Grants Exemption from 10CFR170.11(b) Fee Requirements for 830922 Application to Extend Time for Implementing Shift Staffing Requirements.List of Applications Re Facility,Fees Paid & Final Fee Determination for Each Encl
ML20138R962
Person / Time
Site: Rancho Seco
Issue date: 11/14/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8511190315
Download: ML20138R962 (3)


Text

_ _ . . . _ _. _. _ .. . . , .. .

DISTRIBUTION:lAlfCAcl.

PDR LPDR Reg Files (016)

SMiner, ORB-4 RIngram, ORB-4 RMDiggs NOV 14 W LFMS Reactor File LFMS Pending Check File LFMS R/F Docket' No. 50-312 1

Sacramento Municipal Utility District ATTH: Mr. Ronald J. Rodriguez

. Executive Director, Nuclear

- 6201 S Street Post Office Box 15830 Sacramento, California 95313 Gentlemen:

We have completed a Part 170 fee review of certain a

^

with the Office of Nuclear Reactor Regulation (OfiRR)pplications for review in filed connection with the Rancho Seco Nuclear Generating Station.

The enclosed list reflects each request, any fees paid and the OliRR staff's final fee detemination and action on each. As a result of the final review of these applications, we find that a sum of $2,950 is due the NRC. It is requested that the District remit the $2,950 to this office to complete the Part 170 fee requirements for these applications.

It has been determined that Item 6 on the enclosed list should be exempted from the fee requirements of 10 CFR 170 of March 23, 1978, since the application was approved pursuant to 10 CFR 50.12 and no license amendment was issued. On this basis, we have concluded that an exemption, pursuant to 10 CFR 170.ll(b), from the fee requirements of the March 23,1978 regulations is authorized by law and is hereby granted for the September 22, 1983 application.

Sincerely, OHeantshamestg wm.O.mme .

William 0. Miller, Director License Fee Management Staff Office of Administration 1

Enclosure:

List of Applications and Fees Paid 8511190315 851114 PDR ADOCK 05000312 P_ .PDR h

==> L MS:ADM gj , [,,, LF [ADM LhMS:ADM . . . . .

. ' . . ' " .pe ggs:) , CJHo, y, ,W0Mi.ller. . . ..

""* , 11 _ 85

..II/b../85 11/h[/85..

ne ronu sin tio.co3 nacu o24o OFFICIAL RECORD COPY .

LIST OF APPLICATIONS AND FEES PAID Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station _

Docket No. 50-312 Fees Fees ONRR's Fee Deter-Application Date Paid Applicable mination & Action

1. 8/31/79 S4,000 $4,000 Involved consideration of a Deviation from previously single safety issue. Approved approved modifications for by letter dated 10/16/79.

west 480 volt switchgear room.

2. 9/4/79 4,000 none Accepted as being supple-Deviation from previously mental to the 8/31/79 appli-approved modifications for cation. Approved by letter east 480 volt switchgear dated 10/16/79.

room.

3. 1/28/82 none 4,000 Involved consideration of a One-time approval to purge single safety issue. Approved reactor containment. by letter and Safety Evalua-tion dated 1/29/82.
4. 2/17/83, as modified 4,000 12,300 Complex review involving a 7/12/83, 1/8/85,-2/7/85 number of safety issues.

and 3/18/85 Approved by Amendments 49 and Several changes re trip 68 on 8/3/83 and 6/4/85, resp.

setting limits SR for anticipating reactor trip, modifications to electrical distribution system, et al.

5. 3/31/83 4,000 none Exemption to 3/14/83 Order No review done on the request and none will be done.

requiring submittal of safety valve analysis by March 1983.

6. 9/22/83, as supplemented 1,200 none Exempt - Approved pursuant Extension of time for to 10 CFR 50.12 on 6/8/84.

implementing shift staffing requirements.

7. 10/4/84 and 3/7/85 150 none Not viewed as application Post accident sampling subject to fees of 10 CFR capabilities.

170. Ltr 3/28/85 found procedure to be acceptable.

2 TOTAL FEES APPLICABLE . . . $20,300 TOTAL FEES PAID . 17,350 FEES DUE NRC. . . ,$2,950