaluation for this JPM is complete.
Appendix C Page 10 of 12 Form ES-C-1 Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
Appendix C Page 10 of 12 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC SRO A. 1.a Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 11 of 12 Form ES-C-I JPM CUE SHEET INITIAL CONDITIONS:
The plant is operating at 100% power. You are the Unit Supervisor for your crew. Two (2) Reactor Operators from your crew are needed to work a 12-hour overtime assignment on Sunday (2/10) from 0800 to 2000.
It is not expected that any of the Reactor Operators who work on Sunday will work the following Monday.
Listed below is the current work week schedule for the three (3) Reactor Operators on your crew.
Sun Mon Tue Wed Thu Fri Sat 2/3 2/4 2/5 2/6 2/7 2/8 2/9 Bill Off 08-20 08-20 08-16 08-16 Fred Off John Off 08-16 08-20 08-20 08-16 08-20 08-16 08-20 08-20 08-20 08-20 08-16 08-16 off 08-24 Note: All work hours shown exclude turnover time.
INITIATING CUE:
Determine which Reactor Operator(s) can work the proposed overtime without any additional authorization and complete any form(s) required in order to fill the two (2) overtime assignments.
DEPT/SECTION TECHNICAL SPECIFICATION OVERTIME DEVIATION REQUEST PNPP No. 7699 Rev. 9/27/00 DEVIATION CODES:
1 - MORE THAN 16 HRS STRAIGHT 3 - MORE THAN 24 HRS IN 48 HRS 5-LESS THAN 8 HR BREAK BETWEEN ASSIGNMENTS 2 - MORE THAN 16 HRS IN 24 HRS 4 - MORE THAN 72 HRS IN 7 DAYS (CODES 01 -04 EXCLUDE SHIFT TURNOVER TIME)
NAME SOCIAL SECURITY CODE START END DATE REASON No.
DATE Reason shall include as a minimum: 1) the specific work to be performed, 2) why other individuals cannot not be used and 3) why the work cannot be rescheduled. General statements such as "outage support" and "to meet the schedule" are not acceptable.
I I
I I
I I
I I
I I
I Supervisors requesting an overtime deviation are signifying that they are familiar with the condition of the individual involved and that the individual's condition is such that the additional overtime hours can be safely worked.
REQUESTED BY GENERAL MANAGER/DIRECTOR APPROVAL Signature Date Section Signature Date I
I I
I I
I I
I I
I I
I I
FENOC Procedure Number:
NOP-LP-1 002
Title:
Use Category:
Fitness For Duty Program General Skill Reference Revision:
Change:
Page 00 N/A 31 of 36 4.14 Overtime Guidelines 4.14.1 Plant staffing shall be such that adequate coverage of operating and key maintenance activities are maintained without the routine heavy use of overtime. The objective of the controls over the use of overtime is to assure that, to the extent practicable, personnel are not assigned to work activities while in a fatigued condition that could significantly reduce their mental alertness or their decision making capability and potentially create a Fitness for Duty concern.
4.14.2 The norm is for personnel work a 40-hour week while the plant is operating.
In the event that substantial amounts of overtime are required for unforeseen problems, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, the overtime guidelines shall be followed.
4.14.3 The following guidelines are applicable to personnel performing safety-related functions (e.g., licensed Senior Reactor Operators, Reactor Operators, Health Physicists, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants and Key Maintenance Personnel). Overtime Deviation shall be controlled as specified in each plant's licensing documents, and may be supplemented as directed by site management.
- 1.
An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
- 2.
An individual should not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period (all excluding shift turnover time).
- 3.
A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods.
(Shift turnover time should not be part of the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> break period.)
- 4.
Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift or crew.
- 5.
The crew performing fuel loading operations should not normally be expected to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> out of each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period when scheduled for consecutive daily duty.
FENOC Procedure Number:
NOP-LP-1 002
Title:
Use Category:
Fitness For Duty Program General Skill Reference Revision:
Change:
Page 00 N/A 32 of 36 4.14.4 Deviation from the above guidelines shall normally not be required during times when the plant is operating and adequate shift coverage is available.
Exceptions to this policy may include a Limiting Condition for Operation (LCO), Emergency Plan activation or callout, or other significant need to maintain safe plant operation, to maintain shift compliment, or maintain production capability.
NOTE An electronic database version of the forms may be used as applicable to each site's overtime request program.
4.14.5 Deviations from the overtime guidelines are normally requested by the immediate supervisor and authorized by the Plant Manager or his designees (or by higher levels of management) using the Technical Specification Overtime Deviation Request (PNPP No. 7699) at the Perry Plant or the Overtime Deviation Request at DBNPS, DB-0047. Overtime deviation requests should not be completed significantly in advance of the hours to be worked.
4.14.6 Supervisors requesting overtime deviation must be familiar with the condition of the individual involved to ensure that the additional overtime hours can be safely worked.
4.14.7 The Section Manager responsible for personnel who perform safety-related functions; (e.g., Senior Reactor Operators, Reactor Operators, Auxiliary Operators, Perry Plant Operators, Perry Plant Attendants, Health Physics technicians, and Key Maintenance Personnel), shall maintain a method by which the overtime hours of an individual may be compared to the overtime guidelines.
4.14.8 The Plant Manager or his designees shall review individual overtime on a monthly basis to ensure that excessive hours have not been assigned and that routine deviation from the overtime guidelines is not authorized.
TECHNICAL SPECIFICATION OVERTIME DEVIATION REQUEST DEPTISECTION PNPP No. 7699 Rev. 9/27/00 DEVIATION CODES:
1 - MORE THAN 16 HRS STRAIGHT 3 - MORE THAN 24 HRS IN 48 HRS 5 - LESS THAN 8 HR BREAK BETWEEN ASSIGNMENTS 2-MORE THAN 16 HRS IN 24 HRS 4-MORE THAN 72 HRS IN 7 DAYS (CODES 01 -04 EXCLUDE SHIFT TURNOVER TIME)
NAME SOCIAL SECURITY CODE START END DATE REASON No.
DATE Reason shall include as a minimum: 1) the specific work to be performed, 2) why other individuals cannot not be used and 3) why the work cannot be rescheduled. General statements such as "outage support" and "to meet the schedule" are not acceptable.
I I
I I
I I
I I
I I
I I
Supervisors requesting an overtime deviation are signifying that they are familiar with the condition of the individual involved and that the individual's condition is such that the additional overtime hours can be safely worked.
REQUESTED BY GENERAL MANAGER/DIRECTOR APPROVAL
/
I Signature Date Section Signature Date I
I I
I I
I I
I I
I I
I
Appendix L Job Performance Measure Job Performance Measure Worksheet Form ES-C-1 341-513-03-02 341-640-03-02 341-641-03-02 Task
Title:
K/A
Reference:
Make a Four Hour (1 OCFR5 0.72 Non-Em ergency)
Notification JPM No:
2003 NRC SRO A. L.b 2.1.17 Examinee:
Facility Evaluator:
N/A Method of testing Simulated Performance Classroom Actual Performance Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
The Candidate determines that a Four Hour Notification is required and determines when the notification is due in accordance with PAP-1604, Reports Management. Form PNPP No. 6912, Event Notification, is correctly prepared.
PAP-1604 Rev 6, PIC 2 Event Notification (Form PNPP No. 6912)
PAP-1604 Rev 6, PIC 2 NO 20 minutes Facility:
Perry Task No:
NRC Examiner:
Date:
Simulator Plant
" Appendix C
Appendix C Job Performance Measure Form ES-C-I Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
You are the on-duty Shift Manager. The plant was conducting a shutdown in preparation for entering a refueling outage. The shutdown schedule called for power to be reduced to 20% and then a manual reactor scram was to be inserted.
Thirty minutes ago while shifting reactor feed pumps, a problem with the Master Level Controller resulted in an excessive feed rate and an increasing RPV level. The Reactor Operator inserted a manual reactor scram just prior to reaching RPV Level 8. Reactor power at the time of the scram was 30%. All equipment operated as designed following the scram and plant conditions are now stable.
As the Shift Manager, evaluate this event for reportability per PAP-1604, Reports Management, and perform any required notifications to the NRC Operations Center within the required time frame.
. C T, if 11 Ca ý 11.6in PNPP No. 6912 Rev. 1/16/01 ANSWER KEY EVENT NOTIFICATION Perry Nuclear Power Plant Unit 1 Caller's Name/Signature Title I Time/Date of Call Event Time & Zone IEvent Date IPower/Mode Before Power/Mode After XX:XX Eastern IX/XX/2003 IMode 1 Mode 3 EVENT CLASSIFICATION 1-Hr Non-Emergency 10CFR50.72 (b)(1)
I (v)(A) Safe SID Capability AINA General Emergency GEN/AAEC I
TS Deviation ADEV (v)(B) RHR Capability AINB Site Area Emergency SITIAAEC 4-Hr Non-Emergency 10CFR50.72(b)(2)
(v)(C) Control of Rad Release AINC Alert ALE/AAEC (i)
TS Required S/D ASHU (v)(D) Accident Mitigation AIND Unusual Event UNUI/AAEC (iv)(A)
ECSS Discharge to RCS ACCS (xii)
Offsite Medical AMED X 50.72 Non-Emergency (see next columns)
X (iv)(B)
APRS (xiii)
Lost Comm/Asmt/Resp ACOM Physical Security (73.71)
DDDD (xi)
Offsite Notification APRE 60-Day Optional 10CFR50.73(a)(1)
Material /Exposure B???
