Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20062E327 | 30 July 1982 | Advises That Fee Sent w/820120 Application for Exemption from Safeguarding Requirements of 10CFR73.21 Will Be Refunded | |
ML20062F100 | 30 July 1982 | Forwards Request for Addl Info Re Water Hammer Prevention Per Event at Krsko Reactor in Yugoslavia.Test Plan to Verify That Water Hammer Will Not Occur Should Be Provided | |
ML20126C599 | 28 February 1980 | Forwards Addl Info Needed to Evaluate Mgt & Technical Resources Available to Licensees.Representative of Teknekron Will Contact Licensees by Telephone to Obtain Data | |
ML20126D360 | 22 June 1984 | Forwards Request for Addl Info to Complete Review of 840604 Application for Exemption to GDC 17,10CFR50,App A.Info Requested by 840706 | Exemption Request |
ML20126D835 | 11 June 1980 | Ltr to All Operating PWRs Requesting Amend to Tech Specs Re Decay Heat Removal Capability.Amend Is Necessary to Provide Permanent long-term Assurance That Redundancy Will Be Maintained | |
ML20126L544 | 11 June 1985 | Forwards Comments on Baw 1843P, B&W Owners Group Evaluation of Internal Bolting Concerns in 177FA Plants. Rept Consistent W/Bases Agreed Upon.Action on Issue Complete. Corrected Rept Requested | |
ML20126M295 | 24 July 1985 | Advises That Addl Info Needed for Plants W/Upper Head Injection (Uhi) Sys to Assess Likelihood of Loss of Uhi auto-isolation Capability.Info Re Demand & Failure Frequencies of Isolation Function Requested within 30 Days | |
ML20126M449 | 18 July 1985 | Informs That Request to Use ASME Code Case N-411 Acceptable, in Response Spectrum Seismic Analysis of Piping Sys.Use of ASME Code Case N-411 Should Be Documented in Future FSAR Amend | |
ML20126M809 | 31 May 1985 | Forwards Population Density Maps for Use in Emergency Planning Zones.Maps Prepared by ORNL by Projection from 1980 Census Data & Must Be Taken as Estimates.W/O Encls | |
ML20127A383 | 14 June 1985 | Advises That Rev 3 to QA Topical Rept CPC-2A Continues to Satisfy Requirements of 10CFR50,App B & Acceptable.Rev 3 Changes Re Responsibility & Program Control of Inservice Insp Satisfactory | |
ML20127A561 | 17 August 1982 | Forwards Licensing Review Group II Rept Re Review Status of 56 Issues.Forty Issues resolved,11 Unresolved & 5 Determined Nongeneric.Revised List,Identifying Where SER Issue Addressed Also Encl | Safe Shutdown Scram Discharge Volume |
ML20127B542 | 11 April 1984 | Forwards Listing of Unresolved Issues Re Tdi Diesels,To Be Discussed at 840413 Meeting.Issues Include Cylinder Heads, Engine Block,Wrist Pin Bushings,Connecting Rods & Rod Bearings,Turbocharger & Testing/Maint Plans | |
ML20127B893 | 17 July 1984 | Forwards Request for Addl Info Re Tdi Engine Insp Results Discussed at 840713 Meeting.Response Requested by 840720 for Items A,B & C & 840727 for Item D | |
ML20127E449 | 20 February 1985 | Forwards Insp Repts 50-280/84-31,50-281/84-31,50-338/84-39 & 50-339/84-39 on 841105-28 & Notice of Deviation | |
ML20127F657 | 25 June 1982 | Forwards Safety Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance Noted | |
ML20127J737 | 21 June 1985 | Advises That Revs 33,34 & 35 to QA Topical Rept CE-1-A Satisfy Requirements of App B to 10CFR50.Changes to Section 7 Resolve Questions Re Procurement Activities | |
ML20127J893 | 13 May 1985 | Requests Payment of Fee for 840502 Application for Rev of out-of-svc Times for Components at Byron & Braidwood Generating Stations Units 1 & 2 | |
