Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000280/LER-2016-00111 July 20161 OF 4
LER 16-001-00 for Surry Power Station, Unit 1 and 2, Regarding Emergency Service Water Pump Inoperable Due to Corrosion of Valve Support
05000280/LER-2017-0016 October 20171 OF 3
LER 17-001-00 for Surry, Unit 1, Regarding Shutdown due to an Unisolable Leak in Reactor Coolant Pressure Boundary
High Radiation Area
Pressure Boundary Leakage
Pressure boundary leak
05000280/LER-2019-0024 February 2020LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile ProtectionSafe Shutdown
Unanalyzed Condition
Tornado Missile
Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
05000281/LER-2016-0012 December 2016Unit 2 Reactor Trip due to Generator Differential Lockout
LER 16-001-00 for Surry Power Station, Unit 2, Regarding Reactor Trip Due to Generator Differential Lockout
Reserve Station Service Transformer
05000281/LER-2020-001, Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication6 November 2020Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication
CY-04-011, Withdrawal as Pilot Plant for Implementation of 10 CFR 50.6912 June 2006Withdrawal as Pilot Plant for Implementation of 10 CFR 50.69Probabilistic Risk Assessment
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971Fukushima Dai-Ichi
Significance Determination Process
Earthquake
Backfit
IR 05000028/201941331 October 2019Security Insp Report 5000280/ 2019413 and 500028/2019413
IR 05000280/200100827 March 2002Reply to Denial of Non-Cited Violation - NRC Inspection Report 50-280/01-08, 50-281/01-08 & Reply to Claim of BackfitBackfit
IR 05000280/200200225 July 2002IR 05000280-02-002 & IR 05000281-02-002, on 03/31 - 06/29/02; Surry Power Station, Units 1 & 2, Equipment Alignment, Integrated Resident Inspector ReportNon-Destructive Examination
Stroke time
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
IR 05000280/200200328 October 2002IR 05000280-02-003, and IR 05000281-02-003 on 06/30/02 - 09/28/02; Virginia Electric and Power Co.; Surry Power Station, Units 1 & 2. Event FollowupHigh winds
Offsite Dose Calculation Manual
Met Tower
Reserve Station Service Transformer
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Siren
IR 05000280/20020043 February 2003IR 05000280-02-004 & IR 05000281-02-004, on 09/29/02 - 01/04/03, Virginia Electric and Power Co.; Surry Power Station Units 1 & 2; Nonroutine Plant EvolutionsBoric Acid
High Radiation Area
Reserve Station Service Transformer
Locked High Radiation Area
Significance Determination Process
Process Control Program
Fire Protection Program
IR 05000280/200200625 March 2002IR 05000338/2002-006, IR 05000339/2002-006, 05000280/2002-006 & 05000281/2002-006, Virginia Electric & Power Co., Glen Allen, Va. Inspection on 02/08/2002 Related to Application for Renewal. No Violations NotedSafe Shutdown
Boric Acid
Ultimate heat sink
Coatings
Reserve Station Service Transformer
Aging Management
License Renewal
Fire Protection Program
IR 05000280/200200723 July 2002IR 05000280-02-007, IR 05000281-02-007, on 06/10/-27/2002, Virginia Electric and Power Co; Surry Nuclear Power Station, Units 1 & 2; Safety System Design and Performanced Capability Biennial Baseline Inspection, Steam Generator Tube RupturePacking leak
Through-Wall Leakage
IR 05000280/20020088 May 2002IR 05000280/2002-008 and IR 05000281/2002-008 for Surry Nuclear Power Station Conducted on 04/12/2002Probabilistic Risk Assessment
Condition Adverse to Quality
IR 05000280/20020106 November 2002Stations - Addendum to NRC IR 05000338-02-010, 05000339-02-010, 05000280-02-010 and 05000281-02-010
IR 05000280/200230119 April 2002NRC Examination Report 50-280/02-301 and 50-281/02-301
IR 05000280/20030014 March 2003Annual Assessment Letter - Surry Power Station (Reports 50-280/03-01 & 50-281/03-01)Significance Determination Process
IR 05000280/200300225 April 2003IR 05000280-03-002 & IR 05000281-03-002, on 01/05 - 04/05/2003, Virginia Electric Power Co., Surry Units 1 & 2. Fire Protection & Resolution of ProblemsSignificance Determination Process
Job Performance Measure
Maintenance Rule Program
Through-Wall Leakage
Fire Protection Program
IR 05000280/200300328 July 2003IR 05000280-03-003, IR 05000281-03-003, on 04/06 - 06/28/2003, Surry Power Station Units 1 & 2, Routine Integrated ReportBoric Acid
