Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02080077113 March 2002Summary of Facility Changes, Tests & Experiments Implemented During 2001Safe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Hydrostatic
Probabilistic Risk Assessment
Reserve Station Service Transformer
Operating Basis Earthquake
Nondestructive Examination
Temporary Modification
Design basis earthquake
Large early release frequency
Exemption Request
Earthquake
Fuel cladding
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML02087027422 March 2002Emergency Response Data System Database Updates
ML02219062730 July 2002Virginia Electric and Power Co., (Dominion) North Anna Power Station Unit 2 Final Inservice Inspection Summary ReportWeld Overlay
ML0222702432 August 2002Small Break LOCA Evaluation in Support of Proposed Technical Specifications Changes & Exemption Request Use of Framatome Anp Advanced Mark-BW FuelLoop seal
Exemption Request
ML02246047422 August 2002Ventilation Radiation Monitor System Supplemental Special ReportGrab sample
ML0234303432 December 2002Response to Request for Additional Information, Dominion'S Reload Nuclear Design Methodology Topical Report
ML03189033710 July 2003Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Millstone, NortEnforcement Discretion
ML0332805336 November 2003Federal Consistency Certification Under the Coastal Zone Management Act, Virginia Coastal Resources Management Program: North Anna Early Site Permit Application
ML04245016431 August 2004Transmittal of Fitness-for-Duty Program Semi-Annual Performance Data Report for Millstone, North Anna, and Surry Power StationsFitness for Duty
ML04271018624 September 2004Emergency Response Data System (ERDS) Database Revisions
ML04271018824 September 2004Emergency Response Data System (ERDS) Database Revisions. Unit 2 Updated Date Points Library Sheets
ML05053003921 February 2005Fitness-for-duty Program Semi-Annual Performance Data ReportFitness for Duty
ML05054030422 February 2005Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of InformationFitness for Duty
ML05060012028 February 2005Owner'S Activity ReportsVT-2
Through-Wall Leak
ML05146032525 May 2005.2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement
ML0518804807 July 2005Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML05235011422 August 2005Fitness-For-Duty Program Semi-Annual Performance Data ReportFitness for Duty
ML05235048422 August 2005Owner'S Activity ReportsVT-2
ML06026004125 January 2006Virginia Electric and Power Company North Anna Power Station Unit 2 - Owner'S Activity ReportsThrough Wall Leak
ML06094042027 March 2006Summary of Facility Changes, Tests and ExperimentsHigh Radiation Area
Grab sample
Coatings
ML06233007116 August 2006Fitness-for-Duty Program Semi-Annual Performance Data ReportFitness for Duty
ML06341016227 February 2006Fitness-For-Duty Program Semi-Annual Performance Data ReportFitness for Duty
ML07059032727 February 2007Fitness-For-Duty Program Semi-Annual Performance Data ReportFitness for Duty
ML07197047213 July 2007Owner'S Activity Reports, for Refueling Outage (N2R18)Through Wall Leak
ML07270084931 January 2005Caldon Experience in Nuclear Feedwater Flow MeasurementPower change
ML0728205769 October 2007Steam Generator Tube Inspection ReportNondestructive Examination
ML07320023415 November 2007Steam Generator Tube Inspection ReportNondestructive Examination
ML0802800728 January 2008Update on North Anna Zirlo Characterization and LOCA Embrittlement Testing
ML08079034318 March 2008Response to Request for Additional Information Steam Generator Tube Inspection Report
ML08127020325 April 2008Summary of Facility Changes, Tests and Experiments
ML08207019918 July 2008Order EA-03-009 Sixty-Day Report Reactor Pressure Vessel Head Inspection ResultsBoric Acid
VT-2
ML0901304805 January 2009Owner'S Activity Report for Refueling Outage
ML0912504814 May 200930-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML09132063912 May 2009Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-NDE-024 and N2-I3-NDE-025Boric Acid
Weld Overlay
VT-2
Pressure Boundary Leakage
ML0921908944 August 2009Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-AExemption Request
Fuel cladding
ML09299057026 October 2009Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML11031074025 January 2011Owner'S Activity ReportBoric Acid
ML11207014426 July 2011Draft Letter Report, Entitled Risk-Informing EP Oversight: Evaluation of EALs Using Saphia Pilot Study of Peach Bottom and SurryHigh winds
Probabilistic Risk Assessment
Earthquake
Pressure Boundary Leakage
Power change
ML12005A0119 December 2011Independent Spent Fuel Storage Installation Response to EarthquakeEarthquake
ML12024A07828 December 2011State-of-the-Art Reactor Consequence Analysis (Soarca); Exclusive Summary for the Full NUREG for Peach Bottom and SurryProbabilistic Risk Assessment
Large early release frequency
Severe Accident Management Guideline
Earthquake
ML12039A16025 January 2012Steam Generator Tube Inspection ReportNondestructive Examination
ML12039A16125 January 2012Steam Generator Tube Inspection ReportNondestructive Examination
ML12046A84927 February 2012Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010
ML12060A34916 February 2012Owner'S Activity Report for Refueling Outage N2R21
ML12073A3858 March 2012Resources Services, Inc., Notification Letter That Surry Power Station Not Received a Copy of the Waste Shipment Record (Wsr) Signed by the Owner or Operator of the Designated Waste Disposal Site
ML12124A29625 February 2010Soarca Peer Review CommentsInternal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
ML12124A29711 March 2010Soarca Documents Review/Approval Process
ML12160A26811 June 2012Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant AccidentEarthquake