8-Hr Non-Emergency IOCFR50.72(b)(3)
Invalid Specified System Fitness for Duty HFIT (ii)(A)
Degraded Condition ADEG Actuation AINV Other (see last column)
(ii)(B)
Unanalyzed Condition AUNA Other Unspecified Requirement (Identify)
Information Only NNF (iv)(A)
Specified System NONR
_,_Actuation AESF NONR DESCRIPTION Include: Systems affected, actuations & their initiating signals, causes, effect of event on plant, actions taken or planned, etc.
CR No.
Manual actuation of the Reactor Protection System (RPS) due to failure of the Feedwater Level Control system.
NOTIFICATIONS YES NO WILL BE Anything unusual or not understood?
Yes No NRC Resident (Explain above)
State(s)
Did all systems function as required.
Yes No Local
___(Explain above)
Other Gov Agencies Mod of operation until corrected:
Estimated Restart Additional info on back?
Media/Press Release Date:_Yes
___No Other Information Requested by NRC:
Name of Individual Contacted:
ENF No.
PAP-1604
PNPP No. 6912 Rev. 1/16/01 ANSWER KEY EVENT NOTIFICATION (Cont.)
ADDITIONAL INFORMATION RADIOLOGICAL RELEASES: CHECK OR FILL IN APPLICABLE ITEMS (specific details/explanations should be covered in event description)
Liquid Release Gaseous Release Unplanned Release Planned Release Ongoing Terminated Monitored Unmonitored Offsite Release T.S. Exceeded RM Alarms Areas Evacuated Personnel Exposed or Contaminated Offsite Protective Actions Recommended
-*State release path in description Release Rate (Ci/sec)
% T.S. Limit HOO Guide Total Activity (Ci)
% T.S. Limit HOO Guide Noble Gas 0.1 Ci/sec 1000 Ci Iodine 10 uCi/sec 0.01 Ci Particulate 1 uCi/sec 1 mCi Liquid (excluding tritium & dissolved 10 uCi/min 0.1 Ci noble gases)
Liquid (tritium) 0.2 Ci/min 5 Ci Total Activity RAID Monitor Readings:
Alarm Setpoints:III!
% T.S. Limit (if applicable)I II RCS TUBE LEAKS: CHECK OR FILL IN APPLICABLE ITEMS: (specific details/explanations should be covered in event description)
Location of the Leak (e.g., valve, pipe, etc.):
Leak Rate:
Units: gpm/gpd T.S. Limits:
Sudden or Long Term Development:
Leak Start Date:
Time:
Coolant Activity & Units:
List of Safety Related Equipment Not Operational:
EVENT DESCRIPTION (Continued from front)
PAP-16 t"] 4
Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
- Performance Step:
6.1.1.1 Standard:
Comment:
Ensure that each event or condition is evaluated under the notification requirements specified in Attachment 1.
Evaluates PAP-1604, Attachment 1, and determines that a Four Hour (1 OCFR50.72 Non-Emergency) Notification is required due to the RPS actuation (when the reactor is critical).
Note: The Candidate must determine that the manual reactor scram was not part of the pre-planned shutdown sequence.
Note: The Candidate is not required to physically notify the NRC Operations Center in the next Step.
Performance Step:
6.1.1.2 Standard:
Comment:
Ensure that the required notifications are made within the specified time requirements to the NRC Operations Center via the Emergency Notification System (ENS) unless otherwise specified in.
Determines that the notification is due four hours from the time of the manual reactor scram.
Note: The Evaluator may need to prompt the Candidate to verbalize the latest time that the notification is required to be made.
Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATION Performance Step:
6.1.1.3 Standard:
Comment:
Ensure that information provided to the NRC is recorded on an Event Notification (form PNPP No. 6912, Attachment 3) including any additional information requested by the NRC Duty Officer.
Form PNPP No. 6912, Initial Notification, is properly filled out.
Only the RPS Actuation box is a critical step for the completion of the form.
Cue: If asked, inform the Candidate that the Condition Report (CR) has not been written yet.
Note: See attached copy of completed Form PNPP No. 6912, Event Notification, in order to verify proper completion of the Event Notification Form.
Note: The Candidate should identify where he can obtain Form PNPP No. 6912. When Candidate identifies the need for Form PNPP No. 6912, hand the Candidate a blank form.
Note: The Candidate is only required to complete Form PNPP No.
6912 through the completion of the Description block.
Terminating Cue:
When Form PNPP No. 6912, Event Notification, is properly filled out through the completion of the Description block, the evaluation for this JPM is complete.
Appendix U Page 7 of 10 Form ES-C-I Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
A-p-pendix C2 Page 7 of 10 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC SRO A. 1.b Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 8 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
INITIATING CUE:
You are the on-duty Shift Manager. The plant was conducting a shutdown in preparation for entering a refueling outage. The shutdown schedule called for power to be reduced to 20% and then a manual reactor scram was to be inserted.
Thirty minutes ago while shifting reactor feed pumps, a problem with the Master Level Controller resulted in an excessive feed rate and an increasing RPV level. The Reactor Operator inserted a manual reactor scram just prior to reaching RPV Level 8. Reactor power at the time of the scram was 30%. All equipment operated as designed following the scram and plant conditions are now stable.
As the Shift Manager, evaluate this event for reportability per PAP-1604, Reports Management, and perform any required notifications to the NRC Operations Center within the required time frame.
PNPP No. 6912 Rev. 1/16/01 EVENT NOTIFICATION Perry Nuclear Power Plant Unit 1 Caller's Name/Signature Title Time/Date of Call Event Time & Zone Event Date Power/Mode Before Power/Mode After EV-ENT CLASSIFICATION 1-Hr Non-Emergency I0CFR50.72 (b)(1)
_(v)(A) Safe S/D Capability AINA General Emergency GEN/AAEC I
TS Deviation ADEV (v)(B) RHR Capability AINB Site Area Emergency SIT/AAEC 4-Hr Non-Emergency 10CFR50.72(b)(2)
(v)(C) Control of Rad Release AINC Alert ALEAAEC._.-_
(i)
TS Required S/D ASHU (v)(D) Accident Mitigation AIND Unusual Event UNU/AAEC (iv)(A)
ECSS Discharge to RCS ACCS (xii)
Offsite Medical AMED 50.72 Non-Emergency (see next columns)
(iv)(B)
APRS (xiii)
Lost Comm/AsmtlResp ACOM Physical Security (73.71)
DDD (xi)
Offsite Notification APRE 60-Day Optional 10CFR50.73(a)(1)
Material/Exposure B???
8-Hr Non-Emergency 10CFR50.72(b)(3)
Invalid Specified System Fitness for Duty HFIT (ii)(A)
Degraded Condition ADEG Actuation AINV Other (see last column)
(ii)(B)
Unanalyzed Condition AUNA Other Unspecified Requirement (Identify)
Information Only NNF (iv)(A)
Specified System NONR
_Actuation AESF NONR DESCRIPTION Include: Systems affected, actuations & their initiating signals, causes, effect of event on plant, actions taken or planned, etc.
CR No.
NOTIFICATIONS YES NO WILL BE Anything unusual or not understood?
Yes No NRC Resident (Explain above)_
State(s)
Did all systems function as required?
Yes No Local (Explain above)
Other Gov Agencies Mod of operation until corrected:
Estimated Restart Additional info on back?
____Date:
[
e
]N Media/Press Release Other Information Requested by NRC:
Name of Individual Contacted:
ENF No.
PAP-1604
PNPP No. 6912 Rev. 1/16/01 EVENT NOTIFICATION (Cont.)
ADDITIONAL INFORMATION PAP-1604 RADIOLOGICAL RELEASES: CHECK OR FILL IN APPLICABLE ITEMS (specific details/explanations should be covered in event description)
Liquid Release Gaseous Reeas~e Unplanned Release IIPlanned Release Ongoing IITerminated Monitored Unmonitored Offsite Release IIT.S. Exceeded RM Alarms IIAreas Evacuated Personnel Exposed or Contaminated Offsite Protective Actions Recommended
- State release path in description Release Rate (Cilsec)
% T.S. Limit HOO Guide Total Activity (Ci)
% T.S. Limit HOO Guide Noble Gas 0.1 Cl/sec 1000 Ci, Iodine 10 uCilsec 0.01 Ci Particulate I________________
uCilsec 1 mCi Liquid (excluding tritium & dissolved 10 uCi/min 0.1 Ci noble gases)
Liquid (tritium) 0.2 Cu/min 5 Ci Total Activity_______________________
RCS TUBE LEAKS: CHECK OR FILL IN APPLICABLE ITEMS: (specific detailsexplanations should be covered in event description)
Location of the Leak (e.g., valve, pipe, etc.):
Leak Rate:
Units: gpm/gpd T.S. Limits:
Sudden or Long Term Development:
Leak Start Date:
Time:
Coolant Activity & Units:
List of Safety Related Equipment Not Operational:
EVENT DECITION (Continued from front)
PAP-1604 Pa ge.
Rev.:
6 / C-i
.REAgýýRPýMER 1.0 PURPOSE To manage verbal and written reports prepared and submitted to outside regulatory agencies.
2.0 SCOPE This procedure applies to verbal and written reports prepared and submitted to outside regulatory agencies related to the operation of the Perry Plant including events and periodic information reporting.
3.0 RESPONSIBILITIES 3.1 Plant Manager and all Directors:
Ensure the reporting requirements outlined in this procedure are met by personnel in their department.
3.2 Section Managers:
- 1.
Ensure that reports are reviewed and submitted in a timely manner.
- 2.
Assign individuals the responsibility for report preparation and maintain cognizance over the status of each report (or applicable portions of the report) under preparation within their section.
j, 3 Shift ngr erya Esurefh*e Eme Agei-Notiflcation System (ENS) fqui-t- *
- s
ýre~t with-Aht E
rameas spec i
I*n the*
pplicable regulati6o.
