PERRY INITIAL LICENSE EXAM MARCH 5 THRU 13, 2002 Form ES-401-10, "Record of Rejected K/As"

ES-401 Record of Rejected K/As WO)

Form ES-401-10 j

Tier/Group Randomly Selected K/A Reason for Rejection 1 / 1 500000EA1.05 No wetwell sprays at facility 1 / 2 295016AA1.03 RPIS not relevant to selected APE for facility 2 / 1 218000A1.02 Facility does not have ADS acoustic sensors 2 /1 259002A2.08 Facility does not have FWCI (BWR-6) 2 / 1 203000K4.11 Facility does not have RHR Loop selection logic (BWR-6) 2 / 2 300000K3.03 Single unit facility does not have unit cross-ties for instrument air 1 / 1 295024EK2.01 Tier 1 Group 1 has more questions than available systems for RO level. EK2 for same EPE was previously selected. This topic was rejected to minimize chance for redundant questions. Additionally, this topic has a lower K/A value 2 / 2 239001 K1.13 System interaction with suppressed system (MSIV Leakage control) 2 /1 223001 K6.12 Replaced by plant specific priority 2/1 217000K5.03 Replaced by plant specific priority 1/ 2 600000AA2.06 After further scrutiny unable to write a viable exam question. It was determined this APE topic not applicable to Perry. The new topic 1__/_2 600000AA2.06

_(AA2.17) also has a higher Importance Rating.

2 / 1 261 QOKi.09 After further scrutiny, unable to write a viable exam question. It was determined this APE topic not applicable to Perry. There is no 2_/_1 261000K1.09

_relationship between AEGTS and Primary Containment Isolation System at Perry.

2 / 2 263000K4.01 After further scrutiny, unable to write a viable exam question. It was determined this APE topic not applicable to Perry. The new topic (K4.02) also has the same Importance Rating.

NUREG 1021, Revision 8, Supplement 1

+

+

1-

+

4-4-

1 i

i Page 15 of 15 Perry Final - Revision 1

ES-401 Record of Rejected K/As SZo I

Form ES-401-10 Tier/Group Randomly Selected K/A Reason for Rejection 1 /1 500000EA1.05 No wetwell sprays at facility 1 /1 295016AA1.03 RPIS not relevant to selected APE for facility 2 /1 218000A1.02 Facility does not have ADS acoustic sensors 2 / 1 259002A2.08 Facility does not have FWCI (BWR-6) 2 / 1 203000K4.11 Facility does not have RHR Loop selection logic (BWR-6) 2 / 2 300000K3.03 Single unit facility does not have unit cross-ties for instrument air 2/3 239001 K1.13 System interaction with suppressed system (MSIV Leakage control) 1 / 1 295037EA1.07 EPE topic area interfacing with suppressed system (RMCS) 1 / 1 295014AK1.04 Facility does not use PCIOMR 2 / 1 223001 K6.12 Replaced by plant specific priority 2 / 1 217000K5.03 Replaced by plant specific priority This APE should have been a 'common' question (RO and SRO). This change will reduce the total number of exam questions by one. The 1 / 1 295007AK2.04 new topic (AA2.01) also has a higher Importance Rating.

After further scrutiny unable to write a viable exam question. It was determined this APE topic not applicable to Perry. The new topic 1/ 2 600000AA2.06 (AA2.15) also has a higher Importance Rating.

2 / 2 271000A2.14 After further scrutiny, unable to write a viable exam question. The new topic (A2.02) also has a higher Importance Rating.