Category:Letter
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24082A2742024-03-22022 March 2024 Request for Approval of Alternative Request N1-I5-NDE-007 to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24086A4682024-03-21021 March 2024 Summary of Facility Changes, Tests and Experiments ML24005A0042024-03-18018 March 2024 Issuance of Amendment Nos. 296 and 279, Regarding Revised Emergency Plan for Relocation of the Technical Support Center 2024-09-24
[Table view] Category:Report
MONTHYEARML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML24032A1112024-02-0101 February 2024 Owners Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23214A1942023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22255A0102022-06-28028 June 2022 Owner'S Activity Report ML22263A2852022-05-23023 May 2022 Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 ML22119A1722022-04-13013 April 2022 Post-Accident Monitoring (PAM) Report ML21333A2842021-11-29029 November 2021 Requal Notification Letter ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21036A0772021-02-23023 February 2021 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20254A3472020-09-0808 September 2020 Supplement to Operator License Examination Comments ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20246G7062020-08-24024 August 2020 Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20149K6712020-05-31031 May 2020 PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis ML20140A2392020-05-18018 May 2020 ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 ML20246G7012020-03-31031 March 2020 Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) ML20090B3972020-03-26026 March 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20246G7072020-01-31031 January 2020 Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal ML19347A4212019-11-26026 November 2019 Owner'S Activity Report ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19106A3562019-04-23023 April 2019 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2018 Refueling Outage ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML20246G7092018-10-31031 October 2018 Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal ML18198A1192018-05-31031 May 2018 Attachment 5 to 18-233, ANP-3467NP, Rev. 0, North Anna Fuel-Vendor Independent Small Break LOCA Analysis Licensing Report ML17186A0842017-06-29029 June 2017 Flooding Focused Evaluation Summary ML16187A3232016-06-24024 June 2016 Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report ML15238A8442015-09-25025 September 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15175A1902015-06-17017 June 2015 Owner'S Activity Report ML15057A2492015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 ML15058A0342015-02-23023 February 2015 Summary of Facility Changes, Tests and Experiments ML14133A0112014-05-0707 May 2014 March 12, 2012 Information Request Phase 2 Staffing Assessment Report ML14080A0022014-03-31031 March 2014 PNNL-22553, Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station. ML14092A4162014-03-31031 March 2014 Response to March 12, 2012 Information Request Seismic Hazard and Screening Report (CEUS Sites)For Recommendation 2.1 ML14084A3272014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14084A2122014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14283A0462014-02-28028 February 2014 MRP-375, Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (EPRI 3002002441), Attachment 1 2024-06-10
[Table view] Category:Miscellaneous
MONTHYEARML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML24032A1112024-02-0101 February 2024 Owners Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22255A0102022-06-28028 June 2022 Owner'S Activity Report ML21333A2842021-11-29029 November 2021 Requal Notification Letter ML21036A0772021-02-23023 February 2021 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage ML20254A3472020-09-0808 September 2020 Supplement to Operator License Examination Comments ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML19347A4212019-11-26026 November 2019 Owner'S Activity Report ML17186A0842017-06-29029 June 2017 Flooding Focused Evaluation Summary ML16187A3232016-06-24024 June 2016 Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report ML15238A8442015-09-25025 September 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15175A1902015-06-17017 June 2015 Owner'S Activity Report ML15057A2492015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 ML15058A0342015-02-23023 February 2015 Summary of Facility Changes, Tests and Experiments ML14084A3272014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14084A2122014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14024A6022014-01-10010 January 2014 Post Accident Monitoring (PAM) Report ML14015A3142014-01-0808 January 2014 Submittal of Owner'S Activity Report Refueling Outage N1R23 (Form OAR-1) ML12160A2682012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident ML12060A3492012-02-16016 February 2012 Owner'S Activity Report for Refueling Outage N2R21 ML12039A1602012-01-25025 January 2012 Steam Generator Tube Inspection Report ML12039A1612012-01-25025 January 2012 Steam Generator Tube Inspection Report ML12005A0112011-12-0909 December 2011 Independent Spent Fuel Storage Installation Response to Earthquake ML1103107402011-01-25025 January 2011 Owner'S Activity Report ML1019304172010-05-0606 May 2010 Tritium Database Report ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0913206392009-05-12012 May 2009 Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-NDE-024 and N2-I3-NDE-025 ML0912504812009-05-0404 May 2009 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0901304802009-01-0505 January 2009 Owner'S Activity Report for Refueling Outage ML0812702032008-04-25025 April 2008 Summary of Facility Changes, Tests and Experiments ML0807903432008-03-18018 March 2008 Response to Request for Additional Information Steam Generator Tube Inspection Report ML0802800722008-01-0808 January 2008 Update on North Anna Zirlo Characterization and LOCA Embrittlement Testing ML0732002342007-11-15015 November 2007 Steam Generator Tube Inspection Report ML0728205762007-10-0909 October 2007 Steam Generator Tube Inspection Report ML0719704722007-07-13013 July 2007 Owner'S Activity Reports, for Refueling Outage (N2R18) ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0623300712006-08-16016 August 2006 Fitness-for-Duty Program Semi-Annual Performance Data Report ML0609404202006-03-27027 March 2006 Summary of Facility Changes, Tests and Experiments ML0634101622006-02-27027 February 2006 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0602600412006-01-25025 January 2006 Virginia Electric and Power Company North Anna Power Station Unit 2 - Owner'S Activity Reports ML0523501142005-08-22022 August 2005 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0514603252005-05-25025 May 2005 .2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement ML0505403042005-02-22022 February 2005 Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of Information ML0505300392005-02-21021 February 2005 Fitness-for-duty Program Semi-Annual Performance Data Report ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement 2024-02-22
[Table view] |
Text
Dominion Resources Services, Inc.
