Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-85-590, Forwards Proposed Info Notice Re Various Discrepancies Between as-built Const Drawings & as-built Installations in Electrical & Instrumentation & Control Areas.Info Re Rancho Seco 850623 RCS High Point Vent Leak Encl | 3 April 1985 | Forwards Proposed Info Notice Re Various Discrepancies Between as-built Const Drawings & as-built Installations in Electrical & Instrumentation & Control Areas.Info Re Rancho Seco 850623 RCS High Point Vent Leak Encl | |
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | 22 August 1985 | Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | |
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | 14 July 1983 | Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | Internal Flooding Backfit |
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | 15 February 1984 | Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | |
ML082890913 | 18 March 1985 | Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 | |
ML20054F550 | 14 June 1982 | Forwards Util to Div of Licensing Indicating Util Will Provide Addl Info Requested in NRC Re Repair of High Pressure Injection Nozzles & Safe Ends by 820701 | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A271 | 9 July 1982 | Board Notification 82-65:forwarding Draft Lasl Rept, Small-Break LOCA in B&W Plants. Comments on Draft Rept Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055C205 | 12 February 1988 | Forwards Safety Evaluation Supporting Util 871223 & 880211 Submittals Re Proposed Amends to Tech Specs (PA 155,Rev 2) for Plant.Salp Input Also Encl | |
ML20055D683 | 29 December 1986 | Advises That Inquiry Upgraded to Investigation 5-86-010, Following Review of Response to 860718 Request for Info on Plant Liquid Effluents Program | |
ML20055D814 | 16 October 1987 | Forwards Rept of Investigation Re Matl False Statement, Conspiracy to Conceal Presence of Radioactive Nuclides in Liquid Effluents Released to Environ & Violations of 10CFR50 Requirements to Limit Exposure to Alara.W/O Encl | |
ML20055D817 | 28 September 1988 | Summarizes Significant Issues Re Investigation of Matls False Statement Made by Util | |
ML20055D822 | 13 January 1989 | Advises That Commission Has Not Objected to Intention to Issue Notice of Violation & Proposed Imposition of Civil Penalty for Violation of Requirements of Plant Radioactive Liquid Effluent Programs | |
ML20055E282 | 28 June 1990 | Forwards Documents in Response to Subpoena Re M Akins,Et Al | |
ML20055E298 | 13 April 1990 | Responds to Civil Subpoena Re M Akings Et Al.Chronological Sort of Dbase File Created to Account for Documents Released Encl | |
ML20055E301 | 3 February 1988 | Forwards Latest Critical Items Rept for 880112-29.Outline of Power Ascension Insp Program Will Be Sent Under Separate Cover | |
ML20055E305 | 20 April 1988 | Forwards Amend 98 to License DPR-50 & Ser,Revising Tech Specs to Resolve Problems Identified in Insp Rept 50-312/86-15.Recommends That DOJ Be Provided Copy of Amend & SER | |
ML20055E315 | 11 October 1988 | Requests Review of Encl Draft Enforcement Action Now That DOJ Has Declined Prosecution on Matter.Draft Commission Paper Also Encl | |
ML20055E334 | 15 March 1989 | Notifies of Meeting on 890317 W/Util to Discuss Results of Licensee Investigation Re Incident Involving Resins in Liquid Effluent Waste Stream During 890115-19 | |
ML20055E367 | 29 October 1987 | Informs That Findings in Ofc of Investigation Rept 5-86-010 Indicate That Enforcement Action for Violations May Be Appropriate.Ofc of General Counsel Analysis of Rept Requested to Determine Enforcement Action Appropriate | |
ML20055E380 | 14 December 1987 | Informs That Atty Handling Case Has Requested That NRC Refrain from Proposing Civil Penalty Pending Decision on Prosecution.Encl Request for Info Should Be Made | |
ML20055E399 | 28 May 1987 | Informs That Region V Continuing to Inspect Util Activities Re Preparation for Restart of Facility Following 851226 Transient.Util Has Partially Performed,Developed & Implemented Necessary Corrective Action Programs | |
