Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML20134L342 | 22 August 1985 | Rancho Seco | Responds to 850809 Request for Authorization to Use ASME Code Case N-411 for Application in Response Spectrum Seismic Analysis of Piping Sys.Compliance W/Commitments to Revise USAR & Request Acceptable |
ML20134M623 | 19 August 1985 | Rancho Seco | Forwards Safety Evaluation Accepting Util 831104 Response to Generic Ltr Item 4.5.1 Re on-line Functional Testing of Reactor Trip Sys |
ML20135B315 | 27 August 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-22 on 850812-16.No Noncompliance Noted |
ML20135B449 | 26 August 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-19 on 850623-0809.Enforcement Conference Scheduled for 850906 to Discuss Inadequacies That Resulted in Leak in 1-inch Diameter B Hot Leg Vent Piping W/Plant in Hot Shutdown Condition |
ML20135C188 | 4 September 1985 | Rancho Seco | Grants Util 850822 Request for 30-day Extension for Submittal of Semiannual Radioactive Effluent Release Rept. Future Repts Expected to Be Submitted in Timely Manner |
ML20135D161 | 11 September 1985 | Rancho Seco | Requests Fee for 850809 Application Re Use of New ASME Case Code on Damping Values (N-411) |
ML20135E589 | 6 September 1985 | Rancho Seco | Requests Review of Encl Questions & Confirmation of Continued Assistance in Resolution of Generic Issue 77 Re Flooding of Safety Equipment Compartments by Backflow Through Floor Drains |
ML20135E857 | 9 September 1985 | Rancho Seco | Forwards Amend 74 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Define Testing Requirements for Pressurizer Heaters Powered from Class 1E Power Sources |
ML20135F326 | 30 August 1985 | Rancho Seco | Forwards Amend 73 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Change Name of Reactor & Auxiliary Bldg Stacks & Reactor & Radwaste Svc Area Vent to Particulate Samplers |
ML20135F741 | 9 September 1985 | Rancho Seco | Forwards Amend 75 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Define Fire Hose Acceptability & Correct Inconsistencies in Reporting Requirements |
ML20135F794 | 11 September 1985 | Rancho Seco | Advises That Several Changes Requested in 841212 Proposed Tech Spec Amend 102 Not Supported by Safety Evaluation. Safety Evaluation or Other Basis for Listed Proposed Mods Requested |
ML20135H734 | 9 September 1985 | Rancho Seco | Forwards SALP Rept 50-312/85-18 for Dec 1983 - May 1985, Conducted on 850807.Overall Performance Acceptable |
ML20136A715 | 24 December 1985 | Rancho Seco | Forwards Amend 78 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Define Requirements for Calibr of power-range Neutron Instrumentation |
ML20136C513 | 24 December 1985 | Rancho Seco | Forwards Amend 77 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Define Surveillance Requirements for Installed Snubbers |
ML20136G408 | 19 November 1985 | Rancho Seco | Informs That Review of Financial Info Submitted for 1985 in Satisfies Requirements of 10CFR140 That Licensee Maintain Approved Guarantee of Deferred Premiums for Each Operating Reactor Wholly or Partially Owned |
ML20136G568 | 19 December 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-31 on 851024-1122.No Violations Noted |
ML20137A646 | 6 November 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-27 on 850918-1017.No Violations Noted |
ML20137B515 | 24 December 1985 | Rancho Seco | Forwards Exemption from Requirements of 10CFR50.44(c)(3) (Iii),Re Installation of Reactor Vessel Head Vent Based on Verification That Noncondensible Gas Bubble Can Be Safely Removed Via Hot Leg High Point Vents,Per 850412 Request |
ML20137G831 | 25 November 1985 | Rancho Seco | Ack Receipt of Re Steps Taken to Improve Performance in SALP Functional Areas Rated Category 3 in 850909 SALP Rept.Corrective Actions Will Be Verified During Future Insp |
ML20137G995 | 14 January 1986 | Rancho Seco | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/85-28 |
ML20137L190 | 29 November 1985 | Rancho Seco | Forwards Enforcement Conference Rept 50-312/85-33 on 851115.No Violations Noted |
ML20137L521 | 22 January 1986 | Rancho Seco | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/85-30 |
ML20137N807 | 30 January 1986 | Rancho Seco | Forwards Safeguards Insp Rept 50-312/85-34 on 851114 & 1202-12.Requests Comments within 30 Days Re Aspects of Security Program Warranting Attention.Insp Will Be Conducted to Resolve Concerns.Rept Withheld (Ref 10CFR73.21 & 2.790) |
ML20137T225 | 20 November 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-30 on 850928-1031 & Notice of Violation |
ML20137T691 | 31 January 1986 | Rancho Seco | Forwards Insp Rept 50-312/85-32 on 851101-1217.No Violations or Deviations Noted |
ML20137W086 | 5 December 1985 | Rancho Seco | Confirms 851212 Meeting W/Util in Walnut Creek,Ca to Discuss Insp Rept 50-312/85-28 Findings Associated w/NUREG-0737, Item II.B.3, Post-Accident Sampling Sys, Per 851204 Telcon |
ML20137X736 | 22 November 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-28 on 850923-27 & 1007-15 & Notices of Violation & Deviation |
