Forwards Insp Rept 50-312/85-19 on 850623-0809.Enforcement Conference Scheduled for 850906 to Discuss Inadequacies That Resulted in Leak in 1-inch Diameter B Hot Leg Vent Piping W/Plant in Hot Shutdown Condition
ML20135B449
Person / Time
Site: Rancho Seco
Issue date: 08/26/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20135B452 List:
References
NUDOCS 8509110060
Download: ML20135B449 (2)


See also: IR 05000312/1985019

Text

.

. -

-

.

p

pKf2

o UNITED STATES

!" a NUCLEAR REGULATORY COMMISSION

. y, ' . ,E REGKW V

  1. 1450 MARIA LANE, sulTE 210

4

g * . . . * ,o'g WALNUT CREE K, CALIFORNI A 94596

-

b5 P 1985 AUG 261985

Docket No. 50-312

.

Sacramento Municipal Utility District

P. O. Box 15830

Sacramento, California 95813

Attention: Mr. Ron Rodriguez

Assistant General Manager, Nuclear

Gentlemen:

Subject: NRC Inspection of Rancho Seco

This refers to the routine inspection conducted by Messrs. J. H. Eckhardt,

G. P. Perez, J. L. Crews, A. J. D'Angelo, and H. J. Wong of this office

between June 23 and August 9,1985, of activities authorized by NRC License

No. DPR-54, and to the discussion of our findings held by inspectors with

Mr. P. Oubre' and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of our inspection, we believe that you failed to

implement adequate engineering and design controls, construction controls,

quality control inspections, and quality assurance oversight during

modifications to the reactor coolant high point vent system. These

inadequacies resulted in a leak in the one inch diameter B hot leg vent piping

with the plant in a hot shutdown condition. An enforcement conference has

been scheduled for September 6, 1985, in the NRC Region V office. At this

conference you should be prepared to discuss your evaluation of the cause of

the apparent violation discussed in the inspectic1 report; corrective actions

taken or planned; and your plans for improving oversight of these functions.

Enforcement actions relative to the-issues discussed in the enclosed report

will be the subject of separate correspondence.

g% 2

O

I f

G/

c

-

.

Sacramento Municipal Utility District -2- AUG '9 9' 1985

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

C:lir, ' ' "!

D. ' , .h

D. F. Kirsch, Acting Director

Division of Reactor Safety

and Projects

Enclosures:

Inspection Report

No. 50-312/85-19

cc w/ enclosures:

L. G. Schwieger, SMUD

P. Oubre', SMUD

State of CA

bec: RSB/ Document Control Desk (RIDS)

Mr. J. Martin

Resident Inspector

-

G. Cook

.

A 0

q N_ j f/

RV

(% K K AyfallA

JEckhardt:dh GPerez JCrews AD'Angelo HWong LMiller DKirsch @

8/ /85 8/ /85 8/ /85 8/ /85 8/ /85 8 /85 S/ M 85 y/g/gj