ML20127P002
ML20127P002 | |
Person / Time | |
---|---|
Site: | Harris, Brunswick, Robinson, 05000000 |
Issue date: | 05/29/1985 |
From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Utley E CAROLINA POWER & LIGHT CO. |
Shared Package | |
ML20127P005 | List: |
References | |
NUDOCS 8507020283 | |
Download: ML20127P002 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999
[Table view]Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) ML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl ML20211G9851999-08-26026 August 1999 Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20210P8221999-08-11011 August 1999 Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20210S9121999-08-11011 August 1999 Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) ML20210P8911999-08-10010 August 1999 Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part ML20210P9381999-08-10010 August 1999 Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML20210P2031999-08-0505 August 1999 Discusses Staff Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity for Plant,Units 1 & 2 BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI ML20210N2041999-08-0505 August 1999 Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1 1999-09-08 Category:NRC TO UTILITY MONTHYEARML20062G5581990-11-23023 November 1990
[Table view]Forwards Insp Repts 50-324/90-44 & 50-325/90-44 on 901022- 26.No Violations or Deviations Noted ML20058H9681990-11-20020 November 1990 Forwards Insp Rept 50-261/90-24 on 901029-1102 & Notice of Violation ML20062G3851990-11-19019 November 1990 Forwards Insp Repts 50-324/90-41 & 50-325/90-41 on 901002-1104.Violations Noted ML20058G5671990-11-0808 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/90-25 & 50-325/90-25 ML20062D3921990-11-0505 November 1990 Forwards Insp Repts 50-324/90-46 & 50-325/90-46 on 901017.No Violations or Deviations Noted ML20058H4371990-11-0101 November 1990 Forwards Summary of 901016 Enforcement Conference Re Events Surrounding 900819 Unit 2 Reactor Scram ML20058E9681990-10-30030 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/90-29 & 50-325/90-29 ML20058F3061990-10-29029 October 1990 Forwards Insp Repts 50-324/90-42 & 50-325/90-42 on 900924-28.No Violations or Deviations Noted IR 05000400/19900191990-10-18018 October 1990 Forwards Insp Rept 50-400/90-19 on 900910-14.No Violations or Deviations Noted ML20058B0511990-10-18018 October 1990 Forwards Insp Repts 50-324/90-37 & 50-325/90-37 on 900908-1001.Violations Noted ML20058B1141990-10-18018 October 1990 Forwards Insp Repts 50-324/90-32 & 50-325/90-32 on 900806-10.No Violations or Deviations Noted ML20059M7961990-09-20020 September 1990 Ack Receipt of Util 900806 Response & 900629 & 0308 Supplemental Responses to NRC 900308 Notice of Violation ML20059M6391990-09-19019 September 1990 Forwards Augmented Insp Team Insp Repts 50-325/90-36 & 50-324/90-36 on 900821-25 ML20059M1731990-09-13013 September 1990 Forwards Summary of 900806 Meeting in Atlanta,Ga Re Corporate Emergency Preparedness & Recent Drill Performance. List of Attendees & Viewgraphs Encl IR 05000324/19900191990-09-0505 September 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/90-19 & 50-325/90-19 ML20059M3591990-08-30030 August 1990 Discusses Region II 900808 Review of Emergency Response Facilities Focusing on Availability of Workspace & Communications for NRC Personnel in Event Agency Response Warranted.Summary of Mods/Additions to NRC Resources Encl ML20059H3271990-08-29029 August 1990 Forwards Summary of 900815 Meeting W/Util in Region II Ofc to Discuss Corrective Action Plan Re Requalification Program.List of Attendees Encl ML20059K8291990-08-27027 August 1990 Forwards Insp Repts 50-325/90-31 & 50-324/90-31 on 900730-0803.No Violations or Deviations Noted ML20059J0201990-08-24024 August 1990 Forwards Insp Repts 50-324/90-28 & 50-325/90-28 on 900723-27.No Violations or Deviations Noted ML20059D0261990-08-24024 August 1990 Forwards Partially Withheld Safeguards Insp Repts 50-324/90-30 & 50-325/90-30 on 900730-0803.No Violations or Deviations Noted ML20059H0751990-08-23023 August 1990 Forwards