3.4 Personnel, Regulatory Affairs:
- 1. Review Condition Reports (CRs) for notification and reporting requirements.
- 2.
Request required information from the responsible sections.
- 3.
Assist in preparation of reports, when requested.
- 4.
Track completion of reports, and when applicable, submit reports to outside agencies.
- 5.
Prepare and submit Licensee Event Reports (LERs).
3.5 Assigned Preparers:
Prepare or assist in the preparation of reports in accordance with the requirements described in this procedure and on the pertinent Report Summary sheet.
PAP-1604 Page:
5 Rev.:
6 / C-I 6.0 DETAILS 6.1 Immediate 14otifications 6.1.1 Shift ManageX:
- 1. -- Ensure that each event or condition is-eval-Trated under the notification requirements specified in Attachment 1.
NOT:
hpe ren rti*
in*
ciated tAte
.flqtificationsý begins-at.
th-e--ae-Ja-iti n of an Em-e-rg4dny "Cl
'occurrence of the ý--e rindition, -orj,-Vh~n t has been determine t-a a
- reprtable eV---
- o dio-xns~
s Any event or condition requiring an evaluation in order to determine reportability must be evaluated on a schedule commensurate with its safety significance.
Examples of events or conditions which may require evaluation include, but are not limited to:
any event or condition that at the time of discovery could have prevented fulfillment of a safety function; any event or condition that results in the condition of the plant including its principal safety barriers being seriously degraded; or, any event or condition that results in the plant being in an unanalyzed condition that significantly degrades plant safety.
NOTE:
For significant plant transients or events, several conditions may occur which each require notification per Attachment 1.
It is acceptable to provide each required notification in a single telephone call provided such a call is made within the most restrictive notification time limit.
_Ensurejhat the required notificatiof-mde withinWthhe specified time requirements to th-Rý Operat
--athe Emergency Not if i ct i=Sys tez-(EN Y lesbs ser peified in Attachmrht 1.
If the ENS-is unavailable, --
oh t610`--ca
- nmbers :to reach tH4ýe 6f (301) 816-5100 (301) 951-0550 (Backup)
(301) 816-5151 (Telecopy)
NOTE:
Facsimile transmission by telecopier may be used in order to simplify communication of relevant information and to avoid discrepancies.
,3.--Ensure that information' qpr~vided -fothe6NýI-
%rded-on an ent Naotifioatl
'frorm (PNPP No. -6912, Attachmentt
-including 4ny Additional in~formatio requested by the Nlot Dut~yOfficerý.
PAP-1604 Page:
6 Rev.:
6 If the event requires the declaration of an Emergency Classification, in accordance with <EPI-BI> "Emergency Notification System" an Initial Notification form should be used.
- 4.
Request an Event Notification Number from the NRC Duty Officer and enter this number in the appropriate block of the form.
NOTE:
A number is not issued for a loss of the ENS or the
- HPN.
- 5.
Ensure any follow-up notification requirements are identified and noted on the form.
- 6.
Ensure that the completed notification forms are attached to the Condition Report (CR) for processing.
- 7.
Complete the applicable portion of the CR and ensure a numbered copy (including the ENS form) is faxed to Regulatory Affairs.
6.1.2 Compliance Engineer:
- 1.
Verify that notification requirements established in have been satisfied.
- 2.
Perform an Initial evaluation of reporting requirements per and document on the CR Reportability Review (PNPP No.
9593, Attachment 4) or equivalent.
If conditions warrant, ensure the initiation of a Licensee Event Report (LER) and process per <PAP-0611>.
The timeline associated with the immediatd notification requirements will be the basis for determining the time of discovery for starting the 30- or 60-day LER "clock," as appropriate.
- 3.
Ensure that any required non-periodic reports are identified.
NOTE:
Non-periodic reports generated as a follow-up to reportable *occurrences are identified in Attachment 1.
Other non-periodic reports are listed on Attachment 6.
- 4.
Forward the completed CR Reportability Review to. the CR Coordinator.
6.2 Report Control Measures 6.2.1 Personnel, Regulatory Affairs:
- 1.
Establish and maintain a data base which contains the report
- numbers, titles, references, report distribution, submittal frequency, basic content requirements, and section responsible for preparation.
Sheet 1 of 36 Page:
10 / C-2 NOTIFICATION/REPORTING REQUIREMENTS Index Notification/Report Subject Sheet I.
Immediate Notification la.
lb.
- 2.
- 3.
4.
10CFR20.1906(d)(1) 10CFR20.1906(d) (2)
IOCFR20.2201 (a) (1) (i) 10CFR20. 2202 (a) 10CFR40.64 (c)
- 5.
- 6.
Ohio Administrative Code Section 3701:1-38-21
- 7.
40CFRII0,117,302,355,265 II.
One Hour (10CFR50.72 Emergency)
- 1.
Package Removable Contamination Package Radiation Level Loss/Theft Licensed Material Over Exposure/Release 5 x Limits Theft/Diversion Loss of Uranium/
Thorium Loose Parts Detection Loss/Theft of Registered Material Oil, Chemical or Hazardous Waste Release Notification Declaration of any Emergency Class III. One Hour (10CFR50.72 Non-Emergency) Notification
- 1.
Deviation Pursuant to 10CFR50.54(x)
IV.
One Hour (Other) Notification
- 1.
Deleted
- 2.
- 3.
- 4.
- 5.
Accidental Criticality/Loss of Special Nuclear Material 7
Loss/Theft/Unlawful Diversion (or Attempt) of Special Nuclear Material 7
Loss of Shipment or Recovery/
Accounting of Lost Shipment 7
Safeguards Events 8
V3--- Fou~r odr-(n
- 2.
10CFR50.72(b) (2) (iv) (A) 34 10C'FR5072(b-
)(xiv)T
- 4.
I0CFR50.72 (b) (2) (xi)
Va.
Four Hour (Other) Notification
- 1.
10CFR36(c) (1) and (c) (7)
Initiation of Plant Shutdown Required by Tech Spec.
ECCS Injection APS Actuation (when reacto--r--*
rýtitcal}
News Release/Notification of Government Agency Safety Limit Violation
[10CFR50.72(b) (2) (i)]
5 5
5 5
6 6
6 6
6a 6b 8
9 10 10 10a PAP-1604 Rev.:
6
PAP-1604 Rev.:
6 Sheet 10 of 36 Page:
19 NOTIFICATION/REPORTING REQUIREMENTS
- 3.
AAvjevent-or con-dition ttateiýbs fc-tu-tion t
ofthe Refr Protection System (RPS) wleh' the-reactor is-riticl--Lpt when the a~ctuati-nýr-gults fro nid-16-par-htf a prIe-_hai-d sgnuerce during t.estin_
o--rac-or operat0on.
<10CFR50.72 (b) (2) (iv) (B)>
This paragraph requires the reporting of those unplanned events that result in either automatic or manual actuation of the RPS when the reactor is critical. Note that if an operator werne to manually scftm the reactor in anticipation of receiving an aut-omaitid -*r-eactor-scram,
ýhis would be reportable just as the automatica-scr&a wouldbe
.reputablt.
With-regard to preplanned actuations, RPS actuation as part of_a planned test-iPha--*n-alJ evolution ne-de-ret---pted.
Preplanned actuations -are those actuations tha-t-are expeceEd to actually occur due to preplanned activities covered by proce-dufes.
S_.ch_ actuations are _those for which-a-Tr edural step oro r
appropriate docuemtation indcate he specific actuation is actually
- pected to-dift.
Control room personnel should be aware of the specific signal gepneration -before its occurrence or indication in the control room.
However, if during the test or evolution, the ZPS actuates in a way that is not part of the-planne-d e-Volution, --that actuation should be reportid. For example, if -the normal reactor Z-hutdowffTradure requires thatlthe control-ods be inrerted-1 a
manu!
jreactor trip, the reactor tini not5e t-f-etrd._
-It er,
.if conditions develop during-the shiutdownthat require an automatic Sea tor trip, such a-f-e-dto6r trip must b3r*2ep id. The fact that the safety analysis assumes that the RPS will actuate automatically during an event does not eliminate the need t
that actuation.
,A.tuations that need not be-reported &re-those *initiated for*reaS6s other than to mitigate the cos-e-q-oT an eýVnt (e.g., at the discretion of Plant Management as part of a planned procedure or evolution).
- 4.
Any event or situation, related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made.
Such an event may include an onsite fatality or inadvertent release of radioactively contaminated materials.
<IOCFR50.72 (b) (2) (xi)>
Paragraph <50.72(b) (2) (xi)> besides covering some events such as release of radioactively contaminated tools or equipment to the public that may warrant NRC attention, also covers those events that would not otherwise warrant NRC attention except for the interest of the news media, other government agencies, or the public.
This criterion will capture those events previously reported under other criteria when such events require the NRC to respond because of media or public attention.
Because the purpose of this report is to provide timely and accurate information so the NRC can respond to heightened public concern, the report should be provided by the time the news release is issued.
PAP-1604 PNPP No. 6912 Rev. 1116/01 Rev.:
6 Sheet 1 of 2 EVENT NOTIFICATION FORM <B00977>
EVENT NOTIFICATION Perry Nuclear Power Plant I nif "1 S......PAP-1604 Caller's Namel*ignature Title Time/Date of Call Poe/oeBfre
, Powerilvode After
-- St raEegn7T Deiain.......
EV __(v)(B) RHR Capability ANB
/
ALZAE JI TS Requrded Condito ADEGJ (v()AcietMtgain AN In oM ate ia/ xo sur B???