~()()() Dominion Boulevard, Glen Allen, VA 2,)1 Ji" I
\X'd) Address: www.dom.com October 9, 2007 U.S. Nuclear Regulatory Commission Serial No. 07-0583 Attention: Document Control Desk NL&OS/ETS Washington, D.C. 20555 Docket No. 50-339 License No. NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 2 STEAM GENERATOR TUBE INSPECTION REPORT Pursuant to Technical Specification 5.6.7 for North Anna Power Station Unit 2, Dominion is required to submit a 180-day steam generator tube inspection report. The attachment to this letter provides the steam generator tube inspection report for the North Anna Unit 2 spring 2007 refueling outage.
This letter does not establish any new commitments. Should you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours, C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
for Virginia Electric and Power Company Attachment
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 Mr. R. A. Jervey NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, Maryland 20852 Mr. S. P. Lingam NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mai I Stop 0-8 G9A Rockville, Maryland 20852
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report ATTACHMENT NORTH ANNA UNIT 2 180-DAY NRC REPORT REGARDING STEAM GENERATOR TUBE INSPECTION PER TECHNICAL SPECIFICATION 5.6.7
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report Page 1 of 4 NORTH ANNA UNIT 2 - SPRING 2007 The following satisfies the North Anna Power Station Technical Specification (TS) reporting requirement section 5.6.7. During the North Anna spring 2007 refueling outage, steam generator inspections in accordance with TS 5.5.8.d were completed for two of the three steam generators ("A" and "C"). This was the initial inspection under the modified Technical Specifications resulting from the TSTF-449 generic specification issued to the industry. Consequently, the referenced outage is the starting point for compliance to the periodicity and tube inspection coverage requirements of 5.5.8.d.
Italicized wording represents TS verbiage. The required information is provided under each reporting requirement as follows:
A report shall be submitted within 180 days after the initial entry into Mode 4 following completion of an inspection performed in accordance with the Specification 5.5.8, "Steam Generator (SG) Program." The report shall include:
- 8. The scope of inspections performed on each SG The following primary side inspections were performed in steam generators "A" and "e"
- 100% full-length inspection utilizing bobbin coil probe for all tubes except for Row 1 u-bends
- 20% (719 tubes) hot leg top of tubesheet (+/- 3") utilizing rotating coil probe with tube selection biased toward a secondary side critical area in the sludge zone, peripheral area tubes, and the remainder across the tubesheet
- 100% Row 1 (98 tubes) U-bend region utilizing rotating coil probe
- Special interest inspections of freespan dent/ding/bulges> 2 volts with rotating coil probe
- Inspection of bobbin identified I-codes (Le. possible indications) with rotating coil probe
- Special interest rotating coil probe exams of within tubesheet anomalies; overexpansions The following secondary side inspections were performed in steam generators "A" and "en
- Steam drum upper components visual inspection covering the primary and secondary moisture separators, drain piping, and related components
- Video inspection of the upper tube bundle U-bend area
- Video inspection of the uppermost tube support plate (TSP), i.e. 7th TSP in the periphery area and in-bundle at selected tube columns. The 4th , 5th , and 6th TSPs were video inspected in the center bundle area accessed from the i h TSP.
- Video inspection of the inside interface of the feedring to J-nozzle joints, Le. exit spargers, and ultrasonic thickness inspection of selected feedring components
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report Page 2 of 4
- b. Active degradation mechanisms found No indication of corrosion degradation was observed during this inspection. Through wall (TW) volumetric wear degradation was observed on three (3) tubes adjacent to the support plate TSP quatrefoil contact points on the "e" steam generator. A similar indication was observed on this generator, plugged, and reported in a previous report following the 2001 inspections. Of the three newly observed indications, one was reported at 40% TW and the other two at less than 10% TW.
