MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Report
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23214A1942023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22255A0102022-06-28028 June 2022 Owner'S Activity Report ML22263A2852022-05-23023 May 2022 Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 ML22119A1722022-04-13013 April 2022 Post-Accident Monitoring (PAM) Report ML21333A2842021-11-29029 November 2021 Requal Notification Letter ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21036A0772021-02-23023 February 2021 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20254A3472020-09-0808 September 2020 Supplement to Operator License Examination Comments ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20246G7062020-08-24024 August 2020 Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20149K6712020-05-31031 May 2020 PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis ML20140A2392020-05-18018 May 2020 ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 ML20246G7012020-03-31031 March 2020 Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) ML20090B3972020-03-26026 March 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20246G7072020-01-31031 January 2020 Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal ML19347A4212019-11-26026 November 2019 Owner'S Activity Report ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19106A3562019-04-23023 April 2019 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2018 Refueling Outage ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML20246G7092018-10-31031 October 2018 Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal ML18198A1192018-05-31031 May 2018 Attachment 5 to 18-233, ANP-3467NP, Rev. 0, North Anna Fuel-Vendor Independent Small Break LOCA Analysis Licensing Report ML17186A0842017-06-29029 June 2017 Flooding Focused Evaluation Summary ML16187A3232016-06-24024 June 2016 Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report ML15238A8442015-09-25025 September 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15175A1902015-06-17017 June 2015 Owner'S Activity Report ML15057A2492015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 ML15058A0342015-02-23023 February 2015 Summary of Facility Changes, Tests and Experiments ML14133A0112014-05-0707 May 2014 March 12, 2012 Information Request Phase 2 Staffing Assessment Report ML14092A4162014-03-31031 March 2014 Response to March 12, 2012 Information Request Seismic Hazard and Screening Report (CEUS Sites)For Recommendation 2.1 ML14080A0022014-03-31031 March 2014 PNNL-22553, Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station. ML14084A3272014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14084A2122014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14283A0462014-02-28028 February 2014 MRP-375, Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (EPRI 3002002441), Attachment 1 ML13338A4482014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14006A1712014-01-23023 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for North Anna Power Station, Units 1 and 2, TAC Nos.: MF0998 and MF0999 2024-02-01
[Table view] Category:Miscellaneous
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22255A0102022-06-28028 June 2022 Owner'S Activity Report ML21333A2842021-11-29029 November 2021 Requal Notification Letter ML21036A0772021-02-23023 February 2021 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage ML20254A3472020-09-0808 September 2020 Supplement to Operator License Examination Comments ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML19347A4212019-11-26026 November 2019 Owner'S Activity Report ML17186A0842017-06-29029 June 2017 Flooding Focused Evaluation Summary ML16187A3232016-06-24024 June 2016 Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report ML15238A8442015-09-25025 September 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15175A1902015-06-17017 June 2015 Owner'S Activity Report ML15057A2492015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 ML15058A0342015-02-23023 February 2015 Summary of Facility Changes, Tests and Experiments ML14084A3272014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14084A2122014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14024A6022014-01-10010 January 2014 Post Accident Monitoring (PAM) Report ML14015A3142014-01-0808 January 2014 Submittal of Owner'S Activity Report Refueling Outage N1R23 (Form OAR-1) ML12160A2682012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident ML12060A3492012-02-16016 February 2012 Owner'S Activity Report for Refueling Outage N2R21 ML12039A1602012-01-25025 January 2012 Steam Generator Tube Inspection Report ML12039A1612012-01-25025 January 2012 Steam Generator Tube Inspection Report ML12005A0112011-12-0909 December 2011 Independent Spent Fuel Storage Installation Response to Earthquake ML1103107402011-01-25025 January 2011 Owner'S Activity Report ML1019304172010-05-0606 May 2010 Tritium Database Report ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0913206392009-05-12012 May 2009 Reactor Coolant Pressure Boundary Visual Inspections Proposed Alternative - N1-I3-NDE-024 and N2-I3-NDE-025 ML0912504812009-05-0404 May 2009 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0901304802009-01-0505 January 2009 Owner'S Activity Report for Refueling Outage ML0812702032008-04-25025 April 2008 Summary of Facility Changes, Tests and Experiments ML0807903432008-03-18018 March 2008 Response to Request for Additional Information Steam Generator Tube Inspection Report ML0802800722008-01-0808 January 2008 Update on North Anna Zirlo Characterization and LOCA Embrittlement Testing ML0732002342007-11-15015 November 2007 Steam Generator Tube Inspection Report ML0728205762007-10-0909 October 2007 Steam Generator Tube Inspection Report ML0719704722007-07-13013 July 2007 Owner'S Activity Reports, for Refueling Outage (N2R18) ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0623300712006-08-16016 August 2006 Fitness-for-Duty Program Semi-Annual Performance Data Report ML0609404202006-03-27027 March 2006 Summary of Facility Changes, Tests and Experiments ML0634101622006-02-27027 February 2006 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0602600412006-01-25025 January 2006 Virginia Electric and Power Company North Anna Power Station Unit 2 - Owner'S Activity Reports ML0523501142005-08-22022 August 2005 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0514603252005-05-25025 May 2005 .2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement ML0505403042005-02-22022 February 2005 Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of Information ML0505300392005-02-21021 February 2005 Fitness-for-duty Program Semi-Annual Performance Data Report ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0427101862004-09-24024 September 2004 Emergency Response Data System (ERDS) Database Revisions 2024-02-01
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 25, 2011 U.S. Nuclear Regulatory Commission Serial No.: 11-026 Attention: Document Control Desk NAPS/JHL: RO Washington, D.C. 20555 Docket No.: 50-338 License No.: NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 1 OWNER'S ACTIVITY REPORT In accordance with the requirements of American Society of Mechanical Engineers (ASME) Code Case N-532-4, enclosed is the Owner's Activity Report (Form OAR-i), for refueling outage N1 R21. This report is for the first refueling outage of the first period of the fourth inspection interval.