N N Fr N o - m r e c 1(iv)0 72 b (
A )ai Specified System
!N N
Actuation AESF NONR DESCRIPTION Include: Systems affected, actuations & their initiating signals, causes, effect of event on plant, actions taken or planned, etc.
CR No.
NOTIFICATIONS YES NO WILL BE Anything-unusual or not understood?
Yes No NRC Resident NRCResiden (Explain above)
State(s)
Did all systems function as required?
Yes No Lther oa (Explain above)
Other Gov Agencies Mod of operation until corrected:
Estimated Restart Additional info on back?
MedialPress Release Date:
[3 Yes
[3 No WRj*b**-*W,
., k....
Other Information Requested by NRC:
Name of Individual Contacted:
ENF No.
Page:
47
PAP-1604 Rev.:
6 Sheet 2 of 2 Page:
48 EVENT NOTIFICATION FORM <B00977>
EVENT NOTIFICATION (Cont.)
PNPP No. 6912 Rev. 1/16/01 ADDITIONAL INFORMATION PAP-1604 RADIOLOGICAL RELEASES: CHECK OR FILL IN APPUCABLE ITEMS (speciric detailsexplanadons should be covered in event description)
Lquid Release Gaseous Release Unplanned Release Planned Release On cTeminated Monitored Unmonitored Offsite Release T.S.
c RM Alarms Areas c
Personnel Exposed or Contaminated Ofst rtcieAtosRcmeddSaerlaepth decription Ro-m-0 ahi ecito
Appendix C Job Performance Measure Form ES-C-i Worksheet Perry Controlling Containment Penetration to Meet the Isolation Requirements of Tech Spec 3.6.1.3 Task No:
JPM No:
343-723-03-02 343-692-03-02 2003 NRC SRO A.2 K/A
Reference:
Examinee:
Facility Evaluator:
2.2.15 NRC Examiner:
N/A Date:
Method of testing Simulated Performance Classroom Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
Actual Performance Simulator Plant The Candidate determines the following administratively-controlled boundaries are required to isolate penetration P 113:
Automatic valves I E 12-F028A, 1E E 2-F03 7A, and IE E 2-F042A are closed and de-activated (i.e., MCC disconnect is open) with OPS Admin Tags placed on each valve's control switch, MCC disconnect, and local valve handwheel operator.
OAI-1701, Rev 3 TAI-1120-7, Rev 2, PIC 1 PDB-G0001, Rev 1, PIC 5 Technical Specification 3.6.1.3 and Bases Mechanical and Electrical Drawings - 302 and 208 Series OAI-1701, Rev 3 TAI-1120-7, Rev 2, PIC I PDB-G000 1, Rev ], PIC 5 Technical Specification 3.6.1.3 and Bases Mechanical and Electrical Drawings - 302 and 208 Series NO 20 minutes NUREG 1021, Revision 8, Supplement I Facility:
Task
Title:
Appendix C Job Performance Measure Form ES-C-1 Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant is in MODE 1. During the performance of SVI-E 1 2-T200 1, RHR A Pump and Valve Operability Test, valve 1 El12-F027A (RHR A TO CNTMT SHUTOFF) blew all 3 main line fuses during its valve stroke time test. The valve is currently open and cannot be manually closed because it is mechanically bound. The valve has been declared inoperable and Technical Specification 3.6.1.3 (PCIVs), Condition A has been entered.
The Shift Manager, directs you as the Shift Engineer, to determine the component(s) that will require Operations Administrative Tags in accordance with OAI-1701, Attachment I in order to comply with Technical Specification 3.6.1.3, Condition A.
NUREG 1021, Revision 8, Supplement I
Appendix C Page 3 of 6 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Note: The Candidate is not required to prepare the Operations Administrative Control Tagout; only to identify the components to be tagged as discussed in OAI-1701, (Emergent Items).
Note: The Candidate is not required to generate the LCO Tracking Form or document in the Plant Narrative Log the actions taken to meet Technical Specification 3.6.1.3 Action A as discussed in OAI-1701, Attachment 1 (Emergent Items).
Note: The Candidate may refer to any of the following plant references in order to determine the penetration (P113) associated with Valve 1E12-F027A and the corresponding components that must be administratively controlled:
"* Mechanical and Electrical Drawings - 302 and 208 Series
"* PDB-G0001, Containment Isolation Valve Table
"* TAI-1120-7, Containment Penetration Listing
"* SVI-E12-T9113, Type C LLRT of 1E12 Penetration P113 NUREG 1021, Revision 8, Supplement 1
Appendix C Page 4 of 6 Form ES-C-I PERFORMANCE INFORMATION Performance Step:
OAI-1701, Emergent Items / WCU Clearance Personnel Standard:
Comment:
Equipment deficiencies resulting in inoperable Primary Containment Isolation Valves should be handled as follows:
The Operations Administrative tags should be prepared for the inoperable equipment and have the same information that would have been provided by the Clearance Unit.
When Technical Specifications require a component to be closed and de-activated, the normal practice will be to provide tags for the control switch, disconnect or air supply, and local operator for the component(s) maintaining control of the penetration.
Identifies automatic valves 1E12-F028A, 1E12-F037A, and 1E12-F042A are to be closed and de-activated (i.e., MCC disconnect opened) with OPS Admin Tags placed on each valve's control switch, MCC disconnect, and local valve handwheel operator.
Note: The Candidate may identify manual valve I E12-F604A is to be closed and capped with an OPS Admin Tag placed on its local handwheel. This is not a critical item; it is only a conservative action which is not required to meet Required Action A. 1.
Note: Since valve 1E12-F027A cannot be closed, this valve cannot be administratively controlled in order to meet Required Action A. I for Tech Spec 3.6.1.3.
Note: Automatic valves 1E 12-F028A, 1E 12-F037A, and 1El 2-F042A are normally closed when RHR A is in standby readiness.
Terminating Cue:
When the Candidate has determined the components that must be administratively controlled in order to isolate penetration P113, the evaluation for this JPM is complete.
NUREG 1021, Revision 8, Supplement I
Appendix C Page 5 of 6 Form ES-C-I Question Documentation:
Question:
Response
Result:
SAT OR UNSAT Examiner's Signature and Date:
NUREG 1021, Revision 8, Supplement 1 Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC SRO A.2 Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
The plant is in MODE 1. During the performance of SVI-E12-T2001, RHR A Pump and Valve Operability Test, valve 1E12-F027A (RI-R A TO CNTMT SHUTOFF) blew all 3 main line fuses during its valve stroke time test. The valve is currently open and cannot be manually closed because it is mechanically bound. The valve has been declared inoperable and Technical Specification 3.6.1.3 (PCIVs), Condition A has been entered.
INITIATING CUE:
The Shift Manager, directs you as the Shift Engineer, to determine the component(s) that will require Operations Administrative Tags in accordance with OAI-1701, Attachment 1 in order to comply with Technical Specification 3.6.1.3, Condition A.
NUREG 1021, Revision 8, Supplement I
PCIVs 3.6.1.3 3.6 CONTAINMENT SYSTEMS 3.6.1.3 Primary Containment Isolation Valves (PCIVs)
LCO 3.6.1.3 APPLICABILITY:
Each PCIV, except containment vacuum breakers, shall be OPERABLE.
MODES 1, 2, and 3, When associated instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment and Drywell Isolation Instrumentation."
ACTIONS N O T E SO
- 1. Penetration flow paths except for the inboard 42 inch purge valve penetration flow paths may be unisolated intermittently under administrative controls.
- 2.
Separate Condition entry is allowed for each penetration flow path.
- 3.
Enter applicable Conditions-and Required Actions for systems made inoperable by PCIVs.
- 4.
Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment-Operating," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria in MODES 1, 2, and 3.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except penetration flow paths penetration flow path for main steam with one PCIV by use of at least line' inoperable except due one closed and de to leakage not within activated automatic AND
- limit, valve, closed manual valve, blind flange, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main or check valve with steam line flow through the valve secured.
AND (continued)
Amendment No. 69 PERRY -
UNIT 1 3.6-9
PCIVs B 3.6.1.3 BASES ACTIONS penetrations and the fact that those penetrations exhaust (continued) directly from the primary containment atmosphere to the environment, the penetration flow paths containing these valves may not be opened under administrative controls.
A single purge valve in a penetration flow path may be opened to effect repairs to an inoperable valve, as allowed by the exception to SR 3.6.1.3.1 and Note 2 to SR 3.6.1.3.2.
A second Note has been added to provide clarification that.
for the purpose of this LCO, separate Condition entry is allowed for each penetration flow path.
This is acceptable.
since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable PCIV.
Complying with the Required Actions may allow for continued operation, and subsequent inoperable PCIVs are governed by subsequent Condition entry and application of associated Required Actions.
The ACTIONS are modified by Notes 3 and 4.
These Notes ensure appropriate remedial actions are taken, if necessary.
if the affected system(s) are rendered inoperable by an inoperable PCIV (e.g., an Emergency Core Cooling System subsystem is inoperable due to a failed open test return valve), or when the primary containment leakage limits are exceeded in MODES 1. 2. and 3.
Pursuant to LCO 3.0.6. these ACTIONS are not required even when the associated LCO is not met.
Therefore. Nrotes 3 and 4 are added to require the proper actions to, be taken.
The term "penetration" refers to piping/ductwork lines that pass through the primary containment boundary: these lines are isolable by PCIVs.
This use of the term is separate and distinct from the Civil/Structural term "Penetration" used to describe the larger opening that multiple lines may pass through and which is sealed by welded steel plate or environmentally qualified material everywhere except where the lines pass through.
When a PCIV becomes inoperable within a line, and the Required Action directs the operator to "isolate the affected penetration flowpath." the intent is to isolate only the line with the inoperable PCIV.