No degradation of any type was observed on the "An steam generator.
The secondary side inspections on both steam generators indicated no component degradation that would compromise tube integrity.
- c. Nondestructive examination techniques utilized for each degradation mechanism Inspections on both steam generators focused on the following degradation mechanisms listed in Table 1 utilizing the referenced eddy current techniques.
Potential
}/>
-/
Table 1 -Inspection Method for Applicable Degradation Modes Tube Wear ltion Anti-Vibration Bars i .*.*.*.*.*.
> . *.*.*.*.*.* I i
. ** "'...... Jype Bobbin - Detection Bobbin and +Point' - Sizing Bobbin - Detection Potential Tube Wear Flow Distribution Baffle Bobbin and +Point' - Sizing Bobbin - Detection Existing Tube Wear Tube Support Plate Bobbin and +Point' - Sizing Straight Leg & AVB Tangents Bobbin - Detection Potential Tube Wear (Row 8, 14, 26) Bobbin or +Point'- Sizing Tube Wear Bobbin - Detection Existing Freespan and Top-of-Tubesheet (foreign objects) +Point' - Sizing Hot Leg Top-of-Tubesheet Bobbin and +Point'M- Detection Potential ODSCC Sludge Pile Area +Point' - Sizing Hot Leg Top-of-Tubesheet Relevant/Informational Sludge Pile Area PWSCC +Point' - Detection and Sizing Inspection and within Tubesheet Anomaly locations Relevant/Informational ODSCC Row 1 U-bends +Point' - Detection and Sizing Inspection PWSCC Relevant/Informational ODSCC Freespan and Tube Supports +Point' - Detection and Sizing Inspection Relevant/Informational Bobbin and +Point'M - Detection OD Pitting Top-of-Tubesheet Inspection +Point' - Sizing The only degradation noted in (b) above was identified during the bobbin probe examinations on the "e" steam generator. The sizing of the degradation was performed utilizing a rotating coil based eddy current technique.
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report Page 3 of 4
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications No wall loss indications were found during the inspection on the "A" steam generator.
As noted in the response to (b) above, several wear type indications were noted on the "C" steam generator. Table 2, below, provides the detailed information regarding these indications. Also included there is information on a permeability indication (PVN) that could not be resolved due to updated signal to noise requirements in current inspectio ns.
- e. Number of tubes plugged during the inspection outage for each active degradation mechanism Four tubes were plugged during the spring 2007 inspection. Those tubes indicated in Table 2 were plugged. One tube required plugging since it was at the TS plugging limit of 40% TW. The other two wear indications were preventively plugged. The fourth tube was preventively plugged since the permeability indication rendered a significant portion of the tube un-inspectable.
- f. Total number and percentage of tubes plugged to date A total of six (6) tubes have been plugged in the North Anna Unit 2 steam generators, i.e. "A" - 1 (0.03%), "B" - 0 (0%), "C" - 5 (0.14%) with a total percentage of 0.056 %.
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing The condition monitoring evaluation was completed and neither steam generator, "A" or "C", exceeded any performance criteria during the last cycle since the fall 2005 inspection. No findings at the spring 2007 inspection invalidated the previous operational assessment for any of the three steam generators. Condition monitoring requirements were met since the detected flaws TW depth was less than the conservative structural limit for this type of flaw, i.e. 66.4% for bounding 0.6" long 360 degree volumetric degradation. Therefore, no tube pulls or in-situ pressure testing was necessary.
- h. The effective plugging percentage for all plugging in each SG There are no sleeves installed in the North Anna Unit 2 steam generators therefore, the effective plugging percentage remains the same as stated in (f) above.
Serial No. 07-0583 Docket No. 50-339 180-Day SG Report Page 4 of 4 Table 2 - Significant Reported Indications C 13/76 I @3 Hot TSP
-0.62" I Volumetric Damage 0.35" 0.50" 8% I Yes I No Yes I Preventive - Near structural limit @ 3 (1996) cycles of operation 1 C 45/50 I @5 Cold TSP
+0.65" I Volumetric Damage I
0.43" I
0.42" I
8%
I Yes No (2001)
Yes Preventive - Near structural limit @ 3 cycles of operation 1 C 45/51 I @5ColdTSP Volumetric 0.43" 0.48" 40% Yes No Yes At Tech. Spec. as Damage found plugging limit
+0.51" (2001)
C 42/32 I Near full Signal Noise N/A N/A N/A Yes Yes, Yes Preventive - Avoid length of Cold baseline and continuing future (Multiple Leg subsequent magnetic biased Permeability rotating probe Indications) inspections Note 1: Assumes applying maximum observed growth rate of tube 45/51 and 95%/50% probability/confidence for technique and analyst uncertainty.