Non-Destructive Examination
Nondestructive Examination
Earthquake
Liquid penetrant
Through-Wall Leak
Fire Protection Program
IR 05000280/200300427 October 2003IR 05000280-03-004, IR 05000281-03-004, IR 07200002-03-001, on 06/29/2003 - 09/27/2003, Surry Power Station, Units 1 & 2 and Independent Spent Fuel Storage Installation; Other ActivitiesBoric Acid
High winds
Internal Flooding
Nondestructive Examination
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Through-Wall Leak
Fire Protection Program
Power change
IR 05000280/200300526 January 2004IR 05000280-03-005 & 05000281-03-005 on 9/28/2003 - 12/27/2003 for Surry, Units 1 & 2; Inservice Inspection Activities, Integrated Resident Inspector ReportBoric Acid
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Moisture barrier
Maintenance Rule Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
IR 05000280/200300621 February 2003IR 05000280-03-006 and IR 05000281-03-006 on 01/06 - 09/03 for Virginia Electric and Power CompanyB.5.b
IR 05000280/20030082 February 2004IR 05000280-03-008 & 05000281-03-008, on 04/21/03 Through 01/07/04, for Virginia Electric & Power Company, Surry, VA; Significance Determination of Unresolved Items from Triennial Fire Protection InspectionSafe Shutdown
Significance Determination Process
Preliminary White Finding
Fire Protection Program
IR 05000280/20030092 January 2004IR 05000280-03-009, IR 05000281-03-009 on 11/17/2003 - 12/5/2003; Surry, Units 1 & 2, Biennial Baseline Inspection of the Identification and Resolution of Problems. a Violation Was Identified in the Area of Prioritization and Evaluation ofBoric Acid
Probabilistic Risk Assessment
Coatings
Significance Determination Process
Maintenance Rule Program
Fire Protection Program
IR 05000280/200400219 April 2004IR 05000280-04-002, IR 05000281-04-002, on 12/28/2003 - 03/27/2004, Surry Power Station Units 1 & 2, Surry, VA; Routine Integrated ReportSignificance Determination Process
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
IR 05000280/200400320 July 2004IR 05000280-04-003, 05000281-04-003 & 07200002-04-001, on 03/28/2004 - 06/26/2004, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Routine Integrated ReportSignificance Determination Process
Maintenance Rule Program
Fire Protection Program
IR 05000280/200400527 January 2005IR 05000280-04-005, 05000281-04-005, on 09/26/2004 - 12/31/2004; Surry Power Station Units 1 & 2, Routine Integrated ReportBoric Acid
Packing leak
Non-Destructive Examination
Mission time
Temporary Modification
VT-2
Significance Determination Process
Maintenance Rule Program
Pressure Boundary Leakage
Fire Protection Program
Siren
IR 05000280/200400621 May 2004IR 05000280-04-006 & IR 05000281-04-006, on 03/22/04 Through 03/26/04 & 04/05/04 Through 04/08/04, for Surry Power Station Units 1 & 2; Safety System Design & Performance Capability InspectionUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Coatings
Significance Determination Process
Job Performance Measure
Earthquake
IR 05000280/200400928 April 2004IR 05000280-04-009 on 02/16/2004 - 03/27/2004 for Surry Power Station, Unit 1; Supplemental Inspection IP 95001 for a White Performance Indicator in the Initiating Events CornerstoneSignificance Determination Process
IR 05000280/200401121 January 2005IR 05000280-04-011, 05000281-04-011, on 11/15-19-2004 & 12/06-10/2004, Surry Power Station, Units 1 & 2; Supplemental Inspection for Degraded Mitigating Systems CornerstoneSafe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Preliminary White Finding
IR 05000280/200500219 April 2005IR 05000280-05-002, 05000281-05-002, and 07200002-05-001, on 01/01/2005 - 03/31/2005, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Event Followup, Routine Integrated Report, and Annual Assessment MeetingHigh winds
Temporary Modification
Significance Determination Process
Job Performance Measure
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000280/200500325 July 2005IR 05000280-05-003, IR 05000281-05-003; 04/01/2005-06/30/2005; Surry Power Station Units 1 & 2. Identification and Resolution of ProblemsUnanalyzed Condition
Boric Acid
High Radiation Area
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
