Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20062E32730 July 1982Advises That Fee Sent w/820120 Application for Exemption from Safeguarding Requirements of 10CFR73.21 Will Be Refunded
ML20062F10030 July 1982Forwards Request for Addl Info Re Water Hammer Prevention Per Event at Krsko Reactor in Yugoslavia.Test Plan to Verify That Water Hammer Will Not Occur Should Be Provided
ML20126C59928 February 1980Forwards Addl Info Needed to Evaluate Mgt & Technical Resources Available to Licensees.Representative of Teknekron Will Contact Licensees by Telephone to Obtain Data
ML20126D36022 June 1984Forwards Request for Addl Info to Complete Review of 840604 Application for Exemption to GDC 17,10CFR50,App A.Info Requested by 840706Exemption Request
ML20126D83511 June 1980Ltr to All Operating PWRs Requesting Amend to Tech Specs Re Decay Heat Removal Capability.Amend Is Necessary to Provide Permanent long-term Assurance That Redundancy Will Be Maintained
ML20126L54411 June 1985Forwards Comments on Baw 1843P, B&W Owners Group Evaluation of Internal Bolting Concerns in 177FA Plants. Rept Consistent W/Bases Agreed Upon.Action on Issue Complete. Corrected Rept Requested
ML20126M29524 July 1985Advises That Addl Info Needed for Plants W/Upper Head Injection (Uhi) Sys to Assess Likelihood of Loss of Uhi auto-isolation Capability.Info Re Demand & Failure Frequencies of Isolation Function Requested within 30 Days
ML20126M44918 July 1985Informs That Request to Use ASME Code Case N-411 Acceptable, in Response Spectrum Seismic Analysis of Piping Sys.Use of ASME Code Case N-411 Should Be Documented in Future FSAR Amend
ML20126M80931 May 1985Forwards Population Density Maps for Use in Emergency Planning Zones.Maps Prepared by ORNL by Projection from 1980 Census Data & Must Be Taken as Estimates.W/O Encls
ML20127A38314 June 1985Advises That Rev 3 to QA Topical Rept CPC-2A Continues to Satisfy Requirements of 10CFR50,App B & Acceptable.Rev 3 Changes Re Responsibility & Program Control of Inservice Insp Satisfactory
ML20127A56117 August 1982Forwards Licensing Review Group II Rept Re Review Status of 56 Issues.Forty Issues resolved,11 Unresolved & 5 Determined Nongeneric.Revised List,Identifying Where SER Issue Addressed Also EnclSafe Shutdown
Scram Discharge Volume
ML20127B54211 April 1984Forwards Listing of Unresolved Issues Re Tdi Diesels,To Be Discussed at 840413 Meeting.Issues Include Cylinder Heads, Engine Block,Wrist Pin Bushings,Connecting Rods & Rod Bearings,Turbocharger & Testing/Maint Plans
ML20127B89317 July 1984Forwards Request for Addl Info Re Tdi Engine Insp Results Discussed at 840713 Meeting.Response Requested by 840720 for Items A,B & C & 840727 for Item D
ML20127E44920 February 1985Forwards Insp Repts 50-280/84-31,50-281/84-31,50-338/84-39 & 50-339/84-39 on 841105-28 & Notice of Deviation
ML20127F65725 June 1982Forwards Safety Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance Noted
ML20127J73721 June 1985Advises That Revs 33,34 & 35 to QA Topical Rept CE-1-A Satisfy Requirements of App B to 10CFR50.Changes to Section 7 Resolve Questions Re Procurement Activities
ML20127J89313 May 1985Requests Payment of Fee for 840502 Application for Rev of out-of-svc Times for Components at Byron & Braidwood Generating Stations Units 1 & 2
ML20127N91914 May 1985Requests Addl Info Re Util 850211 Response to Question 423.45 Re Rev 1 to Reg Guide 1.108.Ref to Specific Test Abstracts Where Testing Accomplished to Meet Guidelines of Reg Guide Requested.Response Requested within 30 Days
ML20127P00229 May 1985Forwards Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted
ML20128B26120 May 1985Forwards SALP Repts 50-213/85-99,50-245/85-99 & 50-336/85-99 for Sept 1983 - Feb 1985.Meeting Scheduled on 850604 to Discuss SALP Board Findings.Reply to Board Findings Requested within 30 Days After MeetingSystematic Assessment of Licensee Performance
ML20128C10721 May 1985Forwards Insp Repts 50-254/85-13,50-265/85-14,50-295/85-19, 50-304/85-20,50-373/85-15,50-374/85-15,50-454/85-20 & 50-455/85-14 on 850425 & 0503.No Noncompliance Identified
ML20128F0232 July 1985Forwards NRC Enforcement Package for Kewaunee & Util Enforcement Conference Presentation for Review.Revised Enforcement Provision to Mitigate Penalties Based on Good Performance Should Be Incentive for Excellence.W/O Encls
ML20128F1022 July 1985Forwards 850315 Civil Penalty Package of Kewaunee Nuclear Plant to Demonstrate 840308 Enforcement Policy Re Full Mitigation of Civil Penalty on Basis of Prior Good Performance.Wisconsin Public Svc Co Presentation Encl
ML20128G09421 June 1985Forwards SER Re Data & Info Capability for post-trip Review Per Generic Ltr 83-28,Item 1.2.W/exception of Record Retention Period for Data & Info Used in post-trip Reviews, Capability Acceptable.Action on Item 1.2 Completed
