Dominion Resources Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA L 3060 January 25, 2006 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 k
Dominion@
Serial No.06-009 NL0SIETS:vl h Docket No. 50-339 License No. NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 2 OWNER'S ACTIVITY REPORTS In accordance with the requirements of ASME Code Case N-532-1, enclosed are the Owner's Activity Reports (Form OAR-I), for the N2R17 refueling outage.
This information completes the reporting requirements for North Anna Unit 2's first period and the first refueling outage in the second period of the third ten-year interval.
Should you have questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours, C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc. for Virginia Electric and Power Company Enclosures
Serial No.06-009 Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr. (letter only)
Old Dominion Electric Cooperative lnnsbrook Corporate Center 4201 Dominion Boulevard Suite 300 Glen Allen, Virginia 23060 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, Maryland 20852 Mr. M. M. Grace Authorized Nuclear Inspector North Anna Power Station
Enclosure Serial No.06-009 Owner's Activity Report 3rd Interval - 1 Period 3rd Refueling outage Virginia Electric and Power Company (Dominion)
North Anna Unit 2
NORTH ANNA POWER STATION, N2R17 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT
?rd Report Number: N3R17a wit 2,.
Owner Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 (Name and Address of Owner)
(Name and Address of Plant)
Unit No 2
Commercial service date 12/14/1980 Refueling outage no N2R17 (6/1/04-10/30/05)
Current inspection interval (I?,ULOI
- i?/i-uin\\
Current inspection period is' (13/14/ni - 17/i?/ari)
( I s t, Znd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan Plant-,
P 0 E h x x M m x a l VA 731 17 (If applicable)
(1st, 2nd 3rd, 4th, other) 1995 Edition 1996 Addenda Date and revision of inspection plan Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan IS1 Plan Rev 4 dated 8/05 including the IS1 Schedule Revision 7, dated 1/06 Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements. evaluations, and corrective measures represented by this report conform to the requirements of Section XI Certificate of Authorization No.
N/A Expiration Date NIA (Owner's or Owner's Designee, Title)
CERTIFICATE OF INSERVICE INSPECTION I,
the undersigned, holding a
valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virqinia and employed by HSB CT of Hartford, CT have inspected the items described in this Owner's Activity Report, during the period 6/1/04 to 10/30/05, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
% L b f l m, &dF, Commissions VA 424-R Inspector's Signature National Board, State, Province. and Endorsements Date 2 /
t? L"
Examination Total Examinations Required For The Znterval North Anna Power Station N2R17 OUTAGE Form OAR-1 Owner's Activity Report Table 7 Abstract Of Examinations And Tests Total Examinations Credited (%)
For The Period
.oo 100.00 100.00 Total Examinations Credited For This Period Total Examinations Credited (%) To Date For The Znterval Remarks
.oo 25.93 23.08
.oo 1.67 6.00 B-A B-B B-D 8.67 9.00 52.00 B-G-1 650.00 196.00 100.00 B-G-2 29.00 11.oo 100.00 B-K 14.00 4.33 100.00 B-L-1 1.oo
.oo
.oo B-N-1 3.00 1.OO 100.00 6-N-2 1.oo
.oo
.oo B-N-3 1.oo
.oo
.oo B-0 3.00
.oo
.oo B-P 6.00 2.00 100.00 6-Q 4.00 1.OO 100.00 C-A 7.00 1.67 100.00 C-B 16.00 5.00 100.00 c-c 29.00 10.00 100.00 C-D 16.00 5.00 100.00 C-F-1 97.00 35.00 100.00 C-F-2 20.00 6.00 100.00 C-G 2.00
.oo
.oo 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
Note 1 Note 1 41.85 37.93 30.95
.oo Note 2 33.33
.oo
.oo Note 3 33.33 Note 4 25.00
.oo 23.81 31.25 41.38 62.50 56.70 55.00
.oo
Total Examinations Credited For This Period Total Total Examinations Examinations Credited (%)
Credited (%) To For The Period Date For The Interval Examination CategoQ' Total Examinations Required For The Interval Remarks C-H D-A Note 5 3.00 21.oo Note 5 Note 5
.oo 10.00
.oo
.oo 57.14 100.00 D-B I
I I
I I
I
.oo
.oo 3.00
.oo L
F-A 413.00 56.00 R-A 8
141.00 100.00 46.49 42.86 Note 6 16.00 lon nn
North Anna Power Station N2R17 OUTAGE Form OAR-1 Owner's Activity Report Table 1 Notes
'Abstract Of Examinations And Tests Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Examinations are limited to components selected for examination.
