Text
q 2sc6 5 - W+ ~ T d52?
57-lfL-y F
gf, yg 5 - 3 28
-y4
-z a
, /-
c g._ a l
. 1 ras m en f-j9/J40/
sudjoet 711e no.
r' WL' 0 3 1985 m so, ReseaNh Requot No.
FIN No.
.TEEG No.
Mr. John Raulston Chief Nuclear Engineer
? #" "
- I 3,$7n m-sgi Tennessee Valley Authority
~
400 Sumit Hill Drive 1, u3, 7,3 W10C126 Knoxville, Tennessee 37902
Dear Mr. Raulston:
j The Office of Nuclear Regulatory Research of the Nuclear Regulatcry Comission (HRC) is engaged in a task to update the probabilistic risk assessment (FRA) l results on five U.S. LWRs.
These plants.are Surry, Peach Bottom, Sequoyah, Grand Gulf and Zion, and the task is limited to accident sequences resulting i
from internal initiators.
This task will provide part of an information base to be used by HRR to intaract with IDCOR in their developmorit of a proposed methodology for resolving severe accident issues for plants without PRAs and to assist in developing a regulatory position on the appropriate role that risk insights should play in the regulation of nuclear power.
I appreciate very rach your voluntary offer to permit cur contractor (Sandia National Laboratories--SNL) to conduct a 5-day familiarization visit at your plant for approximately six people.
This~ visit will permit a more realistic' evaluation of your plant, including obtaining up-to-date information on any risk-inportant hardware and procedure modifications that have taken place since 4
the PRA on your plant was completed. Such a realistic evaluation is crucial to the process of drawing accurate, plant-specific perspectives on'plent risk and the principal contributors to that risk.
The desired dates fer this visit are July 31-August 2 and August 5-5, 1985.
Our contractor will be interacting with.your plant personnel on this plant familiarization process.
The person at SNL responsible for overall management of the five-plant reassessments is Mr. Frederick T. Harper (505-846-1975). The contractor's team leader for your plant are Messrs. Jon Young and Dave Moore, Energy Incorporated (206-854-00E 1).
I would appreciate your naming a plant.
contact for day-to-day interactions.
If you could provide this name by telephone, I would appreciate it greatly.
Communications between the team leader and appropriate plant personnel should be as dir6ct as possible to facilitate information exchange.
However, I would like tci be informed of any major problems that might arise that potentially could affect the quality of
,C the work or the timeliness of its completion.
The plant familiarization process involves several aspects:
I I
l
~*
8507150545 850703 gDR ADOCK 0500 7
.va.us w i
..7 w:e rone sis (1o.3o3 uncu o24o OFFICI AL RECORD COPY
w
!!r. John Rahlh 2
1.
The team will need access to selected PTeIDs, elementary diagrans and ener-gency operating proceduros.
A list of items that will be needed is included as enclosure 1.
It would help the team considerably if they were able to get some of those diagrams and procedures prior to the plant visit. The team will be in touch with the plant to discuss these needs.
2.
The visit will include a walk-through and discussions with selected engi-neers and operators. Enclosure 2 characterizes the type of personnel that the teau will need to talk to. Again, the tean will discuss their specific needs with the plant.
3.
Examples of the types of questions that will be asked are provided as enclosure 3.
The tcan will provide a list of specific questions prior to the plant visit.
4.
The tean will need a continuing informal comunications channel with the plant after the visit to answer quick turnaround questions.
5.
After the analyses are completed (3 or 4 months after the plant visit), a revisit will be scheduled to confirm those plant features and procedures that appear to be nost important to risk.
The above identifies the mininum needs to provide reasonable assurance that the team uses the proper information in the analyses.
If you uish to provide even more support to this project to ensure hs realistic an assessacnt of your plant as possible in - the limited time available, we would certainly be agreeable.
For example, it would be very useful to have a knowledgeable engineer or operations person spend a couple of weeks with the team at Seattle, Washington to provide prompt, first-hand support to the analysts.
Thank you again for your cooperation.
The result of the plant visit will clearly be important to the accuracy, quality, and realism of the analyses and will definitely have a subsequent potential impact on regulation. He look formrd to working with you on this demanding task.
Sincerely, d
!!alcoln L. Ernst, Deputy Director Division of Risk Analysis and Operations Office of fluclear Regulatory Research L
Enclosures:
l, As stated l
~
cc: Fred Harper, SNL Tony Eng, HRC f on Young, EI J
A <p'( \\
~
l l
(
i
,RMA0/,RE 3 RRB D,,,,,,,,,/,RES C/,R B/,,A0/,R,ES,,,DD/, *, /,RE,s,,,,,,,,,,,,,
0 OFFICE p
!-+
.N.E:db/p1f P
wsky-,,GBur
- k rns
,,,,,/ p/,8s
,,,,/,, 8 s 7
7
/,8s 7
7 1.../../8s o^" >
NRC FORM 318 (1080) NRCM O240
\\
OFFIChAL RECORD COPY
f f
G Mr. John Ralston 3
i t
Distribution:
p RES Central File R-2912.01.01 l
CIRC /CHRON RRB Subject / Reading TEng Reading PBaranowsky Reading GBurdick Reading HErnst
}
FGillespie Dross 1
R:iinogue H. Thompson l
T. Speis L
C. Stable j
i R. Vollmer l
N. Grace, Region 11 j
E. Ford, Region II PDR l
Chattanooga-Hamfiton Bicentennial Library r
i I
o OF FICE )
.......... e SURNAMEk
............e DATE)
.........e N RC FORM 318 (10 80) NRCM O240 OFFICIR RECORD COPY