It is not the intent to close off other lines that are unaffected by the inoperable PCIV.
A.1 and A.2 With one or more penetration flow paths with one PCIV inoperable except for inoperability due to leakage not within a limit specified in an SR to this LCO, the affected (continued)
Revision No. 1 PERRY - UNIT 1 B 3.6-20
PCIVs B 3.6.1.3 BASES ACTIONS A.1 and A.2 (continued) penetration flow path must be isolated.
The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure.
Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, a blind flange, and a PCIV check valve with flow OC through the valve secured.
For penetrations isolated in accordance with Required Action A.1, the device used to isolate the penetration should be the closest one available to the primary containment.
The Required Action must be completed within the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time (8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main steam lines).
The specified time period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable considering the time required to isolate the penetration and the relative importance of supporting primary containment OPERABILITY during MODES 1, 2. and 3.
For main steam lines, an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is allowed.
The Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the main steam lines allows a period of time to restore-the MSIVs to OPERABLE status given the fact that MSIV closure will result in isolation of the main steam line(s) and a potential for plant shutdown.
For affected penetrations that have been isolated in accordance with Required Action A.1. the affected penetration flow path must be verified to be isolated on a periodic basis.
This is necessary to ensure that primary containment penetrations requi red to be isolated following an accident, and no longer capable of being automatically isolated, will be isolated should an event occur.
This Required Action does not require any testing or isolation device manipulation.
Rather, it involves verification that those isolation devices outside primary containment, drywell, and steam tunnel and capable of being mispositioned are in the correct position.
The Completion Time for this verification of "once per 31 days for isolation devices outside primary containment. drywell, and steam tunnel," is appropriate because the isolation devices are operated under administrative controls and the probability of their misalignment is low.
For isolation devices inside primary containment, drywell, or steam tunnel, the specified time period of "prior to entering MODE 2 or 3 from MODE 4, if not performed within the previous 92 days", is based on engineering judgment and is considered reasonable in view of (continued)
PERRY - UNIT I B 3.6-21 Revi si on No. 1
PERRY NUCLEAR POWER PLANT Procedure Number:
OAI-1 701
Title:
Use Category:
Tracking of LCOs General Skill Reference Revision:
Page 1
3 117 of 46 ATTACHMENT 1: TECHNICAL SPECIFICATION 3.6.1.3 EXPECTATIONS Page 1 of 3 This attachment describes the methodology for controlling containment penetrations to meet the isolation requirements of Technical Specification 3.6.1.3.
Primary Containment Isolation Valves (PCIVs).
Work Control Unit Clearance Personnel Containment Integrity concerns, once identified, should be noted on the clearance.
Operations Administrative tags shall be prepared and provided for all penetrations associated with inoperable PCIVs. These Administrative Control tags will be used to support configuration control during testing requirements and work activities, while maintaining containment integrity.
When Technical Specifications require a component to be closed and de-activated, the normal practice will be to provide tags for control switch, disconnect or air supply and the local operator for the component(s) maintaining control of the penetration. A drawing highlighting the penetration controls should be provided with the clearance. Deviations from this should only occur when directed by a Senior Reactor Operator.
Operations Administrative tags prepared for Technical Specification 3.6.1.3 administrative control should be reviewed by a SRO (normally the WCU SRO) that is not the SRO issuing the clearance.
Impact Reviewer During work impact review, the SRO performing the review will prepare an LCO Tracking form for Technical Specification 3.6.1.3 separate from the tracking form prepared for the affected system. Include in the problem description section of the tracking form the equipment made inoperable per Technical Specification 3.6.1.3 and the component(s) providing administrative control of the penetration.
Work Release Authority The US shall ensure that Technical Specification 3.6.1.3 Action requirements are met for inoperable PCIVs and the actions taken to meet the LCO are documented in the Plant Narrative Log or on an LCO Tracking form whenever a PCIV is removed from service.
PERRY NUCLEAR POWER PLANT Procedure Number:
OAI-1 701
Title:
Use Category:
Tracking of LCOs General Skill Reference Revision:
Page 1
3 118 of 46 ATTACHMENT 1: TECHNICAL SPECIFICATION 3.6.1.3 EXPECTATIONS Page 2 of 3 On Shift Licensed Operators In modes 1,2, and 3, all on shift licensed operators (RO's / SRO's) should know the status of Technical Specification 3.6.1.3 inoperable equipment, and the controls in place. In modes 1,2, and 3, turnover checklists should include inoperable Primary Containment Isolation Valves and the controls established.
In modes 4 and 5, when Primary Containment Integrity is required, only the penetrations that are open under administrative controls need to be included on turnover checklists.
Emerqient Items Equipment deficiencies resulting in inoperable Primary Containment Isolation Valves should be handled as follows:
- 1.
The Operations Administrative tags should be prepared for the inoperable equipment and have the same information that would have been provided by the clearance unit. The Administrative tags should be reviewed by two SRO's (one may be the SRO issuing the OAT's).
- 2.
Generate a LCO Tracking form. The LCO Tracking form will include the same information as an LCO Tracking form that would have been prepared during the impact review.
- 3.
Actions taken to meet Technical Specification 3.6.1.3 Action A should be documented in the Narrative Log or on an LCO Tracking form.
PERRY NUCLEAR POWER PLANT Procedure Number:
OAI-1701
Title:
Use Category:
Tracking of LCOs General Skill Reference Revision :
Page 3
19 of 46 ATTACHMENT 1: TECHNICAL SPECIFICATION 3.6.1.3 EXPECTATIONS Page 3 of 3 Performance of SVI's and PTI's In modes 1, 2, and 3, during the performance of SVls, PTIs, and other approved tests, when it is necessary to open manual Primary Containment Isolation Valves, perform the following:
- 1.
Enter Technical Specification 3.6.1.3, Primary Containment Isolation Valves (PCIVs).
- 2.
Do not enter Technical Specification 3.6.1.1, Primary Containment Operating. Primary containment integrity is not lost, and the actions of restoring containment integrity are not applicable.
- 3.
Document the manual PCIVs open under administrative controls in the Narrative Log.
NOTE 0
In accordance with the LCO Bases, "the normally closed PCIVs are considered OPERABLE when, as applicable, manual valves are closed or opened in accordance with the applicable administrative controls." In accordance with the Action Bases, "these controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when the need for primary containment isolation is indicated." Note that the dedicated operator is not necessarily a plant operator, but is any individual who has the ability to operate the valve as directed by the control room.
0 Not all PCIVs are listed in the Plant Data Book, Tab PDB-GO01. Use the 302 series prints (P&IDs) to review the valves opened in the SVI/PTI. This will ensure these valves are associated with the containment penetration in which administrative control are being taken.
TAI-I120-7 Page:
1 Rev.:
2 / C-I CONTAINMENT PENETRATION LISTING 1.0 PURPOSE To provide site personnel with an instruction which identifies all containment penetrations.
2.0 SCOPE This instruction lists each containment penetration.
This listing includes the penetrations; inboard barrier, outboard barrier, other penetration components, P&ID No.,
and test instructions (see Containment Penetration Listing [Attachment 1]).
This instruction allows for identification of cross-referencing of test instruction to tested components, of components tested as part of the Potential Secondary Containment Bypass Leakage, and penetrations requiring as-found testing.
3.0 RESPONSIBILITIES 3.1 Plant Engineering Section (PES),
Lead Equipment Analysis Engineer:
- 1.
Ensure the Containment penetration listing information is maintained current with plant design requirements.
- 2.
Verify this information is consistent with current regulations, codes, and standards.
3.2
- PES, LLRT Engineer:
Periodically review this instruction to maintain it current with plant design and instruction surveillance requirements.
4.0 REFERENCES
4.1 Source References
- 1.
Code of Federal Regulations (CFR) 50:
Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
- 2.
American National Standards Institute (ANSI/ANS) 56.8-1992:
Containment System Leakage Testing Requirements
- 3.
Technical Specification:
Primary Containment Leakage, 3.6.1.1 and 3.6.1.3
- 4.
PAP-1120:
Leak Testing Program (Cont.)
Sheet 3 of 23 TAI-1120-7 Page:
7 Rev.:
2 /
C-i Containment Penetration Listina (Cont.)
Inboard Outboard Other Pen.
Penet.
Instruction Barrier Barrier I
Component P&ID Remarks P107#
(Cont)
P108#
P109#
Pill#
P112#
P113#
P114#
N/A IPIl-F545*
lE61-D017*
Blk Flange*
lPll-F090*
1E21-F006 IEI2-D015A*
lPll-F060*
IE61-D003*
IPl-F080*
IE21-F005**
SVI-E12-T8107 SVI-Pl1-T9108 SVI-E61-T9109 SVI-PII-T9111 SVI-E21-T9112 SVI-E12-T9113 SVI-E12-T8113 SVI-M17-T9114 SVI-M17-T8114 IE12-F042A IE12-F037A lMI7-F010*
O-Ring*
IMI7-F015*
N/A None IPII-F539
& Cap IE61-F505
& Cap None IE21-F519 IE21-F520 IE21-F517 IE21-F518 1E21-F013 1E21-F014 IE21-F509 IE21-N050**
& Cap None None I D-302-641 D-302-102 D-302-811 D-302-102 D-302-705 D-302-642 D-912-606 D-912-606 Test shroud required Penetrations requiring Tested as part of the Tested as part of the as-found testing.
Potential Secondary CNTMT Bypass Leakage.
Potential Secondary CNTMT Bypass Leakage Mechanical Joints only.
1E12-F028A I 1EI2-F027A**
Page:
5 / C-3
- b.