ML20137Y058 | 18 February 1986 | Davis Besse Oconee Arkansas Nuclear Crystal River Rancho Seco Midland Bellefonte 05000000 | Requests facility-specific Info Re Requests for Exemption from GDC 4,concerning Protection Against Dynamic Loads Resulting from Postulated Breaks of Primary Main Loop Piping.Info Re Leakage Detection Sys Should Be Included |
ML20137Y364 | 28 February 1986 | Rancho Seco | Forwards Safeguards Insp Rept 50-312/86-04 on 860203-07. Enforcement Action Will Be Subj of Separate Correspondence. Rept Withheld (Ref 10CFR73.21 & 2.790) |
ML20137Y885 | 30 September 1985 | Rancho Seco | Forwards Amend 76 to License DPR-54 & Safety Evaluation. Amend Revises Tech Specs to Provide Conformance W/ Regulations Governing Inservice Insp & Insp of Steam Generator Tubes Set Forth in 10CFR50.55a(g) |
ML20137Z623 | 27 September 1985 | Rancho Seco | Requests Unescorted Access of NRC & NRC Contractor Employees for Insp Activities on 850930-1004.Individuals Listed in Encl Should Be Provided w/site-specific Training in Radiological Protection,Emergency Response & Security |
ML20137Z636 | 20 February 1986 | Rancho Seco | Forwards Insp Rept 50-312/85-36 on 851218-860131.No Violation Noted |
ML20138B213 | 4 October 1985 | Rancho Seco | Confirmatory Action Ltr Re 851004 Telcon Concerning Return of Facility to Power Operations After 851002 Reactor Trip. Util Must First Conduct Root Cause Analysis of Trip & Provide Briefing to NRC Before Return to Power |
ML20138H571 | 11 December 1985 | Rancho Seco | Forwards Exam Rept 50-312/OL-85-02 of Exams Administered on 851029-31 |
ML20138P603 | 9 October 1985 | Oconee Arkansas Nuclear Three Mile Island Crystal River Rancho Seco 05000000 | Forwards SER of Util Response to Items 3.1.3 & 3.2.3 of Generic Ltr 83-28.No post-maint Testing Requirements Exist Which Degrade Safety.Technical Evaluation Rept Encl |
ML20138P798 | 17 December 1985 | Rancho Seco | Forwards Draft SAIC-85/1524-16 Re Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review:Data & Info Capabilities. Response Acceptable in Two Areas & Incomplete in Three.Addl Info Requested to Permit Completion of Review |
ML20138Q930 | 20 December 1985 | Rancho Seco | Discusses 840620 Rev to 10CFR170 Re Billing Procedures. Bills Recently Issued Under Category 1 for Cycle Ending 841222.Billing Categories 2-5 Can Expect Bills for First Cycle Shortly.Future Notice Prior to Billing Will Not Occur |
ML20138R287 | 17 December 1985 | Rancho Seco | Accepts 850322 Rev 1 to TI-80, Operating Training Program for NRC Hot License Candidates & Rev 1 to T2-80, NRC Licensed Operator Retraining Program |
ML20138R338 | 17 December 1985 | Rancho Seco | Forwards SER Accepting Util Response to Generic Ltr 83-28, Items 4.2.1 & 4.2.2 Re Reactor Trip Sys Reliability,Provided That Util Confirms That Undervoltage Trip Armature Down When Roller rivet-armature Clearance Measured |
ML20138R525 | 13 November 1985 | Rancho Seco | Ack Receipt of & Payment of $50,000 for Civil Penalty Proposed in NRC |
ML20138R962 | 14 November 1985 | Rancho Seco | Grants Exemption from 10CFR170.11(b) Fee Requirements for 830922 Application to Extend Time for Implementing Shift Staffing Requirements.List of Applications Re Facility,Fees Paid & Final Fee Determination for Each Encl |
ML20140B308 | 10 January 1986 | Rancho Seco | Forwards Site Survey of Rancho Seco Maint Program & Practices, Technical Ltr Rept of Survey Conducted on 850930-1004.Rept Will Be Used to Evaluate Need to Modify Existing Regulatory Oversight of Maint Practices |
ML20141B061 | 31 March 1986 | Rancho Seco | Informs That 850919 Proposed Amend 82,Rev 1 to License DPR-54 Re Use of Mechanical Snubbers on Auxiliary Feedwater Header Fee Exempt.Refund Will Be Processed |
ML20141F207 | 20 December 1985 | Rancho Seco | Forwards Insp Rept 50-312/85-35 on 851205-06.No Violation Noted |
ML20141J043 | 11 April 1986 | Rancho Seco | Forwards Insp Rept 50-312/86-05 on 860116-24 & Notice of Violation |
ML20141J169 | 7 April 1986 | Rancho Seco | Forwards SER Re Spds.Sys Does Not Incorporate Human Factors Considerations Into Design & Does Not Permit User to Rapidly & Reliably Evaluate Critical Safety Function.Schedule for Response to Concerns Requested |
ML20141M952 | 29 January 1986 | Rancho Seco | Informs That Commission Requested Publication of Encl Fr Notice of Environ Assessment & Finding of No Significant Impact Re 850228 & 1107 Requests for Exemption from Subsection Iii.L of 10CFR50,App R |
ML20141N969 | 3 March 1986 | Rancho Seco | Forwards Exam Rept 50-312/OL-86-01 of Exam Administered on 860204-06 |
ML20151L626 | 20 December 1985 | Rancho Seco | Notifies That NRC Will Not Send Representative to Participate in District Scenario Development Committee,Per 851211 Request.Participation in Emergency Preparedness Activities Not Compatible W/Nrc Responsibilities |
ML20153E256 | 21 January 1986 | Rancho Seco | Forwards Insp Rept 50-312/86-03 on 860106-10.No Violation Noted |