Internal emmination is required only when a pump is dissembled for maintenance, repair, or examination. 6-L-1 has one scheduled examination of the external surface of one pump casing in accordance with Code Case N-481.
Category B-0 is scheduled to be examined as part of the reactor vessel examination in the third period.
The Class 1 leakage test is required to be performed every refueling outage. The number and percentages listed represent the total number of refueling outages anticipated over the inspection interval. All required system pressure tests have been completed.
The number and percentages listed represent the total number of periods over the inspection interval. All required system pressure tests have been completed.
The risk informed program currently addresses categories B-F and 6-J. See Partial Examination attachment.
Partial Examinations N2R17a CATEGORY ITEM DRAWING LINE NUMBER EXAM REMARKS R-A R1.11 12050-W MKS-Ol09D 14"-RC-410-2501 R-Q1 5w-5 75% UT EXAMINATION DUE TO COMPONENT CONFIGURATION
Exam Category NORTH ANNA POWER STATION N2R17 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Item Number Flaw Characterization II WA-3300)
Flaw or Relevant Condition Found During Scheduled Section XI Exam or Test (Yes or No)
There were no items with flaws or relevant conditions that required evaluation for continued service during N2R17
Code Class Repair, Replacement, or Corrective Measure NORTH ANNA POWER STATION N2R17 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Item Description of Description Work Flaw or Relent Condition Found During Scheduled Section XI Examination or Test (Yes or No\\
Date Completed Repair1 Replacement Plan Number There were no repairs, replacements or corrective measures required for continued service
Encl 0s u re Serial No.06-009 Owner's Activity Report 3rd Interval - lS' Period Post 3rd Refueling outage Virginia Electric and Power Company (Dominion)
North Anna Unit 2
NORTH ANNA POWER STATION, N2R17 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT rd Report Number: N7R17h (ulllt '2, 3 IWl, 1st P-3rd Owner: Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant-P 0 Rnx 731 17 (Name and Address of Owner)
(Name and Address of Plant)
Unit No 2
Commercial service date 12/14/1980 Refueling outage no.*10/31/2005-12/13/2005 (If applicable)
Current inspection interval Current inspection period is' (17/14/ni - 17/111oy (1st, Znd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan 71d ( 1 7 / 1 m i - i m w i m (1st, 2nd, 3rd, 4th, other) 1995 Edition 1996 Addenda
~
~
~~
~
Date and revision of inspection plan IS1 Plan Rev 4 dated 8/05 including the IS1 Schedule Revision 7 dated 1/06 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs.
replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorization No.
NIA Expiration Date N/A r
(Owner's or Owner's Designee, Title)
CERTIFICATE OF INSERVICE INSPECTION I.
the undersigned, holding a
valid commission issued by the National Board of Boiler and Pressure Vessel Hartford, CT have inspected the items described in this Owner's Activity Report, during the period 10/31/05 to 12/13/05, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements oi Section XI.
