|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207G5371999-06-0808 June 1999 Notification of 990624 Meeting with Util in Rockville,Md to Discuss Hatch License Renewal Program.Meeting Agenda Encl ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20207J7561999-02-19019 February 1999 Forwards Proposed Transmittal Ltr & Comments on Physical Protection Plan in Response to Verbal Request from Rancho Seco to Provide Addl Comments on ISFSI Physical Protection Installation ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20206S6661998-10-26026 October 1998 Informs That During 980902-04 ACRS 455th Meeting,Several Matters Discussed,Listed Rept & Ltrs Completed & Authorized Executive Director to Transmit Noted Memorandum ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207G5371999-06-0808 June 1999 Notification of 990624 Meeting with Util in Rockville,Md to Discuss Hatch License Renewal Program.Meeting Agenda Encl ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20207J7561999-02-19019 February 1999 Forwards Proposed Transmittal Ltr & Comments on Physical Protection Plan in Response to Verbal Request from Rancho Seco to Provide Addl Comments on ISFSI Physical Protection Installation ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20206S6661998-10-26026 October 1998 Informs That During 980902-04 ACRS 455th Meeting,Several Matters Discussed,Listed Rept & Ltrs Completed & Authorized Executive Director to Transmit Noted Memorandum ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 1999-09-29
[Table view] |
Text
9 pm RQ 8 7, UNITED STATES -
{
O
,E NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20565
.....* April 1, 1985 -
DOCKET NOIS). 50-313, 50-321, 50-366, 50-345, 50-277, 50-278, 50-312 and 50-289 55
' ' '2 G :55 y .
SUBJECT:
ANO-1; Hatch 1 and 2; DB-1; PB-2 and 3; RS; TMI-l The following documents concerning our review of the subject facility are transmitted for your information.
O Notice of Receipt of Application, dated O Draft / Final Environmental Statment, dated .
O Notice of Availability of Draft / Final Environmental Statement, dated .
O Safety Evaluation Report, or Supplement No. , dated .
O Notice of Hearing on Application for Construction Permit, dated .
O Notice of Consideration of issuance of Facility Operating License, dated O Monthly Notice; Applications and Amendments to Operating Licenses involving no Significant Hazards Considerations, dated .
O Application and Safety Analysis Report, Volume .
O Amendment No. to Application /SAR dated .
O Construction Permit No. CPPR- , Amendment No. dated .
O Facility Operating License No. , Amendment No. , dated O Order Extending Construction Completion Date, dated -
1 O Other(Specify) March 27, 1985 FEDERAL REGISTER, NRC, " Applications and Amendments
- to Operating Licenses Involving No Significant Hazards Considerations; Monthly Notice."
Office of Nuclear Reactor Regulation
Enclosures:
Operating Reactors Branch #4 As stated Division of Licensing cc: w/ enclosures:
See next page 8506100834 850401 PDR ADOCK 05000277 4I)
P PDR
~
(
GPU Nuclear Corporation 50-289, TMI-1 Mr. R. J. Toole 0&M Director, TMI-1 Jordan D. Cunningham, Esq.
GPU Nuclear Corporation Fox, Farr and Cunningham Middletown, Pennsylvania 17057 2320 North 2nd Street Harrisburg, Pennsylvania 17110 Board of Directors P.A.N.E. Ms. Louise Bradford TMIA P. O. Box 268 Middletown, Pennsylvania 17057 1011 Green Street Harrisburg, Pennsylvania 17102 Docketing and Service Section U. S. Nuclear Regulatory Comission Mrs. Marjorie M. Aamodt Washington, D. C. 20555 Mr. Norman Aamodt 200 North Church Street Parkesburg, Pennsylvania 19365 Chauncey Kepford Judith H. Johnsrud Earl B. Hoffman Dauphin County Comissioner Environmental Coalition on Nuclear Power Dauphin County Courthouse 433 Orlando Avenue State College, Pennsylvania 16801 Front and Market Streets Harrisburg, Pennsylvania 17101 Judge Reginald L. Gotchy Ellyn R. Weiss Atomic Safety & Licensing Appeal Board Harmon, Weiss & Jordan U. S. Nuclear Regulatory Comission 2001 S. Street Washington, DC 20555 Suite 430 Washington, DC 20009 Mr.S.
