February 21, 2003

SUBJECT:

NRC INSPECTION REPORT NO. 50-280/03-06 AND 50-281/03-06

Dear Mr. Christian:

On January 9, 2003, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Nuclear Station. The enclosed special inspection report documents the inspection findings, which were discussed on January 9 and February 21, 2003, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to security of your facility. The inspection used Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 15, 2002, May 9, 2002 and August 29, 2002. Within these areas, the inspection consisted of selected examination of procedures and records, observation of activities, and interviews with personnel.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without the enclosed Safeguards Information, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

VEPCO

DOCUMENT CONTAINS DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37

Enclosure:

NRC Inspection Report 50-280/03-06 and 50-281/03-06

REGION II==

Docket Nos:

50-280, 50-281 License Nos:

DPR-32, DPR-37 Report No.:

50-280, 281/2003-06 Licensee:

Virginia Electric and Power Company Facility:

Surry Power Station Location:

5850 Hog Island Road Surry, VA 23883 Dates:

January 6-9, 2003 Inspectors:

Jerry D. Ennis, Senior Physical Security Inspector Donald B. Forbes, Physical Security Inspector James L. Kreh, Emergency Preparedness Inspector Randall Musser, Senior Resident Inspector Approved By:

Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED SUMMARY OF FINDINGS IR 05000280-03-06; IR 05000281-03-06: Virginia Electric and Power Company; 1/6-10/2003; Surry Power Station, Units 1 and 2; TI 2515/148, Verification of Compliance with Interim Compensatory Measures Order.

The report covered an announced inspection by two regional physical security inspectors, an emergency preparedness inspector, and the senior resident inspector. Three issues, the significance of which are to be determined, were identified. Pending further review, these issues are characterized as unresolved items.

A.

Inspector-Identified and Self-Revealing Findings Cornerstone: Physical Security

The inspectors identified an unresolved item concerning the licensees implementation of Interim Compensatory Measures (ICM) B.1.a of the Order.

(Section II.A)

The inspectors identified an unresolved item concerning the licensees implementation of ICM B.2.b of the Order. (Section III.C)

The inspectors identified an unresolved item concerning the licensees implementation of ICM B.5.b of the Order. (Section VI.B)

B.

Licensee-Identified Violations None