ML20127N919 | 14 May 1985 | Requests Addl Info Re Util 850211 Response to Question 423.45 Re Rev 1 to Reg Guide 1.108.Ref to Specific Test Abstracts Where Testing Accomplished to Meet Guidelines of Reg Guide Requested.Response Requested within 30 Days | |
ML20127P002 | 29 May 1985 | Forwards Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted | |
ML20128B261 | 20 May 1985 | Forwards SALP Repts 50-213/85-99,50-245/85-99 & 50-336/85-99 for Sept 1983 - Feb 1985.Meeting Scheduled on 850604 to Discuss SALP Board Findings.Reply to Board Findings Requested within 30 Days After Meeting | Systematic Assessment of Licensee Performance |
ML20128C107 | 21 May 1985 | Forwards Insp Repts 50-254/85-13,50-265/85-14,50-295/85-19, 50-304/85-20,50-373/85-15,50-374/85-15,50-454/85-20 & 50-455/85-14 on 850425 & 0503.No Noncompliance Identified | |
ML20128F023 | 2 July 1985 | Forwards NRC Enforcement Package for Kewaunee & Util Enforcement Conference Presentation for Review.Revised Enforcement Provision to Mitigate Penalties Based on Good Performance Should Be Incentive for Excellence.W/O Encls | |
ML20128F102 | 2 July 1985 | Forwards 850315 Civil Penalty Package of Kewaunee Nuclear Plant to Demonstrate 840308 Enforcement Policy Re Full Mitigation of Civil Penalty on Basis of Prior Good Performance.Wisconsin Public Svc Co Presentation Encl | |
ML20128G094 | 21 June 1985 | Forwards SER Re Data & Info Capability for post-trip Review Per Generic Ltr 83-28,Item 1.2.W/exception of Record Retention Period for Data & Info Used in post-trip Reviews, Capability Acceptable.Action on Item 1.2 Completed | |
ML20128G929 | 3 July 1985 | Ack Receipt of Rev 36 to QA Topical Rept CE-1-A.Rev Satisfies 10CFR50,App B & Acceptable | |
ML20128H860 | 1 July 1985 | Forwards Amends 63 & 103 to Licenses DPR-61 & DPR-21, Respectively & Safety Evaluations.Amends Revise Item III.D.3.4, Control Room Habitability, of 830314 Confirmatory Orders to Remove Dec 1984 Completion Date | |
ML20128K849 | 24 June 1985 | Forwards Insp Repts 50-269/85-14,50-270/85-14,50-287/85-14, 50-369/85-19,50-370/85-20,50-413/85-21 & 50-414/85-20 on 850528-31.No Violation or Deviation Noted | |
ML20128L500 | 22 May 1985 | Concludes That 1985 Financial Info,Per 850411 Submittal, Satisfies 10CFR140.21,requiring That Each Licensee Maintain Approved Guarantee of Payment of Deferred Premiums for Each Operating Reactor Over 100 Mw(E) | |
ML20128L813 | 12 June 1985 | Forwards Insp Repts 50-269/85-13,50-270/85-13,50-287/85-13, 50-369/85-18 & 50-370/85-19 on 850528-31.No Violation or Deviation Noted | |
ML20128M021 | 28 June 1985 | Discusses Plant Familiarization Tour by Sandia Planned for 850715-19 Re Pra.Min Needs of Touring Team Enumerated.Team Leaders & Corporate Contact People Identified | Probabilistic Risk Assessment |
ML20128Q088 | 24 May 1985 | Requests Confirmation That New Westinghouse Small Break LOCA Model,Notrump,Will Be Used in Analysis,Per TMI Action Items II.K.3.30 & II.K.3.31.Plans & Schedule for Completing Items Also Requested.Safety Evaluation Encl | Loop seal |
ML20129B511 | 23 May 1985 | Ack Receipt of 850410 Submittal of Topical Rept CE-1-A,Rev 34.Review Will Require More than 60 Days to Complete | |
ML20129B609 | 3 July 1985 | Advises That Sandia Will Conduct 5-day Visit to Plants for up-to-date Info on risk-important Hardware & Procedure Mods That Have Taken Place Since Completion of Pra.Plant Contact Requested.Pra Update Process Listed | Probabilistic Risk Assessment |