Inspectors and the State or Province of Virainia and employed by HSB CT of By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 424-R Inspector's Signature National Board, State, Province. and Endorsements
Examination Total Examinations Required For The Interval North Anna Power Station N2R17 OUTAGE Form OAR-1 Owners Activity Report Table 1 Abstract Of Examinations And Tests Total Examinations Credited (%)
For The Period Total Examinations Credited For This Period Total Examinations Credited (%) To Date For The Interval Remarks
.oo B-A B-B B-D B-G-1 B-G-2 B-K 1.67 8.67 9.00 52.00 650.00 29.00 14.00 6.00 196.00
.oo 100.00 11.oo 4.33
.oo 25.93 100.00 100.00 100.00 100.00
.oo 100.00
.oo
.oo
.oo 100.00 I
I 23.08 Note 1 41.85 37.93 Note 1 30.95
.oo Note 2 33.33
.oo
.oo Note 3 33.33 Note 4
.oo B-L-1 B-N-1 B-N-2 I
I I
1.oo
.oo 3.00 1.00 1.oo
.oo B-N-3 B-0 B-P 1.oo
.oo 3.00
.oo 6.00 2.00 B-Q 100.00 4.00 1.OO I
25.00 C-A C-B c-c C-D C-F-1 C-F-2 C-G 23.81 100.00 7.00 1.67 16.00 5.00 100.00 31.25 29.00 10.00 100.00 41.38 16.00 5.00 100.00 62.50 97.00 35.00 100.00 56.70 55.00 20.00 6.00 100.00 2 00
.oo
.oo
.oo
Total Examinations Credited (%)
For The Period Total Examinations Credited (%) To Date For The Interval Remarks Total Examinations Credited For This Period Examination CategoQ' 1.oo 10.00 Total Examinations Required For The Interval C-H D-A 100.00 3.00 21.oo I
33.33 57.14 100.00 I
Note 5 D-B F-A R-A I
3.00 1.oo 33.33 Note 5 100.00 41 3.00 141.00 100.00 46.49 56.00 16.00 100.00 42.86 Note 6
North Anna Power Station N2R17 OUTAGE Form OAR-1 Owner's Activity Report Table 1 Notes Abstract Of Examinations And Tests Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Examinations are limited to components selected for examination.
Internal examination is required only when a pump is dissembled for maintenance, repair, or examination. B-L-1 has one scheduled examination of the external surface of one pump casing in accordance with Code Case N-481.
Category B-0 is scheduled to be examined as part of the reactor vessel examination in the third period.
The Class 1 leakage test is required to be performed every refueling outage. The number and percentages listed represent the total number of refueling outages anticipated over the inspection interval. All required system pressure tests have been canpleted.
The number and percentages listed represent the total number of periods over the inspection interval. All required system pressure tests have been completed.
The risk informed program currently addresses categories B-F and B-J.
NORTH ANNA POWER STATION N2R17 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Exam Category Flaw or Relevant Condition Found During Scheduled Section XI Item Number Flaw Characterization Exam or Test Item Description (IWA-3300)
(Yes or No)
Code Class Description of Work NORTH ANNA POWER STATION N2R17 OUTAGE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Condition Found During Scheduled Section XI Examination or Test (Yes or No)
Repair, Replacement, or Corrective Measure Date Completed I Flaw or Relent Repair/
Replacement Plan Number Item Description I
There were no repairs, replacements or corrective measures required for continued service
Enclosure Serial No.06-009 Owner's Activity Report 3rd Interval - 2"d Period 1 Refueling outage Virginia Electric and Power Company (Dominion)
North Anna Unit 2
NORTH ANNA POWER STATION, N2R17 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT
.+ 3 ?rd I Report Number: WR17c (Ilni M,
7nd P W, 1st Owner: Virginia Electric and Power Company, 5000 Dominion Boulevard, Glen Allen, VA 23060 (Name and Address of Owner)
Plant-.