Insp Repts 50-324/90-26 & 50-325/90-26 on 900701-31 & Notice of Violation ML20058Q3961990-08-15015 August 1990 Forwards NRC Operational Evaluation Repts 50-324/OL-90-04 & 50-325/OL-90-04 on 900725 & 26 ML20058N1971990-08-0909 August 1990 Advises That 900730 Rev 5 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20058Q2231990-08-0303 August 1990 Forwards Corrected Summary Page for Insp Repts 50-324/90-27 & 50-325/90-27,per ML20056A7711990-08-0202 August 1990 Forwards Fr Notice of Withdrawal of 900419 Application to Amend Tech Spec 4.8.1.1.2.d.1 to Allow One Time Only Extension of Surveillances Until 901031 ML20059A7201990-08-0101 August 1990 Forwards Insp Repts 50-325/90-27 & 50-324/90-27 on 900709-12.No Violations or Deviations Noted ML20056A4871990-07-27027 July 1990 Confirms 900815 Mgt Meeting in Atlanta,Ga to Discuss Issues Re Operator Training Program,Including Root Cause & Corrective Actions,Shortcomings in Root Cause Analysis, Scheduling Future Insps & Integration of Action Plan Items ML20058L7041990-07-27027 July 1990 Confirms 900806 Mgt Meeting W/Util in Atlanta,Ga to Discuss Recent Significant Potential for Personnel Overexposure ML20058L7281990-07-26026 July 1990 Forwards Insp Repts 50-324/90-25 & 50-325/90-25 on 900709-13.Violations Noted & Under Consideration for Escalated Enforcement Action ML20058L7381990-07-25025 July 1990 Ack Receipt of 900628 Response to Confirmation of Action Ltr Re Results of Root Cause Analysis for Failures of Requalification Exam & Operational Evaluation & Associated long-term Corrective Action Plan ML20056A9071990-07-17017 July 1990 Forwards Insp Repts 50-324/90-19 & 50-325/90-19 on 900601-30 & Notice of Violation ML20058L7731990-07-16016 July 1990 Forwards Operational Evaluation Repts 50-324/90-03 & 50-325/90-03 on 900609-10.Results of Evaluations Discussed ML20055F6951990-07-13013 July 1990 Advises That Util 900502 Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plant' Per 10CFR50.54(f) Meets All Guidance Provided in Generic Ltr ML20055H4291990-07-13013 July 1990 Forwards Insp Repts 50-324/90-22 & 50-325/90-22 on 900611-15.No Violations or Deviations Noted IR 05000324/19900021990-07-11011 July 1990 Documents 900610 Approval for Restart of Plant in Confirmation of Action Ltrs 50-324/90-02 & 50-325/90-02 on 900521 ML20055H4111990-07-11011 July 1990 Forwards Insp Repts 50-324/90-23 & 50-325/90-23 on 900611-15.No Violations or Deviations Noted.Insp Concluded That Adequate Control Over Engineering Work Requests Existed ML20055H4551990-06-28028 June 1990 Confirms 900622 Telcon Scheduling 900823 Mgt Meeting at Plant Site Re Status of Integrated Action Plan & Schedule for Upcoming Unit 1 Refueling Outage ML20055H3861990-06-27027 June 1990 Forwards Insp Repts 50-324/90-21 & 50-325/90-21 on 900521- 25.No Violations or Deviations Noted.Separate Insp to Review Engineering Work Requests Scheduled Due to Concerns Raised in Area IR 05000324/19900141990-06-26026 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/90-14 & 50-325/90-14.NRC Understands That Supplemental Response Will Be Issued by 900723 Re Improvement of Equipment Anomalies ML20059M8571990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20248J0701989-10-0303 October 1989 Forwards Insp Rept 50-261/89-21 on 890911-15.No Violations or Deviations Noted ML20248H9361989-09-28028 September 1989 Forwards Insp Rept 50-400/89-20 on 890905-06.No Violations or Deviations Noted.Rept Details Withheld (Ref 10CFR2.790 & 73.21) ML20248F1341989-09-28028 September 1989 Forwards Insp Repts 50-324/89-30 & 50-325/89-30 on 890905-08.No Violations or Deviations Noted ML20248C8621989-09-26026 September 1989 Forwards Insp Repts 50-325/89-24 & 50-324/89-24 on 890814-18.No Violations or Deviations Noted.Unresolved Item Noted ML20248A9041989-09-22022 September 1989 Forwards Insp Repts 50-324/89-20 & 50-325/89-20 on 890801-31 & Notice of Violation.Particular Attention in Response to Identification of Root Cause of Problem of Similarity to Violation Noted in Notice Forwarded by Requested ML20248C4621989-09-22022 September 1989 Forwards Corrected Pages to Insp Repts 50-324/89-22 & 50-325/89-22 ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20247K8691989-09-18018 September 1989 Forwards Invoice for OL Review Cost for 840624-851115,per 850510 Concern Re Charging Fees After Decision to Cancel Unit.Costs Include staff-hours & Contractural Costs Expended from CP Issuance Through 851115 IR 05000324/19890111989-09-15015 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/89-11 & 50-325/89-11 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217G1191999-10-0808 October 1999