CONTAINMENT MANUAL ISOLATION VALVES Penetration Number Valve Group (c)
Maximum Isolation Time (Seconds)
Secondary Containment Bypass Path (Yes/No) lB21-F065A (e) 1B21-F065B (e) lCll-F083 (e)
IC41-F518 1D23-FO1OA (e) 1D23-FOlOB (e) 1D23-FO20A(e) 1D23-FO20B (e) 1D23-FO30A (e) 1D23-FO30B (e) lD23-FO40A(e) lD23-FO40B (e)
ID23-F050 (e)
IE12-FO04A (e)
IEI2-FO04B (e)
IE12-F027A(e) lEl2-F027B (e) 1E12-F028A (e)
IEI2-F028B (e) 1E12-F042A 1E12-F042B lEl2-F042C (e) lE12-FO53A 1E12-F053B 1E12-F064A IEI2-F064B IEI2-F064C 1E12-F073A (e) 1E12-F105(e)
P403 Valve Number Test Pressure (Psig)
No No 50.0 50.0 7.80 7.80 P121 P414 P204 P315 P434 P320 P434 P320 P433 P319 P433 P319 P425 P102 P402 P113 P412 P113 P412 P113 P412 P411 P121 P414 P105 P407 P408 P118 Yes Yes No No No No No No No No No NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4
4 NA NA NA 4
4 4
NA 100*
100*
12.5*
NA 3
3 3
3 3
3 3
3 3
120*
120*
60*
60*
66 66 32 32 32 33 33 15 15 15 15*
(a)
(a)
(a)
(a)
(a)
(a)
(a)
(a)
(a)
No No No (h)
No (h)
No No No No No (h)
No No No No No No (h)
(b)
(b) 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 (b)
(b)
(b) 7.80 PDB-G0001 Rev. :
1 NA 120" No (b)
Sheet 1 of 1 SVI-E12-T9113 Page:
16 -
LAST Rev.:
6 Reference Drawing "1V
Appendix C Job Performance Measure Form ES-C-1 Worksheet Perry/
Issue a Revised Off-Site Protective Action Recommendation (PAR)
Following a Change in Meteorological Conditions Task No:
JPM No:
344-526-05-02 344-532-05-02 2003 NRC SRO A.4 K/A
Reference:
Examinee:
Facility Evaluator:
2.4.44 NRC Examiner:
N/A Date:
Method of testing Simulated Performance Classroom Actual Performance Simulator Task Standard:
Required Materials:
General
References:
Time Critical Task:
Validation Time:
The Candidate revises the default PAR to evacuate Subareas 1, 2 and 3.
Within the next 15 minutes, form PNPP No. 7794, Initial Notification, is correctly prepared in accordance with EPI-B1, Emergency Notification System.
EPI-B 1, Rev 11 EPI-B8, Rev 8, PIC 5 Initial Notification (Form PNPP No. 7794)
EPI-B 1, Rev 11 EPI-B8, Rev 8, PIC 5 YES 15 minutes for Step 5.1.10 20 minutes Facility:
Task
Title:
Plant
Appendix C Job Performance Measure Form ES-C-I Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
You are the on-duty Shift Manager and Emergency Coordinator. The Plant is in a General Emergency due to a Loss Of Coolant Accident with an unisolable primary containment penetration discharging outside containment.
The General Emergency default Protective Action Recommendation (PAR) was issued to evacuate Subarea 1 and the Lake. This was based on the meteorological conditions at the time. N__oo dose projection data was initially available.
You have just been provided with the following updated radiological and meteorological conditions due to a change in the wind direction.
Release In Progress Projected Dose from 5 - 10 miles:
TEDE:
<500mr CDEct: < 2 Rem Wind Speed: 10 MPH Wind Direction: 3500 As the Emergency Coordinator, evaluate the updated radiological and meteorological conditions with respect to the current default PAR per EPI-B8, Protective Actions and Guides, and perform any required action(s).
ANSWER KEY INITIAL NOTIFICATION PNPP No. 7794 Rev. 9/17/01 Page 1 of 2 EPI-B1
- 1. This is the Perry Nuclear Power Plant:
Z Control Room
[] Technical Support Center (TSC) [] Emergency Operations Facility (EOF)
FI Backup EOF (Communicator. State your NAME and ERO POSITION TITLE.)
- 2. This is a(n):
[] Actual Emergency Z Drill For step 3 below: Use only step 'a' when classifying or reclassifying an event. Use both steps 'a' & 'b' when simultaneously classifying and terminating from an Unusual Event or Alert. Use step 'c' when classifying after a transitory event. Use step 'd' when revising a protective action recommendation.
- 3. a. A (n) FJ UNUSUAL EVENT [] ALERT [] SITE AREA EMERGENCY RI GENERAL EMERGENCY has been declared at hours on
/
I based on EAL(s):
- b. The emergency situation has been terminated at hours on
/
/
(Time)
(Date)
- c. A transitory event has occurred which would have required the declaration of a(n):
LI ALERT LI SITE AREA EMERGENCY LI GENERAL EMERGENCY but was mitigated prior to classification. Current event status is at a(n):
LI UNUSUAL EVENT LI ALERT LI SITE AREA EMERGENCY declared at hours on
/
/
based on EAL(s):
(Time)
(Date)
- d. General Emergency protective actions are being changed at XX:XX hours onX/XX/2003.
(Time)
(Date)
- 4. Brief non-technical description of event: A Loss of Coolant Accident (LOCA) has occurred with leakage outside containment.
- 5. L]
- a. NO unplanned radioactive release has occurred.
0
- b. An unplanned radioactive release is in progress.
- 6. Utility recommended protective actions:
LI a. None.
Z b. Evacuation of people in Subareas:Orl(@ 4 5
6 7
Lake Erie (circle)
- 7. I repeat, this is a(n):
LI Actual Emergency
[
Drill COMMENTS:
Notification is due at:
XX:XX hours on X I XX / 2003 (Time)
(Date)
EMERGENCY COORDINATOR APPROVAL (signature)
AN-SWER KEY INITIAL NOTIFICATION PNPP No. 7794 Rev. 9/17/01 Page 2 of 2 EPI-B1 COMMUNICATOR INSTRUCTIONS:
A. Ensure Items 1-7 (page 1) are completed, and Emergency Coordinator has approved release of information.
B. Pickup the "5-Way" Ringdown. As parties answer, perform a roll call to verify that the State and county agencies listed below are on-line; record time contacted below. If party does NOT answer, initiate a separate call per EPI-B1.
ASHTABULA COUN 5-WAY USED?
TIME CONTACTED YES NO TY E_
El 5-WAY USED?
TIME CONTACTED YES NO LAKE COUNTY
_l
[]
GEAUGA COUNTY STATE OF OHIO Read the following: "Please obtain an Initial Notification form to copy this transmission.
Communication on the "5-Way" Circuit is being recorded." (Pause 5-10 seconds to allow agencies to obtain form before continuing.) Read the following: "The current date and time is: date
/
I,
time."
C. Transmit data on page 1. When completed, record the name of contact below; request a call back if the 5 Way was NOT used.
NOTE: The following step can be done in parallel with step C. above if additional communicators are available.
D. Once State and county agencies have been contacted, initiate call on NRC ENS Circuit. Read the following: "The following is a communication from the Perry Nuclear Power Plant. Communication on the ENS Circuit is being recorded."
E.
Transmit data on page 1. When completed, record the name of contact below; request a call back if the ENS was NOT used.
TIME NRC CONTACTED:
If the "5-Way" Ringdown or ENS Circuit was NOT used, a verification call back is required.
TIME OF CALLBACK ORGANIZATION PERSON CONTACTED JOB TITLE (If Applicable)
Ashtabula County LjN/A Geauga County DN/A Lake County KIN/A State of Ohio KIN/A Nuclear Regulatory FI N/A Commission COMMON OFFSITE ACRONYMS:
SD Sheriffs Department EOC Emergency Operations Center HP Highway Patrol EMA Emergency Management Agency OSHP Ohio State Highway Patrol OEMA Ohio Emergency Management Agency Communicator(s) Name: (1)
(2)
[TSC & EOF ONLY]
Forward a copy of completed form to the Information Liaison and Regulatory Affairs Coordinator.
R r_1
Appendix C Page 5 of 10 Form ES-C-I PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
- Performance Step:
5.1.3.3 Standard:
Comment:
Ensure that PAR is periodically evaluated based on degrading plant conditions or changes in wind direction or other meteorological conditions using Attachments 2 and 3, as appropriate.
Evaluates EPI-B8, Attachments 2 and 3, and determines PAR must be revised to evacuate Subareas 1, 2 and 3, based on the new wind direction.
Note: This Step is critical but not time critical.
Appendix C Page 6 of 10 Form ES-C-I PERFORMANCE INFORMATION Note:
Candidate will refer to EPI-B1, Emergency Notification System, to perform the following step.
- Performance Step:
Upon the decision to reclassify the event or issue a revised offsite 5.1.10 PAR, perform an initial notification to the State of Ohio, local counties, and NRC per section 5.1.3.
Standard:
Form PNPP No. 7794, Initial Notification, is properly filled out within 15 minutes from the decision to issue the revised PAR.
Items 3.d, 6.b, and Emergency Coordinator Approval line are critical steps for completion of the form.
Comment:
Note: See attached copy of completed Form PNPP No. 7794, Initial Notification, in order to verify proper completion of the Initial Notification Form.
Note: The Candidate should identify where he can obtain Form PNPP No. 7794. When Candidate identifies the need for Form PNPP No. 7794, hand the Candidate a blank form.
Note: The Candidate is not required to complete any other E-Plan forms such as PNPP No. 9100, Pager Messages.
Note: The Evaluator will role-play as the Control Room Communicator by accepting the completed Form PNPP No. 7794 when the Candidate is ready for the Control Room Communicator to make the initial notifications to the counties, state, and NRC.