P 0 R m 407. Mmaal VA 731 17 (Name and Address of Plant)
Unit No 2
Commercial service date 12/14/1980 Refueling outage no N2R17(12/14/04-10/30/05)
(If applicable)
( i 3 / i m i - i?/iwin)
Current inspection interval (1st, Znd, 3rd, 4th, other)
Current inspection p e
r i
o d
1 (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan 1995 Edition 1996 Addenda Date and revision of inspection plan Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan IS1 Plan Rev 4 dated 8/05 including the IS1 Schedule Revision 7, dated 1/06 Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI Certificate of Authorization No NIA Expiration Date NIA Signed./' 4LL (If applicable) r p
fl* &&*
s-p.4 I&
{ sy)
$ f i er^n )
Date (Owner's or Owner's Designee, Title)
J / / I / O d I
I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a
valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virqinia and employed by HSB CT of Hartford, CT have inspected the items described in this Owner's Activity Report, during the period 12/14/04 to 10/30/05, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable, in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions VA 424-R Inspector's Signature National Board, State, Province, and Endorsements
North Anna Power Station N2R17 OUTAGE Form OAR-1 Owner's Activity Report Table 1 Abstract Of Examinations And Tests Total Examinations Credited (%)
For The Period I
B-A I
8.67 I
.OO Total Examinations Credited (%) To Date For The Interval Remarks I
B-B 7 9
0 0
7
-67 18.18 30.00 38.78
.oo
.oo 25.93 23.08 Note 1 Note 2 37.93 Note 2 30.95 41.85 B-D B-G-1 52.00 6.00 650.00 76.00 B-G-2 I
I
.oo I
.oo 29.00
.oo B-K I
14.00
.oo B-L-1 B-N-1 B-N-2 B-N-3 B-0 B-P B-Q C-A C-B c-c C-D C-F-1 C-F-2 C-G 1.oo
.oo
.oo Note 3
.oo 3.00
.oo
.oo 33.33 1.oo
.oo
.oo
.oo 1.oo
.oo
.oo
.oo 3.00
.oo
.oo Note 4
.oo 6.00 1.OO 50.00 Note 5 50.00 4.00 1.OO 50.00 50.00 7.00
.oo
.oo 23.81 16.00
.oo
.oo 31.25 29.00 2.00 41.38 Note 1 16.00 5.00 100.00 62.50 97.00 20.00 56.70 Note 1 20.00 5.00 62.50 55.00 28.57 62.50 2.00
.oo
.oo
.oo
Examination categOCY Total Examinations Required For The Interval Total Examinations Credited For This Period Total Total Examinations Examinations Credited (%)
Credited (%) To For The Period Date For The Interval C-H D-A Remarks 3.00 21.oo Note 6 Note 6
.oo 2.00 Note 6
.oo 33.33 57.14 40.00 I Note 7 D-B 3.00
.oo F-A 413.00 51.OO R-A 56.00 8.00
.oo 33.33 45.95 46.49 47.06 42.86
North Anna Power Station N2RI7 OUTAGE Form OAR-1 Owner's Activity Report Table 1 Notes Abstract Of Examinations And Tests Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Note 7 See Partial Examination attachment.
Examinations are limited to components selected for examination.
Internal examination is required only when a pump is dissembled for maintenance, repair, or examination. B-L-1 has one scheduled examination of the external surface of one pump casing in accordance with Code Case N-481.
Category B-0 is scheduled to be examined as part of the reactor vessel examination in the third period.
The Class 1 leakage test is required to be performed every refueling outage. The number and percentages listed represent the total number of refueling outages anticipated over the inspection interval. All required system pressure tests have been completed.
The number and percentages listed represent the total number of periods over the inspection interval. All required system pressure tests have been completed.
The risk informed program currently addresses categories B-F and B-J. See Partial Examination attachment.