[Table view]Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G9851999-08-26026 August 1999 Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 ML20210P8221999-08-11011 August 1999 Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20210S9121999-08-11011 August 1999 Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) ML20210P8911999-08-10010 August 1999 Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part ML20210P9381999-08-10010 August 1999 Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210N2041999-08-0505 August 1999 Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1 ML20210P2031999-08-0505 August 1999 Discusses Staff Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity for Plant,Units 1 & 2 ML20210Q4581999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section to Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit List of Individuals to Take exam,30 Days Before Exam Date ML20210G2941999-07-28028 July 1999 Discusses Public Meeting Conducted on 990720 to Present Results of Periodic Plant Performance Review for Brunswick Facility for Period of May 1997 to January 1999.List of Attendees Encl ML20210E1181999-07-19019 July 1999 Forwards Insp Repts 50-324/99-04 & 50-325/99-04 on 990509- 0619.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML20196H8191999-06-21021 June 1999 Informs That on 980915,Commission Suspended SALP Program for an Interim Period Until NRC Completes Review of Process for Assessing Performance at NPPs ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196A8111999-06-14014 June 1999 Ack Receipt of 990401 Response to NRC Ltr Issued on 990302 Re OI Investigation to Determine Whether Former BSEP Manager Threatened to Fire Employees Who Brought Safety Concerns to Nrc.Concluded That No Violation Occurred ML20195J1971999-06-14014 June 1999 Advises That GE-NE-523-B13-01920-56,Rev 1,submitted with 990202 Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20195H6931999-06-0707 June 1999 Forwards Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20195E8721999-05-28028 May 1999 Informs That Meeting Re Recently Completed Plant Performance Review for Licensee Facility Scheduled for 990720 ML20207B6081999-05-27027 May 1999 Informs That Staff Finds That RWCU Sys Piping Outboard of Second CIV at Bsep,Units 1 & 2,meets Staff Criteria of Schedule a as Delineated in Encl.Licensee Proposal to Eliminate Augmented Insp Per GL 88-01,acceptable ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML20206G1811999-05-0404 May 1999 Forwards SE Approving Three of 25 Relief Requests Submitted by for Third 10-year ISI Program.Remaining Reliefs Will Be Evaluated in Separate SEs ML20206B9291999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.Three Violations Being Treated as non-cited Violations ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability ML20206A1561999-04-0909 April 1999 Informs That on 990316,M Herrell of CP&L & Author Confirmed Initial Operator Licensing Exam Schedule for Y2K. Initial Exam Dates Will Be Wks of 000214 & 20 for Approx 16 Candidates.Nrc Will Write Exam ML20205Q1341999-04-0909 April 1999 Forwards Insp Rept 50-400/99-09 on 990308-0312.No Violations Noted ML20205J9121999-03-31031 March 1999 Informs That Effective 990328,A Hansen Became NRR Licensing Project Manager for Brunswick Steam Electric Plant,Units 1 & 2 ML20205F8681999-03-30030 March 1999 Discusses Approval of Change to EP Eliminating Incorporation of Technical Support Center Into Protected Area.Forwards SE Related to Location of Technical Support Center ML20205D5541999-03-30030 March 1999 Discusses Core Shroud Reinsp