IR 05000280/200500421 October 2005IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance EffectivenessBoric Acid
Time of Discovery
High winds
Stroke time
Past operability
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200500530 January 2006IR 05000280-05-005, IR 05000281-05-005, on 10/01-12/31/2005, Virginia Electric and Power CompanyInternal Flooding
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200500620 September 2005IR 05000280-05-006 and IR 05000281-05-006 on 08/08/05 - 08/26/05, Surry Power, Units 1 and 2, Biennial Baseline Inspection of the Identification a Resolution of Problems. Three Violations Were Identified in the Area of Corrective ActionsBoric Acid
Packing leak
Mission time
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through Wall Leak
Operability Assessment
IR 05000280/200600224 April 2006IR 05000280-06-002, 05000281-06-002, on 01/01/2006 - 03/31/2006, Surry, Units 1 & 2Boric Acid
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200600321 July 2006IR 05000280-06-003, IR 05000281-06-003; 04/01/2006 - 06/30/2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated ReportBoric Acid
High winds
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Power change
Downpower
IR 05000280/200600426 October 2006IR 05000280-06-004, IR 05000281-06-004, and IR 07200055-06-001, Virginia Electric and Power CompanyBoric Acid
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Temporary Modification
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
IR 05000280/200600531 January 2007IR 05000280-06-05, IR 05000281-06-05, IR 05000280-06-501, IR 05000281-06-501, IR 07200002-06-003; on 10/01-12/31, 2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated RepoBoric Acid
High winds
Ultimate heat sink
Nondestructive Examination
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Biofouling
Fire Protection Program
IR 05000280/20060068 March 2006IR 05000280-06-006, 05000281-06-006, on 01/13, 01/23 - 27, 02/06 -02/10/2006, Surry, Units 1 and 2, Component Design Bases InspectionProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Time Critical Operator Action
IR 05000280/20060085 May 2006IR 05000280-06-008, IR 05000281-06-008 on 02/06-10/2006 for Surry Power Station, Units 1 and 2; Exercise EvaluationSignificance Determination Process
Design basis earthquake
Earthquake
Preliminary White Finding
IR 05000280/200600911 August 2006IR 05000280-06-009, IR 05000281-06-009, on 06/12-16/2006 & 06/26-30/2006 for Surry, Units 1 and 2; Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Coatings
Emergency Lighting
Significance Determination Process
Job Performance Measure
Thermoset
Fire Protection Program
Fire Watch
IR 05000280/200601025 July 2006EA-06-071, Surry, Final Significance Determination for a White Finding & Notice of Violation (Surry Power Station - NRC Inspection Report Nos. 05000280-06-010, 05000281-06-010)Time of Discovery
Significance Determination Process
Earthquake
Preliminary White Finding
IR 05000280/20060111 December 2006IR 05000280-06-011, IR 05000281-06-011 on 10/16/06 - 10/27/06 for Surry Power Station, Unit 1 & 2; Special Insp ReportReserve Station Service Transformer
Significance Determination Process
IR 05000280/20064014 October 2006IR 05000280-06-401, & IR 05000281-06-401, Safeguards Removed) Surry Power StationAffidavit
IR 05000280/200650215 December 2006IR 05000280-06-502; 05000281-06-502; 11/13/2006 - 11/15/2006; Surry Power Station, Units 1 and 2; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.Earthquake
IR 05000280/20070011 March 2007Annual Assmt. Ltr - Surry, IR 05000280-07-001 and 05000281-07-001
IR 05000280/200700230 April 2007IR 05000280-07-002, IR 05000281-07-002, on 01/01/2007 - 03/31/2007; Surry Power Station Units 1 & 2; Maintenance Risk Assessment and Emergent Work, Identification and Resolution of Problems, and Followup of EventsReserve Station Service Transformer
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
Incremental Core Damage Probability Deficit
IR 05000280/200700330 July 2007IR 05000280-07-003 and 05000281-07-003 on 04/01/2007 - 06/30/2007 for Surry PowerSafe Shutdown
High winds
Commercial Grade Dedication
Probabilistic Risk Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Incremental Core Damage Probability Deficit
Power change