Partial Examinations N2R17c CATEGORY ITEM DRAWING LINE NUMBER EXAM REMARKS B-D B3. 110 12050-W MKS-RC-EQ 12050-W MKS-RC-E-2 12050-W MKS-RC-E-2 c-c C3.20 12050-W MKS-0101 A-1 C-F-1 c5.11 12050-WMKS-Ol11AJ c5.2 I 12050-W MKS-0111 AAC 12050-WMKS-Olll AAN R-A R1.11 12050-W MKS-Ol03BD-2 12050-WMKS-0110A-1 12050-W MKS-011 OA-1 2-RC-E-2 2-RC-E-2 2-RC-E-2 8-51-440-1 53A-Q2 3-Sl-417-1502-Ql 6-RC-438-1502-Ql 6-RC-4341502-Ql 11 12 13 SW-92 1
2A sw -39w 20 sw-9 SW-17 81.4% UT EXAMINATION DUE TO NOZZLE TO PRESSURIZER CONFIGURATION TO NOZZLE TO PRESSURIZER CONFIGURATION 81.4% UT EXAMINATION DUE TO NOZZLE TO PRESSURIZER CONFIGURATION 81.4% UT EXAMINATION DUE 66% MT EXAMINATION DUE TO OBSTRUCTION 49% UT EXAMINATION DUE TO VALVE TO ELBOW CONFIGURATION 63% UT EXAMINATION DUE TO UPSTREAM VALVE BODY TAPER 88% UT EXAMINATION DUE TO PIPE REDUCER CONFIGURATION 53% UT EXAMINATION DUE TO PIPE TO VALVE CONFIRGURATION 63.5% UT EXAMINATION DUE TO COMPONENT CONFIGURATION COMPONENT CONFIGURATION 53% UT EXAMINATION DUE TO
NORTH ANNA POWER STATION N2R17 OUTAGE TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE FORM OAR-1 OWNERS ACTIVITY REPORT Exam Item Number Flaw Characterization Category Item Description (IWA-3300)
Flaw or Relevant Condition Found During Scheduled Section XI Exam or Test (Yes or No)
MC MC MC MC MC MC MC MC MC MC MC r NORTH ANNA POWER STATION N2R17 OUTAGE FORM OAR-1 OWNERS ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Repair, Replacement, or Corrective Measure Replacement Replacement Replacement Repair Repair Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description 4 Service Water Pipe Service Water Pipe Restraint Feedwater Pipe Restraint Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Penetration Cooler Description of Work Replaced pipe due to through wall leak Replaced bent rod eye ends due to water hammer Replaced restraint per DCP due to crack in monoball cone Repai red indications in penetration cooler base material Repaired indications in penetration cooler base material Installed plate over 2 boss hole and in sample plug hole Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed seal plates in penetration cooler Installed plug in penetration sleeve where bottom boss was removed Installed plug in Flaw or Relent Condition Found During Scheduled Section XI Examination or Test (Yes or NO)
No No No No No No No No No No No No No No No No No Date Completed 12/20/05 6/22/05 12/6/05 12/22/05 12/22/05 12/22/05 12/21/05 12/21/05 12/20/05 1/3/06 12/22/05 1/3/05 12/23/05 12/21/05 12/22/05 1 2/21 105 12/22/05 Repair/
Replacement Plan Number 2005-001 2005-039 2005-1 05 2005-1 06 2005-1 07 2005-1 16 2005-1 17 2005-1 18 2005-1 19 2005-1 20 2005-1 21 2005-1 22 2005-1 23 2005-1 25 2005-1 26 2005-1 28 2005-1 29 I
penetration sleeve where bottom boss was removed
Code Class MC MC MC 1
Repair, Replacement, or Corrective Measure Replacement Replacement Replacement Item Description Penetration Cooler Penetration Cooler Penetration Cooler Replacement Description of Work
% Tubing Installed plate for top boss in penetration cooler Installed plate for bottom boss in penetration cooler Installed plate for bottom boss in penetration cooler Replaced section of tubing due to arc strike Flaw or Relent Condition Found During Scheduled Section XI Examination or Test (Yes or No)
No No No No Date Completed 1 19/06 12/21/05 12/22/05 12/21/05 Repair/
Replacement Plan Number 2005-1 30 2005-1 31 2005-1 32 2005-1 33