ML20128G9293 July 1985Ack Receipt of Rev 36 to QA Topical Rept CE-1-A.Rev Satisfies 10CFR50,App B & Acceptable
ML20128H8601 July 1985Forwards Amends 63 & 103 to Licenses DPR-61 & DPR-21, Respectively & Safety Evaluations.Amends Revise Item III.D.3.4, Control Room Habitability, of 830314 Confirmatory Orders to Remove Dec 1984 Completion Date
ML20128K84924 June 1985Forwards Insp Repts 50-269/85-14,50-270/85-14,50-287/85-14, 50-369/85-19,50-370/85-20,50-413/85-21 & 50-414/85-20 on 850528-31.No Violation or Deviation Noted
ML20128L50022 May 1985Concludes That 1985 Financial Info,Per 850411 Submittal, Satisfies 10CFR140.21,requiring That Each Licensee Maintain Approved Guarantee of Payment of Deferred Premiums for Each Operating Reactor Over 100 Mw(E)
ML20128L81312 June 1985Forwards Insp Repts 50-269/85-13,50-270/85-13,50-287/85-13, 50-369/85-18 & 50-370/85-19 on 850528-31.No Violation or Deviation Noted
ML20128M02128 June 1985Discusses Plant Familiarization Tour by Sandia Planned for 850715-19 Re Pra.Min Needs of Touring Team Enumerated.Team Leaders & Corporate Contact People IdentifiedProbabilistic Risk Assessment
ML20128Q08824 May 1985Requests Confirmation That New Westinghouse Small Break LOCA Model,Notrump,Will Be Used in Analysis,Per TMI Action Items II.K.3.30 & II.K.3.31.Plans & Schedule for Completing Items Also Requested.Safety Evaluation EnclLoop seal
ML20129B51123 May 1985Ack Receipt of 850410 Submittal of Topical Rept CE-1-A,Rev 34.Review Will Require More than 60 Days to Complete
ML20129B6093 July 1985Advises That Sandia Will Conduct 5-day Visit to Plants for up-to-date Info on risk-important Hardware & Procedure Mods That Have Taken Place Since Completion of Pra.Plant Contact Requested.Pra Update Process ListedProbabilistic Risk Assessment
ML20129C76411 July 1985Requests Telephone Company Personnel Access to Site to Replace Health Physics Network Telephone Sys W/Dedicated Commercial Circuits.Schedule of Visits ForthcomingHealth Physics Network
ML20129D47411 July 1985Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,ListedHealth Physics Network
ML20129D50611 July 1985Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,ListedHealth Physics Network
ML20129D57312 July 1985Confirms Plans for 850716 Meeting W/Util in Glen Ellyn,Il to Discuss Addl Aspects of Licensee Regulating Improvement Program,Per 850703 Meeting Between D Farrar & a Madison
ML20129E39528 June 1985Discusses Task to Update PRA Results on Five Lwrs.Site Visit by Sandia Requested on 850722-26 to Obtain Current Info on Risk Important Hardware & Procedure Mods
ML20129F26026 June 1985Forwards Safety Evaluation of TMI Action Item II.K.3.30 Re Use of Westinghouse Small Break LOCA Model NOTRUMP.Plant- Specific Analyses Due within 1 Yr of Receipt of Ltr,Per TMI Item II.K.3.31Loop seal
ML20129F28412 April 1985Forwards Section III of App to SALP Repts 50-269/84-31, 50-270/84-31,50-287/84-35,50-369/84-36 & 50-370/84-34. W/O EnclSystematic Assessment of Licensee Performance
ML20129G12418 June 1985Forwards Summary of 850507 Meeting in Atlanta,Ga Re Util Progress in Establishing Generic Section for Emergency Preparedness Plan.Attendance List Also Encl
ML20129G71230 May 1985Discusses Insps on 850213-15 at Peach Bottom & 850204-08 & 13 at Limerick & Forwards Notices of Violation & Proposed Imposition of Civil PenaltiesSystematic Assessment of Licensee Performance
ML20129H1184 April 1985Forwards Summary of 850320 Meeting in Region II Re Proposed 10CFR50.54(p) Changes to Guard Training & Qualification Plans.W/O Encl
ML20129H89811 July 1985Forwards SER Accepting Addressing Open Items in 850515 & 17 SERs Re Generic Ltr 83-28,Item 1.1 Concerning post-trip Review for Bryon & Braidwood, Respectively
ML20129K08222 July 1985Forwards Requests for Addl Info Required to Complete Review of Responses to IE Bulletin 80-11 Re Masonry Wall Design. Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants Encl for RefEarthquake
ML20132C1643 November 1975Discusses Qualification Review of Plants for Replication Per 741119 Request.Plant Design Acceptable for ReplicationEarthquake
ML20132E49727 March 1985Forwards Apps to SALP Repts 50-269/84-31,50-270/84-31, 50-287/84-35,50-369/84-36 & 50-370/84-34Systematic Assessment of Licensee Performance
ML20132G33831 December 1984Forwards SALP Repts 50-269/84-31,50-270/84-31,50-287/84-35, 50-369/84-36 & 50-370/84-34 for May 1983 - Aug 1984.No Minor Weaknesses Noted for Oconee.Major Weakness in Area of Plant Operations Identified for McGuireSystematic Assessment of Licensee Performance
ML20132G41619 April 1985Confirms 850423 Meeting to Discuss Matters of Mutual Interest Re Section 8 of Recently Administered Requalification Exam,Per 850416 Telcon
ML20133A43516 September 1985Responds to 850830 Request for Approval to Hold One Emergency Medical Assistance Drill on 851106 to Meet Criteria to Test Medical Response Capability for Emergency Plans.Proposal Acceptable