ML20129C764 | 11 July 1985 | Requests Telephone Company Personnel Access to Site to Replace Health Physics Network Telephone Sys W/Dedicated Commercial Circuits.Schedule of Visits Forthcoming | Health Physics Network |
ML20129D474 | 11 July 1985 | Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,Listed | Health Physics Network |
ML20129D506 | 11 July 1985 | Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,Listed | Health Physics Network |
ML20129D573 | 12 July 1985 | Confirms Plans for 850716 Meeting W/Util in Glen Ellyn,Il to Discuss Addl Aspects of Licensee Regulating Improvement Program,Per 850703 Meeting Between D Farrar & a Madison | |
ML20129E395 | 28 June 1985 | Discusses Task to Update PRA Results on Five Lwrs.Site Visit by Sandia Requested on 850722-26 to Obtain Current Info on Risk Important Hardware & Procedure Mods | |
ML20129F260 | 26 June 1985 | Forwards Safety Evaluation of TMI Action Item II.K.3.30 Re Use of Westinghouse Small Break LOCA Model NOTRUMP.Plant- Specific Analyses Due within 1 Yr of Receipt of Ltr,Per TMI Item II.K.3.31 | Loop seal |
ML20129F284 | 12 April 1985 | Forwards Section III of App to SALP Repts 50-269/84-31, 50-270/84-31,50-287/84-35,50-369/84-36 & 50-370/84-34. W/O Encl | Systematic Assessment of Licensee Performance |
ML20129G124 | 18 June 1985 | Forwards Summary of 850507 Meeting in Atlanta,Ga Re Util Progress in Establishing Generic Section for Emergency Preparedness Plan.Attendance List Also Encl | |
ML20129G712 | 30 May 1985 | Discusses Insps on 850213-15 at Peach Bottom & 850204-08 & 13 at Limerick & Forwards Notices of Violation & Proposed Imposition of Civil Penalties | Systematic Assessment of Licensee Performance |
ML20129H118 | 4 April 1985 | Forwards Summary of 850320 Meeting in Region II Re Proposed 10CFR50.54(p) Changes to Guard Training & Qualification Plans.W/O Encl | |
ML20129H898 | 11 July 1985 | Forwards SER Accepting Addressing Open Items in 850515 & 17 SERs Re Generic Ltr 83-28,Item 1.1 Concerning post-trip Review for Bryon & Braidwood, Respectively | |
ML20129K082 | 22 July 1985 | Forwards Requests for Addl Info Required to Complete Review of Responses to IE Bulletin 80-11 Re Masonry Wall Design. Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants Encl for Ref | Earthquake |
ML20132C164 | 3 November 1975 | Discusses Qualification Review of Plants for Replication Per 741119 Request.Plant Design Acceptable for Replication | Earthquake |
ML20132E497 | 27 March 1985 | Forwards Apps to SALP Repts 50-269/84-31,50-270/84-31, 50-287/84-35,50-369/84-36 & 50-370/84-34 | Systematic Assessment of Licensee Performance |
ML20132G338 | 31 December 1984 | Forwards SALP Repts 50-269/84-31,50-270/84-31,50-287/84-35, 50-369/84-36 & 50-370/84-34 for May 1983 - Aug 1984.No Minor Weaknesses Noted for Oconee.Major Weakness in Area of Plant Operations Identified for McGuire | Systematic Assessment of Licensee Performance |
ML20132G416 | 19 April 1985 | Confirms 850423 Meeting to Discuss Matters of Mutual Interest Re Section 8 of Recently Administered Requalification Exam,Per 850416 Telcon | |
ML20133A435 | 16 September 1985 | Responds to 850830 Request for Approval to Hold One Emergency Medical Assistance Drill on 851106 to Meet Criteria to Test Medical Response Capability for Emergency Plans.Proposal Acceptable |