ML20012A901 | 27 February 1990 | Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp | |
ML20023D036 | 23 October 1981 | Deficiency Rept Re Errors & Discrepancies Contained in HVAC Matl Certifications.Procurement Documentation Will Be Revalidated,Document & Records Mgt Program Will Be Developed & Qa/Qc Personnel Will Be Added.Also Reportable Per Part 21 | |
ML20024B695 | 30 June 1983 | Part 21 Rept Re Deficiency in Bechtel Design of Ac & Dc Control Circuits for Facilities.Design Changes to Affected Motor Controller & Power Circuit Breaker Compartments Initiated.Also Reported Per 10CFR50.55(e) by Snupps | |
ML20024B777 | 7 July 1983 | Final Deficiency Rept 83-03 Re Medium Voltage Circuit Breakers of Same Type Installed at Limerick Which Inadvertently Closed After Completion of Spring Charging Due to Slipped Close Latch,Discussed in Brown Boveri 830524 Ltr | |
ML20024B784 | 28 April 1983 | Followup Interim Rept Re Potential Deficiency in 5HK Switchgear Supplied by Brown Boveri.Circuit Breaker Inadvertently Closed & Tripped Following Spring Charging. Light Spring Added to Close Latch | |
ML20024C056 | 24 June 1983 | Significant Deficiency Rept 74 Re 4 Kv Switchgear Supplied by Brown-Boveri,Inc.Initially Reported on 830225.Circuit Breakers & Ground Trucks Will Have Spring Added to Close Hatch.Final Rept Will Be Provided by 830826 | Safe Shutdown |
ML20024D063 | 22 July 1983 | Final Significant Deficiency Rept 83-10 Re Excessive Ac/Dc Control Circuit Voltage Drop in Circuits Designed by Bechtel.Initially Reported on 830623.Also Reportable Under Part 21 | |
ML20024D178 | 5 April 1978 | Final Deficiency Rept SDR 5 Re Cold Formed back-to-back Channel Shop Welding.Initially Reported on 780307.Rev to Matl Specs & Actual Load Analysis Completed on 780324.Repair of Supports Previously Installed to Be Completed by 780801 | |
ML20024D637 | 29 July 1983 | Final Significant Deficiency Rept 83-09,re 1 1/2-inch Hy-Drop Stainless Steel Valves Furnished by Yarway Corp. Reexam of Design,Procurement & Site Receiving Records Indicates Original Data Based on Inaccurate Info | |
ML20024E866 | 30 December 1982 | First Interim Deficiency Rept Re Failure of safety-related Electrical Equipment to Meet Requirements.Initially Reported on 821203.Equipment Potentially Affected Are Panels & Cabinets.Next Rept to Be Filed by 830228 | |
ML20028A010 | 28 October 1982 | Part 21 Rept Re Potential Defect in Component of Dsrv or Dsr Standby Diesel Generator.Problem Exists W/Engine Piston Skirt Casting Which Could Result in Engine Nonavailability | |
ML20028A809 | 18 November 1982 | Part 21 Rept Re Error on Four Local Instrument Panel Piping Diagrams,Resulting in Potential Incorrect Interface W/Reactor Pressure Vessel Instrument Piping.Authorization for Corrective Changes to Panels Issued | Reactor Vessel Water Level |
ML20028C248 | 30 December 1982 | First Interim Deficiency Rept Re Insufficient Length of Starting Air Valve Assembly Capscrews.Initially Reported on 821201.Transamerica Delaval,Inc Changed Designed Length of Capscrew.Next Rept by 830415.Also Reportable Per Part 21 | |
ML20028D661 | 11 January 1983 | Interim Potential Const Deficiency Rept Re Emergency Diesel Generator O Rings.Initially Reported on 821213.Colt Industries Reported Potential Problem If Cooling Sys Contaminated W/Diesel Fuel.Also Reportable Per Part 21 | |
ML20028E148 | 14 January 1983 | Part 21 Rept Re Possible Adverse Effects of Cross Flow on Control Rod Assemblies for Facilities.Concern Not Substantial Safety Hazard.Design Change Will Be Implemented | |
ML20028E319 | 10 January 1983 | Interim Deficiency Rept 82-09 Re Mechanical Snubber Bracket Interference.Initially Reported on 821203.Design Drawings & Vendor Production Info Under Review to Identify Suspect Snubber Assemblies.Next Rept Expected by 830215 | |