U. Thomas E. Murley, Regional Administrator Ivan W. Smith, Esq., Chairman N. F., C., Region 1 631 Park Avenue Atomic Safety and Licensing Board King of Prussia, Pennsylvania 19406 U.S. Nuclear Regulatory Comission Washington, DC 20555 ANGRY /TMI PIRC 1037 Maclay Street Gary J. Edles, Chairman Harrisburg, Pennsylvania 17103 Atomic Safety & Licensing Appeal Board U.S. Nuclear. Regulatory Comission John Levin, Esq.
Pennsylvania Public Utilities General Counsel Comission Federal Emergency Management Agency Box 3265 ATTN: Docket Clerk 1725 I Street, NW Harrisburg, Pennsylvania 17120 Washington, DC 20472 Marvin I. Lewis 6504 Bradford Terrace Karin W. Carter, Esq.
Philadelphia, Pennsylvania 19149 505 Executive House P. O. Box 2357 Harrisburg, Pennsylvania 17120
t GPU Nuclear Corporation Pr. Thomas M. Gerusky, Director Dr. James Lamb Bureau of Radiation Protection 313 Woodhaven Road Pennsylvania Department of Chapel Hill, North Carolina 27514 G. F. Trowbridge, Esc. Dauphin County Office Emergency Shaw, Pittman, Potts A Trowbridge Preparedness 1800 M Street, N.W. Court House, Room 7 Washington, DC 70036 Front A Market Streets Harrisburg, Pennsylvania 17101 Richard .1. McGoey Christine N. Kohl, Esq.
Manaaer, PWR Licensing Atomic Safety A Licensing Appeal GPU Nuclear Corporation Board 100 Interpace Parkway U.S. Nuclear Reoulatory Commission Parsippany, New Jersey 07054 Washington, DC P0555 Ad Crable Mr. Robert B. Borsum Lancaster New Era Babcock & Wilcox 8 West King Street Nuclear Power Generation Division Lancaster, Pennsylvania 17602 Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Dr. David Hetrick Mr. Gustave A. Linenberger, ilr.
Professor of Nuclear Energy Atomic Safety and Licensing Board University of Arizona U.S. Nuclear Regulatory Commission Tucson, Arizona 85721 Washington, DC 20555 Mr. David D. Maxwell, Chairman Mr. C. W. Smyth Board of Supervisors TMI-1 Licensing Manager Londonderry Township GPU Nuclear Corporation RFD#1 - Geyers Church Road P. O. Box 480 Middletown, Pennsylvania 17057 Middletown, Pennsylvania 17057 Regional Radiation Representathe Governor's Office of State Planning EPA Region III and Development Curtis Building (Sixth Floor) ATTN: Coordinator, Pennsylvania
.6th and Walnut Streets State Clearinghouse Philadelphia, Pennsylvania 19106 P. O. Box 1323 -
Harrisburg, Pennsylvania 17120 Mr. Richard Conte Sheldon J. Wolfe, Esq. , Chaiman Senior Resident Inspector (TMI-11 Atomic Safety A Licensing Board U.S.N.R.C. Washington, DC 20555 P. O. Box 311 Middletown, Pennsylvania 17057 Jane Lee 183 Valley Road Ms. Jane Perkins Etters, Pennsylvania 17319 City Government Center 10 North Market Square Bruce Molholt Parrisburo, Pennsylvania 17101 Haverford College Haverford, Pennsylvania 19041
e =
GPU Nuclear Corporation Michael McBride, Esq.
LeBoeuf, Lamb, Leiby & McRae Suite 1100 1333 New Hampshire Avenue, N.W.
Washington, DC 20036 Beverley Davis 200 Gettysburg Pike Mechanicsburg, Pennsylvania 17055 James B. Hurst 617 Briarcliff Road Middletown, Pennsylvania 17057 Donald E. Hossier 501 Vine Street Middletown, Pennsylvania 17057 l
h k
s I
f