Terminating Cue:
When Form PNPP No. 7794, Initial Notification, is properly filled out, the evaluation for this JPM is complete.
Appendix C Page 7 of 10 Result:
Form ES-C-I SAT OR UNSAT Examiner's Signature and Date:
Appendix C Page 7 of 10 VERIFICATION OF COMPLETION Job Performance Measure No.
2003 NRC SRO A.4 Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
N/A Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Appendix C Page 8 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
INITIATING CUE:
You are the on-duty Shift Manager and Emergency Coordinator. The Plant is in a General Emergency due to a Loss Of Coolant Accident with an unisolable primary containment penetration discharging outside containment.
The General Emergency default Protective Action Recommendation (PAR) was issued to evacuate Subarea 1 and the Lake. This was based on the meteorological conditions at the time. NQo dose projection data was initially available.
You have just been provided with the following updated radiological and meteorological conditions due to a change in the wind direction.
Release In Progress Projected Dose from 5 - 10 miles:
TEDE:
<500 mr CDEct: < 2 Rem Wind Speed: 10 MPH Wind Direction: 350' As the Emergency Coordinator, evaluate the updated radiological and meteorological conditions with respect to the current default PAR per EPI-B8, Protective Actions and Guides, and perform any required action(s).
INITIAL NOTIFICATION PNPP No. 7794 Rev. 9/17/01 Page 1 of 2 EPI-B1
- 1. This is the Perry Nuclear Power Plant:
F-1 Control Room E] Technical Support Center (TSC) [] Emergency Operations Facility (EOF)
F-Backup EOF (Communicator State your NAME and ERO POSITION TITLE.)
- 2. This is a(n):
[] Actual Emergency Rl Drill For step 3 below: Use only step 'a' when classifying or reclassifying an event. Use both steps 'a' & 'b' when simultaneously classifying and terminating from an Unusual Event or Alert. Use step 'c' when classifying after a transitory event. Use step 'd' when revising a protective action recommendation.
- 3. a. A (n) [] UNUSUAL EVENT 0 ALERT 3 SITE AREA EMERGENCY E] GENERAL EMERGENCY has been declared at hours on
/
/
based on EAL(s): __
- b. The emergency situation has been terminated at hours on
/ /
(Time)
(Date)
- c. A transitory event has occurred which would have required the declaration of a(n):
RI ALERT Rl SITE AREA EMERGENCY Rl GENERAL EMERGENCY but was mitigated prior to classification. Current event status is at a(n):
Rl UNUSUAL EVENT E] ALERT E] SITE AREA EMERGENCY declared at hours on
/
/
based on EAL(s):
(Time)
(Date)
- d. General Emergency protective actions are being changed at hours on
/ /
(Time)
(Date)
- 4. Brief non-technical description of event:
- 5. [
- a. NO unplanned radioactive release has occurred.
El
- b. An unplanned radioactive release is in progress.
- 6. Utility recommended protective actions:
Fl a. None.
Fl b. Evacuation of people in Subareas: 1 2
3 4
5 6
7 Lake Erie (circle)
- 7. I repeat, this is a(n):
13 Actual Emergency El Drill COMMENTS:
Notification is due at:
hours on I
I (Time)
(Date)
EMERGENCY COORDINATOR APPROVAL (signature)
INITIAL NOTIFICATION PNPP No. 7794 Rev. 9/17/01 Page 2 of 2 EPI-Bi COMMUNICATOR INSTRUCTIONS:
A. Ensure Items 1-7 (page 1) are completed, and Emergency Coordinator has approved release of information.
B. Pickup the "5-Way" Ringdown. As parties answer, perform a roll call to verify that the State and county agencies listed below are on-line; record time contacted below. If party does NOT answer, initiate a separate call per EPI-B1.
5-WAY USED?
5-WAY USED?
TIME CONTACTED YES NO TIME CONTACTED YES NO ASHTABULA COUNTY E_
D
]
LAKE COUNTY El E GEAUGA COUNTY fl STATE OF OHIO Il Read the following: "Please obtain an Initial Notification form to copy this transmission. Communication on the "5-Way" Circuit is being recorded." (Pause 5-10 seconds to allow agencies to obtain form before continuing.) Read the following: "The current date and time is: date
/
I time."
C. Transmit data on page 1. When completed, record the name of contact below; request a call back if the 5 Way was NOT used.
NOTE: The following step can be done in parallel with step C. above if additional communicators are available.
D. Once State and county agencies have been contacted, initiate call on NRC ENS Circuit. Read the following:
"The following is a communication from the Perry Nuclear Power Plant. Communication on the ENS Circuit is being recorded."
E. Transmit data on page 1. When completed, record the name of contact below; request a call back if the ENS was NOT used.
TIME NRC CONTACTED:
If the "5-Way" Ringdown or ENS Circuit was NOT used, a verification call back is required.
TIME OF CALLBACK ORGANIZATION PERSON CONTACTED JOB TITLE (If Applicable)
Ashtabula County l] N/A Geauga County
[ZN/A Lake County w N/A State of Ohio
[ZN/A Nuclear Regulatory KIN/A Commission COMMON OFFSITE ACRONYMS:
SD Sheriffs Department EOC Emergency Operations Center HP Highway Patrol EMA Emergency Management Agency OSHP Ohio State Highway Patrol OEMA Ohio Emergency Management Agency Communicator(s) Name: (1)
(2)
[TSC & EOF ONLY]
Forward a copy of completed form to the Information Liaison and Regulatory Affairs Coordinator.
EPI-BI Page:
3 Rev.:
11 4.2 TSC Operations Manager
- 1.
Ensure the coordinated turnover of offsite agency and Perry Plant ERO notification responsibilities from the Control Room Shift Manager to the TSC per <EPI-A6>, and the subsequent transfer of only offsite notification duties to the Emergency Operations Facility (EOF) when operational.
4.3 EOF Emergency Coordinator
- 1.
Ensure the coordinated turnover of offsite agency notification responsibilities from the TSC to the EOF per <EPI-A8>.
4.4 TSC Administrative Assistant/EOF Manager
- 1.
Coordinate the preparation, approval, and transmission of required notifications and periodic updates to the Nuclear Regulatory Commission (NRC),
State of Ohio, local counties, and Industry support organizations.
4.5 Control Room Communicator(s)
- 1.
I&C Technicians and Control Room Assistant (CRA) on shift will report to the Control Room upon declaration of an emergency, or as directed by the Shift Manager, to act as the Control Room Communicator.
- 2.
Conduct notifications of County, State and Federal agencies and Industry support organizations, as directed.
- 3.
Relocate to the TSC, when directed, to support the transfer of communication responsibilities to the TSC.
4.6 TSC/EOF Communicator(s)
- 1.
Conduct notifications of County, State and Federal agencies, and Industry support organizations, as directed.
- 2.
Contact additional ERO personnel, as directed, to augment or in relief of facility staff.
5.0 ACTIONS 5.1 Shift Manager/TSC Operations Manager/EOF Emergency Coordinator 5.1.1 If the site is inaccessible due to security reasons such as station isolation or hostile intrusion, determine in coordination with the Shift Nuclear Security Officer, safe movement of on site personnel including those responding to emergency response facilities.
Offsite personnel responding to an onsite emergency response facility will be directed to the Ashtabula Service Center to activate their respective back-up and alternate emergency response facility and await further direction from the emergency coordinator.
EPI-BI Page:
4 Rev.:
11 5.1.2 Refer to Section 5.4.1 for notifications performed from the Remote Shutdown Panel due to a Control Room evacuation.
5.1.3 Perform the following to ensure that the local counties, the State of Ohio, and the NRC are notified of the:
(1) classification or classification of an event per <EPI-Al>,
(2) issuance of an offsite protective action recommendation (PAR),
or (3) event termination, and entry into the Recovery Phase if applicable, using an Initial Notification Form (PNPP No.
7794, Attachment 2).
<P00031>
- 1.
Draft, or direct assigned/available staff to draft an initial notification message using the Initial Notification form.
NOTE:
The TSC Administrative Assistant and EOF Manager coordinate the drafting of offsite notifications.
- a.
When termination criteria for Unusual Event are met at time of classification per <EPI-Al>, use Blocks 3.a and 3.b on the Initial Notification form to simultaneously classify and terminate event.
- b.
Use Block 3.c on the Initial Notification form for documenting the classification of a "transitory event" per
<EPI-Al>.
- c.
If the emergency classification has changed more than once since the last notification, use an Initial Notification form to update off-site agencies of the current emergency classification and provide a discussion for any previously unreported classification.
Document additional discussions in the Shift Log or Facility Log.
- 2.
Within approximately 10 minutes of the classification, reclassification, decision to issue an offsite PAR, or termination, review the completed form ensuring that all item blocks on the Initial Notification form are completed, then sign as approved and forward to the CR Communicators, TSC Administrative Assistant, or EOF Manager.
Fifteen (15) minutes is the guideline for performing an initial notification to the State of Ohio and local counties; however, at least 5 minutes must be allotted for communicator(s) to contact offsite agencies.
<P00001>
The NRC shall be notified immediately upon completion of notifications to the State and local counties, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of event declaration.
<P00062>
5.1.4 Ensure that an individual knowledgeable in system operations, when available, is assigned to the NRC Emergency Notification System (ENS)
Circuit in the TSC or Control Room. outlines a list of sample questions that may be asked by the NRC during an emergency.
EPI-BI Page:
6 Rev.:
11
- 1.
The Industry Event Notification form will also be used to request the following assistance from INPO:
The TSC Plant Technical Engineer should serve as the point of contact for all requests through INPO for industry assistance. I Facilitating technical information flow to the nuclear industry by maintaining the NUCLEAR NETWORK.