Plan Submitted by CP&L on 980828 & 981221 for BSEP Unit 2 Refueling Outage 13 (B214R1) Scheduled to Begin on 990417.Concludes That Proposed Reinsp Plan & Schedule for Reinsp of Weld H5 Acceptable ML20205E8281999-03-25025 March 1999 Responds to ,Written on Behalf of M Black Re Request for 30 Day Extension of Comment Period Associated with CP&L Proposed Increase in Sf Storage Capacity at Facility in Wake County,Nc ML20205D2931999-03-23023 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990204,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan for Next Eight Months Encl ML20205E8481999-03-19019 March 1999 Responds to Requesting Extension of Comment Period Re Proposed Amend for Plant ML20204J8071999-03-18018 March 1999 Forwards Insp Repts 50-324/98-14 & 50-325/99-14 on 990111-15,25 & 29.Violations Being Treated as non-cited Violations ML20204J7241999-03-15015 March 1999 Forwards Insp Repts 50-324/99-01 & 50-325/99-01 on 990103- 0212.No Violations Noted.Five Violation Being Treated as non-cited Violations ML20207H4291999-03-0202 March 1999 Discusses NRC OI Rept 2-1998-014 on 980429-990112.NRC Determined That There May Have Been Atmosphere at BSEP Such That Employees Were Reluctant to Report Safety Problems. Requests Written Response Re Position on Environ ML20203D5831999-02-10010 February 1999 Forwards Biological Opinion for CP&L Review & Comment Re Impact on Endangered Sea Turtles of Operation of Brunswick Steam Electric Plant ML20203D6871999-02-0909 February 1999 Forwards SER Accepting Licensee 980225 & 0806 Relief Requests PRR-02,VRR-02,VRR-03,VRR-05,VRR-11,VRR-12 & RFJ-03, Associated with Third 10-year Interval Inservice Testing Program for Brunswick Steam Electric Plant,Units 1 & 2 ML20203G5371999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20202J5761999-01-28028 January 1999 Forwards Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Evaluated 990120 Response to NOV 50-325/98-10-03 & Found Response Meets Requirements of 10CFR2.201 ML20199K9921999-01-22022 January 1999 Ack Receipt of Util 990112 Withdrawal of Request for Exemption, from 10CFR70.24 Requirements for Criticality Monitoring Sys in Areas of Brunswick Steam Electric Plant ML20199G7621999-01-15015 January 1999 Responds to Util ,As Supplemented by 980225 & 0520 Ltrs,Describing Spring 1998 Core Shroud Reinspection Plan for Unit 1.NRC Found Plan Acceptable ML20199K3071999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Copy of Organization Charts for Info Encl ML20198P0121998-12-28028 December 1998 Ltr Contract:Task Order 35, Brunswick Safety Sys Engineering Insp, Under Contract NRC-03-98-021 ML20206R8781998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl 1999-09-29 |
See also: IR 05000261/1985016
Text
f hN
MAY 2 91985
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Executive Vice President
Power Supply and Engineering
and Construction '
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT N05. 50-261/85-16, 50-324/85-13, 50-325/85-13 AND 50-400/85-17
On May 6-9, 1985, NRC inspected activities authorized by NRC Operating License
Nos. DPR-23, DPR-62, DPR-71 and NRC Construction Permit No. CPPR-158 for your
H. B. Robinson, Brunswick, and Shearon Harris facilities and your Harris Energy
and Environmental Center. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed inspection
report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verre11i, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report 50-261/85-16,
50-324/85-13, 50-325/85-13
and 50-400/85-17
cc w/ enc 1:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
G. P. Beatty, Jr., Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
- R. A. Watson, Vice President
l Harris Nuclear Project
'
R. M. Parsons, Project General Manager
bec w/ encl: (See page 2)
g7020283850529
G ADOCK 05000261
PDR 16 C/ -)
--
r
. .
_;, . J
-
Carolina Power and Light Company 2
-bec w/ encl:
NRC Resident Inspection
Document Control Desk
State of North Carolina
.
RII RII RII I RII RII
h\A g/h/3 lbA ^< -
,
J'
WGloersen: km SAdamovitz DMontgomery $ Collins AHa i DVe elli
05/)(p5 OS S Y/85 05/J+/85 05/111/85 05/;2V85 05h /85
.,