Forwards Draft SAIC-85/1524-16 Re Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review:Data & Info Capabilities. Response Acceptable in Two Areas & Incomplete in Three.Addl Info Requested to Permit Completion of Review
ML20138P798
Person / Time
Site: Rancho Seco
Issue date: 12/17/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20138P800 List:
References
GL-83-28, NUDOCS 8512260265
Download: ML20138P798 (2)


Text

_ -. -

December 17, 1985 DQ Qh Docket No. 50-312 DjSTRTRUTTOP{

Wqcket Filed BGrimes NRC PDR- JPartlow L PDR RIngram Mr. Ronald J. Rodriguez PBD-6 Rdg SMiner Assistant General Manager, Nuclear FMiraglia Gray File Sacramento Municipal Utility District 0 ELD EBrach 6201 S Street ACRS-10 H0rnstein P. O. Box 15830 EJordan

-Sacramento, California 95813

Dear Mr. Rodriguez:

SUBJECT:

RANCHO SEC0 NUCLEAR GENERATING STATION - DRAFT TECHNICAL EVALUATION REPORT-(TER) FOR SALEM ATWS ITEM 1.2 (GENERIC LETTER 83-28)

The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. For the

- Rancho Seco Nuclear Generating Station, your response was found to be acceptab13 in two areas evaluated, and incomplete in three of the areas evaluated.

The enclosed TER-provides a technical evaluation representing the staff's ,

initial judgment of-the areas evaluated. Pen and ink changes have been made i to the TER by your Project Manager to make the wording consistent with our -

approach.

In order to preserve our present review schedule, we would apprecinte your cooperation in obtaining additional information that will permit us to complete our review. It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the DRAFT TER. Your Project Manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.

Sincerely,

%aGis11sIczri:o g JCU:i2. sw.gSy John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B

Enclosure:

DRAFT TER on Salem ATWS Item 1.2 cc w/ enclosure:

See next page h

PBD-6h PB9 PBD-6 SMin W;cf JStoll RWeller 12//6 /85 12/p/85 12/g/85 8512260265 851217 PDR ADOCK 05000312'  !

P PDR  !

l J

Mr. R. J. Rodriguez Rancho Seco Nuclear Generating Sacramento Municipal Utility District Station cc:

Mr. David S. Kaplan, Secretary Sacramento County and General Counsel Board of Supervisors Sacramento Municipal Utility 827 7th Street, Room 424 District Sacramento, California 95814 6201 S Street P. O. Box 15830 Ms. Helen Hubbard Sacramento, California 95813 P. O. Box 63 Sunol, California 94586 Thomas Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 1800'M Street, N.W.

Washington, D.C. 20036 Mr. Robert B. Borsum Babcock & Wilcox

-- Nuclear Power Generation Division Suite ??0, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector / Rancho Seco c/o U. S. N. R. C.

14410 Twin Cities Road Herald, California 95638 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Director Energy Facilities Siting Division Energy Resources Conservation &

Development Commission 1516 - 9th Street Sacramento, California 95814 Mr. Joseph 0. Ward, Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building #8 Sacramento, California 95814 O

J

, - - r -- . . , . . . . - - - . . , _ , - . , . --- - . . . - , . - .-.n.- . , - . -