ML20028E651 | 21 January 1983 | Final Deficiency Repts 82-10 & 11 Re Rigid Strut Pins Mfg by Elcen.Initially Reported on 821223.Test Results Indicate No Load Capacity Data Values Violated.If Such Pins Were Used,Design Margins Not Exceeded | |
ML20028E764 | 21 January 1983 | Interim Deficiency Rept 83-01 Re Westinghouse Emd Gate Valve Position Indication.Initially Reported on 821223.Gate Valve Applications in Cold & Hot Leg Safety Injection Lines May Require Mod.Investigation Continuing.Next Rept by 830531 | |
ML20028F495 | 18 January 1983 | Interim Deficiency Rept Re Grout Intrusion Into Drywell Airgap.Initially Reported on 820920.Grout Will Be Removed by 830225 | |
ML20038B510 | 25 November 1981 | Interim Deficiency Rept Re Effect of Recent Seismic Reanalysis Data on Seismic Qualification of Certain Equipment.Bechtel,Eds Nuclear & Util Conducting Addl Tests to Be Completed by 820615 | |
ML20039C079 | 15 December 1981 | Interim Deficiency Rept Re Swing Check Valves in HPCI & Reactor Core Isolation Cooling Turbine Exhaust Lines, Initially Reported 811117.Manufacturer to Supply Hardware for Field Mod of Unit 1 Valves & to Modify Unit 2 Valves | Anchor Darling |
ML20039G090 | 29 December 1981 | Final Significant Deficiency Rept 42 Re Nonconforming Concrete Anchor Bolt Installations,Initially Reported 810519.Criteria to Establish Min Ctr to Ctr Spacing Between Expansion Anchors Will Be Implemented by 811231 | |
ML20039G245 | 29 December 1981 | Final Significant Deficiency Rept 38 Re Defects in Limitorque Valve Motor Operators,Initially Reported 810501. All safety-related Operators Will Be Inspected & Existing Splices Will Be Replaced | |
ML20040B491 | 20 January 1982 | Final Deficiency Rept Re HVAC Fabrication & Installation. Nonconforming Conditions Will Be Corrected by 830901 | |
ML20040C582 | 18 January 1982 | Fourth Interim Deficiency Rept on Deficiency 14 & Final Rept on Deficiency 21 Re Completion of as-built Drawings, Initially Reported 810122.Unit-unique as-built Drawing Program Being Investigated.Addl Rept by 820331 | |
ML20040C593 | 20 January 1982 | Suppl to Final Significant Deficiency Rept 35 Re HVAC Fabrication & Installation Deficiencies.Nonconforming Conditions Will Not Be Corrected Until 830901 Due to Schedule Slippage | |
ML20040C708 | 18 January 1982 | First Interim Deficiency Rept Re Possible Out of Phase Transfer of Emergency Bus for Stride Design,Initially Reported 811218.GE Studying Design Change to Resolve Problem.Next Rept Will Be Submitted by 830301 | |
ML20040E532 | 27 January 1982 | Third Interim Deficiency Rept Re Reactor Core Isolation Cooling Steam Line Break,Initially Reported 810630.Util Still Investigating GE Proposed Solution to Add 1-inch Bypass to Limit Downstream Flow in Event of Rupture | |
ML20040E643 | 26 January 1982 | Fifth Interim Deficiency Rept Re Alleged Atlas Machine & Iron Works Falsification of QA Documentation Packages for Nine Drywell Framed Embedments,Initially Reported on 810528. Welding Tests Will Be Verified.Next Rept Due by 820618 | |
ML20040F740 | 1 February 1982 | Part 21 Rept Re Strainer Basket in Diesel Generator Lube Oil Strainer Mfg by Zurn Industries.Mesh Liner Tears Loose at Basket Top & Disintegrates.Baskets to Be Replaced in All Facilities W/New Qualified Design in 6 Months | |
ML20041A424 | 10 February 1982 | Deficiency Rept Re Failure of Transamerica Delaval to Promptly Correct Deficiencies,Initially Reported 820114. Deficiency Sheet Discussed W/Delaval Mgt.Next Rept by 820320.Also Reported Per Part 21 | |
ML20041B129 | 12 February 1982 | Part 21 Rept Re Misinterpretation of American Welding Soc Welding Symbol.Problem Exists at Braidwood But Not at Vogtle or St Lucie | |
ML20041D441 | 25 February 1982 | Significant Deficiency Rept 10 Re HVAC Damper Deficiency. Requests Addl Time for Completion Due to Rework at Vendors Facility & Plant.Completion Expected by 820430 | |