Should you have any questions regarding this submittal, please contact Mr. Donald R.
Taylor at (540) 894-2616.
Very truly yours, F. Mladen Director - Nuclear Station Safety and Licensing Commitments made in this letter: None Attachment A-047
cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 Mr. M. M. Grace Authorized Nuclear Inspector North Anna Power Station
Attachment Owner's Activity Reports for North Anna Unit 1 Refueling Outage NIR21 - First Period of the Fourth ISI Interval North Anna Power Station Virginia Electric and Power Company
FA Ac Rep- o PDominion, Report Number: N1R21 (Unit 1, 4th Interval, 1 st Period)
Plant: North Anna Power Station Unit No. 1 Commercial service date: 6/6/1978 Refueling outage no. N1 R21 (if applicable)
Current inspection interval: 4 th (May 1, 2009 - April 30, 2019)
(1Ts, 2nd, 3 rd, 4 th, other)
Current inspection period: 1s' (May 1, 2009 -April 30, 2012)
( 1 S1, 2 w', 3 ra 4 fl)
Edition and Addenda of Section XI applicable to the inspection plans: 2004 Edition Date and revision of inspection plans: February 2010. Revision 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection Plans N/A Code Cases used: N-432-1, N-460, N-504-3, N-526, N-532-4, N-552, N-566-2, N-586-1, N-597-2, N-613-1.
N-624. N-638-1 N-641 N-651. N-658. N-661. N-663. N-683. N-696. N-706-1. N-722. and N-729-1.
(if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of NiR21 conform to the requirements of Section XI.
(refueling outage number)
Signed - D n 2. Date / ! Zo f
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virginia and employed by HSB CT of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with thig'?spection.
conne1*y Commissions NB 9531-A-N-I-C / VA 424-R Inspector's Signerture National Board, State, Province and Endorsements Date J721zx2,0//I Form No. 729595 (Aug 2009)
Form OAR-I, 0 A a ,
Owner's Activity Report 0 *Jwy 1ý ý w ý! 611
- ý,IDominion-Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number Spring Hanger 1 11/2-RC- Spring hanger's cold load 105/SH-3 setting was beyond readable range. Engineering eval, F-A/ Fl.1OC CR396534, found pipe hung up until jarred loose after work on valve 1-RC-105. Support Summary # N1. F1.10.476 found acceptable.
Spring Hanger 6-CH-19/SH-29 Spring can rod found bowed.
Eval per CR396117 identified F-A/ F1.20C SAT spring can loading and minimal misalignment.
Summary # N1 .F1.20.211 Support found acceptable.
Support 14-RH-2/R-16 2 anchor bolts appeared not seated tightly to base plate.
F-A/ F1.20A Eng. Eval per CR395483 found support meeting design Summary # N1.F1.20.359 basis and bolting fully engaged.
1-RH-MOV-1720A CR395392 Code case N-522-B-P / B15.10 2 evaluation on MOV bolting, acceptable for next operating 1 -PT-48 cycle.
1-RH-MOV-1 701 CR395326 Code case N-522-B-P /B15.10 2 evaluation on MOV bolting, acceptable for next operating 1-PT-304RH cycle.
Spring Hanger 10-CC-B351 / Found outside 10% cold load SH-380 setting. CR395146 eval.
F-A / F1.30C Found within working range for all load cases. Support Summary # N1 .F1.30.601 found acceptable Pipe restraint 6-CC-397 / R- Clearances found out of 376 tolerance. CR394552 F-A / F1.30B evaluated support, found Summary # N1.F1.30.597 acceptable.
1-CH-P-2B Excessive inactive boric acid at bolting, evaluated per D-B / D2.10 CR392333, no degradation.
Acceptable for continued 1 -PT-302CH service.
Form No. 729595 (Aug 2009)
Form OAR-I, Owner's Activity Report FW;Dominion E-A IS10 ATAHMN 1 'Pg 30 of0 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Date Repair/Replacement Class Item Description Description of Work Completed Plan Number Repair weld/base 1 1-RC-HSS-115B metal by metal 12/18/09 2009-137 removal 2 1-BD-119 Clamp Valve and 1/26/10 2009-141 Piping Appendix IX 1 1-RC-HSS-818 Replace Snubber 10/1/10 2010-210 2 1-QS-37 Valve Bonnet Weld 10/20/10 2010-215 Repair 3 1-CC-PH-R- Replace nut and 9/30/10 2010-222 329.76A realign support clamp 2 1-RS-HSS-208A Replace Snubber 1/1/10 2010-225 3 W-PP-20.00- Window joint repair on 10/20/10 2010-130 WS-PIPE-E23- pp 02/0 21-3 151-Q3 pipe 3 1 -QS-38 Replace Bonnet 10/2/10 2010-197 Bolting 1-SW-PPA-1A1- Install new SW Spray 3 ARRAY Array and modify 5/6/10 2008-137 supports 1-SW-PPA-1 B2- Install new SW Spray 3 ARRAY Array and modify 6/1/10 2008-130 supports Form No. 729595 (Aug 2009)