ML20055E401 | 23 January 1987 | Forwards Final SALP Package for June 1985 - June 1986 | |
ML20055E491 | 1 May 1989 | Forwards Draft Documents & Supporting Info Proposed for Plant Notice of Violation & Proposed Imposition of Civil Penalties Re Release of Radioactive Liquid Effluents & Emergency Preparedness | |
ML20056C842 | 13 July 1993 | Notification of Significant Licensee Meeting W/Util on 930727 to Discuss Decommissioning & General Status | |
ML20056E457 | 5 August 1993 | Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20058D123 | 25 October 1990 | Notification of Significant Meeting on 901030 W/Util in Herald,Ca to Discuss Licensee Organization,Staffing,Plant Status & Status of Licensee Programs | |
ML20058K592 | 12 January 1986 | Notifies of Opening of Investigation 5-86-010 | |
ML20058K604 | 3 July 1986 | Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection | |
ML20058K614 | 16 December 1986 | Advises That Pending Investigations Associated W/Facility Viewed to Be of Highest Priority | |
ML20058K624 | 14 August 1987 | Requests Priority Be Given to Completion of Investigation 5-86-011 Re Falsification of Cable Pull Cards | |
ML20058K632 | 3 September 1987 | Repts Status of Pending Investigations 5-86-010 Re Violation of Util Managers in Control of Radioactive Effluents & 5-86-011 Re Falsification of Cable Pull Cards | |
ML20058K635 | 22 October 1987 | Forwards Ofc of Investigation Rept 5-86-010 Re Matl False Statement,Conspiracy to Conceal Presence of Radioactive Nuclides in Liquid Effluents Released to Environ & Violation of 10CFR50 Requirements to Limit Radioactive Exposure ALARA | |
ML20058K641 | 28 April 1988 | Forwards Amend 98 to License DPR-54 & SER Revising Tech Specs to Resolve Problems Identified in Insp Rept 50-312/86-15.W/o Stated Encls | |
ML20059P083 | 12 October 1990 | Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities | |
ML20062A838 | 12 October 1990 | Notification of 901017 Meeting W/Util in Rockville,Md,To Discuss Plant Decommissioning Funding | |
ML20062E356 | 21 July 1982 | Board Notification 82-75:presents Initial Results of Precursor Program,Which Uses LERs to Evaluate Potential Nuclear Plant Accident Precursors Occurring at Operating Reactors.Info Relates to Accident Probability | |
ML20125A914 | 5 June 1985 | Requests That Licensee Provide Addl Info Re 850318 Application to Amend License DPR-54 Concerning Boron Concentration During Periods of Refueling.Draft Transmittal Ltr to Licensee & Request Encl | |
ML20125C064 | 7 December 1979 | Forwards Util 790919 & 1024 Replies to IE Bulletin 79-05C, Nuclear Incident at TMI - Suppl | |
ML20126K252 | 1 April 1985 | Forwards 850327 Fr Notice Re Applications & Amends to OLs Involving NSHC Considerations.W/O Encl.Related Correspondence | |
ML20126L227 | 1 May 1981 | Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels | |
ML20127F306 | 18 June 1985 | Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed | High Radiation Area |
ML20127K043 | 20 June 1985 | Forwards,For Consideration,Draft IE Info Notice Re 850605 Failure of Reactor Trip Breaker at Facility.Safety Significance of Event Warrants Issuance of Notice.Failure Due to Excessive Clearance Between Roller Rivet & Armature | |
ML20133A821 | 19 July 1985 | Informs That Regional SALP Review Board Meeting Scheduled to Convene at Region V Ofc on 850807.Assessment Will Cover Dec 1983 - May 1985.Listed Individuals Will Prepare Performance Analysis.Review Guidance Package Encl | Safe Shutdown Stroke time Missed surveillance Systematic Assessment of Licensee Performance |
ML20133B916 | 30 September 1985 | Forwards SER Addressing Licensing Action Re Low Temp Overpressure Protection Sys.Salp Input,Draft Ltr to Licensee,License Amend & Revised Tech Specs Also Encl.Tac 59325 Closed | Boric Acid Hydrostatic |
ML20133H848 | 5 August 1985 | Identifies Facilities Having safety-related Issues of Concern to Nrc.Notes Two Generic Issues,Containment Purge & Vent & Fire Protection,W/Extended Resolution Times |