ML20135C188

From kanterella
Jump to navigation Jump to search
Grants Util 850822 Request for 30-day Extension for Submittal of Semiannual Radioactive Effluent Release Rept. Future Repts Expected to Be Submitted in Timely Manner
ML20135C188
Person / Time
Site: Rancho Seco
Issue date: 09/04/1985
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8509110350
Download: ML20135C188 (1)


Text

-

p- -. -

s v .

,,, a 4 SEP 0419851

.; " t i

Docket ' No. 50-312 -

~

Sacramento Municipal Utility District 3 P. O. Box 15830 .

Sacramento, California 95832-1830 '

' Attention: Mr. R. J. Rodriguez-Assistant General Manager, Nuclear ,

~.. ,

Gentlemen: 1

Subject:

Request for extension of due date for Semi-Annual Radioactive Effluent Release Report Regarding your request dated August 22, 1985, we expect your report will be submitted by September 29, 1985.

In view of this and previous requests for delay in submittal of routine radiological reports we hope you will take such actions as necessary to assure future reports are submitted in a timely manner.

~

Sincerely, h

RossA.Acarano,. Director O

~ Division of Radiation Safety-and Safeguards cc:

L. G. Schwieger, SMUD-P. Oubre, SMUD State of CA ~

bec: _ _

RSB/ Document Control Desk (RIDS)-

Mr., J. Martin Mr. B.1 Faulkenberry G. Cook Resident Inspector RV 67[ -

1 GYuhas:dh awski RScarano 8/#1 /85- 8/f4 85 8/ff/.85 h5000 2 '

85091{0 l

w -

F,y

~

qa - J DSMUDSACRAMENTO MUNICIPAL UTIUTY DISTRICT C 62o1 s Street. P.O. Box 15830, Sacramento CA 95852-1830,(916) 452 3211 l

AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-371 August 22, 1985 J B MARTIN REGIONAL ADMINISTRATOR REGION V 0FFICE OF INSPECTION & ENFORCEMENT U S NUCLEAR REGULATORY COMMISSION 1450 MARIA LANE SUITE 210 WALNUT CREEK CA 94596 SUBMITTAL DATE FOR SEMI-ANNUAL REPORT The Sacramento Municipal Utility District requests an extension of the due date for submittal of the Semi-Annual Radioattive Effluent Release Report. The present due date is August 30, 1985. We request a 30 day extension to '

September 29, 1985.

This extension is requested because of a delay we have experienced with our vendor in receiving the sampling analysis results report that is a significant portion of the Semi-Annual Report. The rough draft of the analysis report was received from the vendor during the week of August 12, 1985, and is scheduled to be reviewed and returned with connents to the vendor by August 24, 1985. The final copy of the sampling analysis results report is not expected to be received from the vendor until September 12, 1985.

If you have any questions regarding this matter, please contact Mr. Ron Colombo at Ran o eco Nuclear Generating Station.

\ s R. J. RODRIG Z ,

ASSISTANT GENERAL MANA ,

NUCLEAR h

f h 3 3 N

b

- a t a 1 -

% , y,I n ,1 , d e svP*T 1 t'- y-y RANCHO SECO NUCLEAR GENERATING STAilON i 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333 2935 e