Dispatching an INPO Liaison to the affected plant/utility to facilitate utility interface with INPO and its industry resources.
Locating replacement equipment and/or industry personnel with special technical expertise.
- 2.
Suspend periodic updates to INPO, and direct requests for Industry assistance through the INPO Liaison upon arrival, if requested.
Responsibility for periodically updating INPO and NEIL will be transferred to EOF when operational.
However, the TSC can continue to request assistance from INPO directly using the first page of the INPO Event Notification Guidelines form.
5.1.9 Ensure that any communication problems identified are reported in accordance with <PSI-0007> and that appropriate corrective action is taken.
5.1.10 Ensure that responsibility for offsite notifications is clearly transferred between emergency facilities per <EPI-A6> and <EPI-A8>.
- 1.
Coordinate the relocation of Control Room Communicators to the
- TSC, if necessary, to expedite transfer of offsite communications out of the Control Room.
5.1.11 Upon the decision to reclassify the event or issue a revised offsite PAR, perform an initial notification to the State of Ohio, local counties, and NRC per Section 5.1.2.
5.1.12 Upon termination of an event, and entry into the Recovery Phase if appropriate, direct the following:
- 1.
Ensure that the frequency and points of contact for further updates to offsite agencies has been identified as part of pre recovery planning per <EPI-Al0>,
if applicable, and responsibility for completing these assigned.
- 2.
Direct the notification of the State of Ohio, local counties, and the NRC per Section 5.1.2.
- 3.
Direct that INPO and NEIL is notified of event termination per Section 5.1.6.
INITIAL NOTIFICATION PNPP No. 7794 Rev. 9/17/01 Page 1 of 2 EPI-B1
- 1. This is the Perry Nuclear Power Plant:
El Control Room E] Technical Support Center (TSC) [I Emergency Operations Facility (EOF)
El Backup EOF (Communicator, State your NAME and ERO POSITION TITLE.)
- 2. This is a(n):
El Actual Emergency El Drill For step 3 below. Use only step 'a' when classifying or reclassifying an event Use both steps 'a' & 'b' when simultaneously classifying and terminating from an Unusual Event or Alert. Use step 'c' when classifying after a transitory event Use step 'd' when revising a protective action recommendation.
- 3. a. A (n) El UNUSUAL EVENT [] ALERT E] SITE AREA EMERGENCY [] GENERAL EMERGENCY has been declared at hours on I I based on EAL(s):
Page: 6 19 / C-5
- b. The emergency situation has been terminated at hours on (Time)
(Date)
- c. A transitory event has occurred which would have required the declaration of a(n):
El ALERT El SITE AREA EMERGENCY El GENERAL EMERGENCY but was mitigated prior to classification. Current event status Is at a(n):
El UNUSUAL EVENT
[] ALERT
[] SITE AREA EMERGENCY declared at hours on I I based on EAL(s):
(Time)
(Date)
- d. General Emergency protective actions are being changed at hours on I I (Time)
(Date)
- 4. Brief non-technical description of event:
5i E]
- a. NO unplanned radioactive release has occurred.
E]
- b. An unplanned radioactive release is in progress.
- 6. Utility recommended protective actions:
El a. None.
Fl b. Evacuation of people in Subareas: 1 2 3
4 5
6 7
Lake Erie (circle)
- 7. I repeat, this Is a(n):
El Actual Emergency COMMENTS:
Notification Is due at:
hours on
/
I (Time)
(Date)
EMERGENCY COORDINATOR APPROVAL (signature)
[] Drill EPI-BI Rev. : 10 Sheet 1 of 2
EPI-B8 Page:
3 Rev.:
8/
C-5 3.5 Committed Effective Dose Equivalent (CEDE)
The sum of the products of the weighting factors applicable to each of the body organs or tissues and the CDE to these organs or tissues.
CEDE is the internal dose component of TEDE.
3.6 Total Effective Dose Equivalent (TEDE)
Sum dose of DDE (external dose) and CEDE (internal dose).
3.7 Derived Air Concentration (DAC)
The concentration of a given radionuclide in air which, if breathed by the reference man for a working year of 2,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> under conditions of light work (inhalation rate of 1.2 cubic meters of air per hour), results in an intake of one Annual Limit on Intake (ALI) per PAP-0114.
3.8 Radiation Emergency Assistance Center/Training Site (REAC/TS)
REAC/TS is operated by the Medical Sciences Division of the Oak Ridge Institute for Science and Education for the U.S. Department of Energy (DOE).
REAC/TS provides 24-hour direct or consultative assistance with medical and health physics problems associated with radiation accidents in local, national, and international incidents.
4.0 RESPONSIBILITIES 4.1 Emergency Coordinator
- 1.
Approve plume exposure pathway protective action recommendations (PARs) for the general public.
- 2.
Notify the State of Ohio, local counties, and Nuclear Regulatory Commission (NRC) of changes in PARs for the general public developed by the Perry Plant.
- 3.
Approve the use of Potassium Iodide (KI) by Radiation Monitoring Team (RMT) personnel.
4.2 TSC Operations Manager
- 1.
Assume the responsibilities of the Emergency Coordinator prior to the Emergency Operations Facility (EOF) being operational.
- 2.
Approve the usage of Potassium Iodide (KI) for all onsite Emergency Response Organization (ERO) personnel.
<P00011>
4.3 Shift Manager
- 1.
Assume the responsibilities of the TSC Operations Manager prior to the Technical Support Center (TSC) being operational.
EPI-B8*
Page:
6 Rev.:
8 / C-5
- 4.
Periodically reView the PAR based on degrading plant conditions or changes in wind direction or other meteorological conditions to ensure that required protective actions are being considered in accordance with the PAR logic outlined in Attachments 2 and 3, as appropriate.
<P00029>
- 5.
Assist in completing appropriate portions of the Initial Notification (PNPP No.
7794) and Follow-Up Notification (PNPP No.
7795).
- 6.
Ensure the coordinated turnover of PAR development and review duties from the Control Room to the TSC, and subsequently to the EOF.
5.1.3 Emergency Coordinator:
- 1.
Determine if the appropriate method was used to determine the PAR using the PAR Decision Flow Chart (Attachment 1).
- 2.
Approve PARs for the general public developed utilizing the following methods and ensure that the State of Ohio, local counties, and the NRC are notified per <EPI-Bl>:
General Emergency Default PAR (Attachment 2)
PAR Based on Actual or Projected Dose (Attachment 3)
If a PAR based on an actual or projected dose can not be determined within 10 minutes of the declaration of the General Emergency, use the default PAR developed per.
- 3.
Ensure that PAR is periodically evaluated based on degrading plant conditions or changes in wind direction or other meteorological conditions using Attachments 2 and 3, as appropriate.
<P00029>
- 4.
Ensure the timely and coordinated turnover of PAR approval duties from the Control Room to the TSC, and subsequently to the EOF, when the non-delegatable Emergency Coordinator responsibilities are transferred per <EPI-A2>.
5.2 Potassium Iodide (KI) Distribution to Onsite Emergency Response Organization (ERO)
Personnel
<H00022, H00024>
NOTE:
Recommending the use of KI by the general public is the responsibility of the local County officials.
The Perry Plant is not responsible for recommending the use of KI for the general public.
EPI-B8 Rev.:
8 GENERAL EMERGENCY DEFAULT PAR The following protective action recommendations (PARs) are based on the potential for a major release of radioactive material from the Perry plant per the guidance set forth in Supplement 3 to <NUREG-0654/FEMA-REP-l>.
The intent of these PARs is to provide a means of promptly implementing a minimum evacuation for the general public within 5 miles of the Perry Plant until a detailed assessment can be performed.
Implict in these PARs is that assessment actions will continue to determine what additional protective actions are required to ensure the health and safety of the general public.
The minimum PARs based on wind direction (FROM) for the declaration of a General Emergency, as applicable for Subareas 1, 2, 3 and/or Lake Erie (as identified on 10-Mile EPZ Sectors Versus Subareas Map (Attachment 4]),
are as follows:
WIND DIRECTION -
"FROMS" (in degrees)
AFFECTED SUBAREAS 102 to 213 EVACUATE 1 & Lake 214 to 281 EVACUATE 1, 2 & Lake 282 to 11 EVACUATE 1, 2 & 3 12 to 33 EVACUATE 1 & 3 34 to 101 EVACUATE 1, 3 & Lake These PARs assume that.a General Emergency has been declared per the criteria established in <EPI-Al>.
<P00037>
)
Page:
12 V C-5
EPI-B8 Rev.:
8 PAR BASED ON ACTUAL OR PROJECTED DOSE IF TEDE k 1 REM OR CDEct 2 5 REM FRC( 5 TO 10MILES, recommend.one of the following based on wind direction (FROM):
WIND DIRECTION (FROM)
AFFECTED SUBAREA(S) 102 to 213 degrees EVACUATE 1 & Lake 214 to 258 degrees EVACUATE 1, 2, 4 & Lake 259 to 281 degrees EVACUATE 1, 2, 4, 5 & Lake 282 to 303 degrees EVACUATE 1, 2, 3,'4 & 5 304 to 326 degrees EVACUATE 1, 2, 3, 4, 5 & 6 327 to 348 degrees EVACUATE 1, 2, 3, 5 & 6 349 to 11 degrees EVACUATE 1, 2, 3, 5, 6 & 7 12 to 33 degrees EVACUATE 1, 3, 6, & 7 34 to 56 degrees EVACUATE 1, 3, 6, 7 & Lake 57 to 101 degrees EVACUATE 1, 3, 7 & Lake Page:
13 /C-2
t2j cr