ML20041F756 | 5 March 1982 | Fourth Interim Deficiency Rept Re GE Support of 10CFR50.55(e),initially Reported 810810.Util Awaiting Addl Clarification from Nrc.Next Rept Expected by 820930 | |
ML20043A609 | 27 April 1990 | Part 21 Rept Re Defective Axial Cracks in Pump Shaft in Region Immediately Above Impeller & in Reactor Recirculation Pumps.Probably Caused by Crack Growth as Thermal Fatigue. Technical Advisory Bulletin Will Be Sent to Each Util | |
ML20046C659 | 5 August 1993 | Part 21 Rept:On 930429,deficiency Identified Re Heat Damage to Comsip Series PTW-5300 Dc Powered Microswitches.Initially Reported on 930709.Safety-related Dc Microswitches Will Be Replaced Prior to 931230 | |
ML20049A407 | 16 January 1981 | Interim Deficiency Rept Re Deficiency 27,improper Welding of Reactor Pressure Vessel Safe Ends,Initially Reported 801218. GE Evaluating Weld Acceptability.Final Rept Will Be Submitted by 810415 | |
ML20049A586 | 28 May 1981 | Interim Significant Deficiency Rept 38 Re Limitorque Valve Motor Operators.Bechtel Inspecting 50 Motor Operators.Insp Has Revealed Light Switch Rotors W/Cracks or Misdrilled Pin Holes.Next Rept Expected by 810731 | |
ML20049H696 | 22 February 1982 | Part 21 Rept Re HVAC Stiffener Welding of Ductwork Supplied to Facilities.Problem Exists at Marble Hill,But Does Not Exist at St Lucie or Vogtle | |
ML20049J439 | 3 March 1982 | First Interim Deficiency Rept Re Check Valve Leak in Air Start Sys of Standing Diesel Generators,Initially Reported on 820209.Problem Under Investigation by Vendor.Next Rept Expected by 820528.Also Reported Per Part 21 | |
ML20049J458 | 25 February 1982 | Suppl Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Util Unable to Complete Corrective Actions by 820205 as Committed in 811116 Ltr.Drawings Require Vendor Revisions.Drawings Expected by 820805 | |
ML20049J487 | 25 February 1982 | Final Deficiency Rept Re Failure to Hydrotest Mechanical Penetration Assemblies,Originally Reported on 810814.STRIDE Spec 400-09 Revised.Also Reported Per Part 21 | Hydrostatic |
ML20050B022 | 19 March 1982 | Final Deficiency Rept 2 Re Failure of Transamerica Delaval to Correct Violations Identified During Audits 79V-38 & 80V-39 Promptly,Due to Improper QA Program Implementation, Initially Reported on 820114.Also Reported Per Part 21 | |
ML20050B599 | 1 April 1982 | Fifth Interim Rept Re Pressure Drop in Essential Svc Water Piping,Originally Reported 801210.Util Still Evaluating Deficiency.Next Rept by 820715 | |
ML20052A332 | 20 April 1982 | Part 21 Rept Re Apparent Lack of Control Over Issuance of Class II Piping,Fittings & Pressure Switches in Class I Applications,Initially Reported 820416.Task Force Organized to Classify Suspect Components.No Related Failures to Date | |
ML20052A607 | 19 April 1982 | Suppl to Final Deficiency Rept Re Standby Gas Treatment Sys Charcoal Absorber,Initially Reported 800508.Util Unable to Meet Corrective Action Completion Date in 811209 Final Rept Due to Deferral of Const.Also Reported Per Part 21 | |
ML20052G360 | 30 April 1982 | Part 21 Rept Re Leak or Break Outside Pipe Tunnel on Connections to Main Feedwater Lines Not Detected &/Or Terminated by Existing Sys.Supplemental Response Will Be Issued by 820831 | |
ML20052H908 | 11 May 1982 | Final Deficiency Rept Re Diesel Generator Strainer Basket Defect,Initially Reported on 820423.New Basket Designed & Tested & Will Be Installed Prior to Fuel Load | |
ML20053E120 | 28 May 1982 | Second Interim Deficiency Rept Re Check Valve Leak in Air Start Sys of Standby Diesel Generators,Initially Reported 820209.Evaluation by Vendor Underway.Also Reported Per Part 21 | |
ML20054A997 | 2 April 1982 | Part 21 Rept Re Potential Deficiency in Pressurized Subcritical Experiment Exams of Pressure Vessel Inlet Nozzle to Pipe Welds from Inner Diameter Surface.Inspectors Advised of Potential Generic Implications on 820402 |