ML20040B491
| ML20040B491 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/20/1982 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8201260110 | |
| Download: ML20040B491 (1) | |
Text
3 l
I agcaVCD PHILADELPHIA ELECTRIC COMPANY-t JAN 2 51992* i?
2301 MARKET STREET u rm 7tum *m
/hr P.O. BOX 8699 7),1 1
r pA
\\
PHILADELPHI A. PA.19101 (215)0414000 JAN 2 01982 Mr. Ronald C. Haynes, Director United States Nuclear Regulatory Cornission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406
Subject:
Significant Deficiency Report No. 35 Final Report for HVAC Fabrication and Installation Deficiencies Limerick Generating Station, Units 1 and 2 NRC Construction Pemit Nos. CPPR-106. -107
Reference:
a) Interim Report of March 23, 1981 b) Final Report of September 29, 1981 File: QUAL 2-10-2 (SDR #35)
Dear Mr. Haynes:
In our final report on the above subject deficiency it was stated that we anticipated correcting all the nonconforming conditions as the HVAC ductwork was being completed, which was scheduled for June 1,1982. However, due to the slippage in the schedule for completion of the Unit I and Connon HVAC into 1983, it is now expected that all the nonctnfoming conditions will be corrected by September 1,1983.
If there are any questions on this matter, we would be pleased to discuss them wii.h you.
Sincerely,
+hfQ
/
MJM/mk Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Comission Washington, D. C.
20555 J. P. Durr, Resident NRC Inspector bcc:
W. C. McDaniel, Bechtel J. S. Kemper i
E. R. Klossin, Bechtel J. H. Long hI l H. R. Walters, c/o Bechtel D. Marano
{
E. J. Bradley R. A. Mulford J. J. Clarey P. K. Pavlides/ Local File J. M. Corcoran Project File R. L. Harper 8201260110 820120 V. S. Boyer PDR ADOCK 05000352 S