Issue date | Title | Topic | |
---|---|---|---|
05000280/LER-2016-001 | 11 July 2016 | 1 OF 4 LER 16-001-00 for Surry Power Station, Unit 1 and 2, Regarding Emergency Service Water Pump Inoperable Due to Corrosion of Valve Support | |
05000280/LER-2017-001 | 6 October 2017 | 1 OF 3 LER 17-001-00 for Surry, Unit 1, Regarding Shutdown due to an Unisolable Leak in Reactor Coolant Pressure Boundary | High Radiation Area Pressure Boundary Leakage Pressure boundary leak |
05000280/LER-2019-002 | 4 February 2020 | LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile Protection | Safe Shutdown Unanalyzed Condition Tornado Missile Enforcement Discretion Tornado Generated Missile Tornado Missile Protection |
05000281/LER-2016-001 | 2 December 2016 | Unit 2 Reactor Trip due to Generator Differential Lockout LER 16-001-00 for Surry Power Station, Unit 2, Regarding Reactor Trip Due to Generator Differential Lockout | Reserve Station Service Transformer |
05000281/LER-2020-001, Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication | 6 November 2020 | Cancellation of LER 2020-001-00 for Surry Power Station Unit 2 Re Loss of Containment Cooling Affecting Containment Partial Pressure Indication | |
CY-04-011, Withdrawal as Pilot Plant for Implementation of 10 CFR 50.69 | 12 June 2006 | Withdrawal as Pilot Plant for Implementation of 10 CFR 50.69 | Probabilistic Risk Assessment |
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | 14 July 2011 | G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | Fukushima Dai-Ichi Significance Determination Process Earthquake Backfit |
IR 05000028/2019413 | 31 October 2019 | Security Insp Report 5000280/ 2019413 and 500028/2019413 | |
IR 05000280/2001008 | 27 March 2002 | Reply to Denial of Non-Cited Violation - NRC Inspection Report 50-280/01-08, 50-281/01-08 & Reply to Claim of Backfit | Backfit |
IR 05000280/2002002 | 25 July 2002 | IR 05000280-02-002 & IR 05000281-02-002, on 03/31 - 06/29/02; Surry Power Station, Units 1 & 2, Equipment Alignment, Integrated Resident Inspector Report | Non-Destructive Examination Stroke time Nondestructive Examination Temporary Modification Condition Adverse to Quality Significance Determination Process Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000280/2002003 | 28 October 2002 | IR 05000280-02-003, and IR 05000281-02-003 on 06/30/02 - 09/28/02; Virginia Electric and Power Co.; Surry Power Station, Units 1 & 2. Event Followup | High winds Offsite Dose Calculation Manual Met Tower Reserve Station Service Transformer Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Maintenance Rule Program Fire Protection Program Power change Siren |
IR 05000280/2002004 | 3 February 2003 | IR 05000280-02-004 & IR 05000281-02-004, on 09/29/02 - 01/04/03, Virginia Electric and Power Co.; Surry Power Station Units 1 & 2; Nonroutine Plant Evolutions | Boric Acid High Radiation Area Reserve Station Service Transformer Locked High Radiation Area Significance Determination Process Process Control Program Fire Protection Program |
IR 05000280/2002006 | 25 March 2002 | IR 05000338/2002-006, IR 05000339/2002-006, 05000280/2002-006 & 05000281/2002-006, Virginia Electric & Power Co., Glen Allen, Va. Inspection on 02/08/2002 Related to Application for Renewal. No Violations Noted | Safe Shutdown Boric Acid Ultimate heat sink Coatings Reserve Station Service Transformer Aging Management License Renewal Fire Protection Program |
IR 05000280/2002007 | 23 July 2002 | IR 05000280-02-007, IR 05000281-02-007, on 06/10/-27/2002, Virginia Electric and Power Co; Surry Nuclear Power Station, Units 1 & 2; Safety System Design and Performanced Capability Biennial Baseline Inspection, Steam Generator Tube Rupture | Packing leak Through-Wall Leakage |
IR 05000280/2002008 | 8 May 2002 | IR 05000280/2002-008 and IR 05000281/2002-008 for Surry Nuclear Power Station Conducted on 04/12/2002 | Probabilistic Risk Assessment Condition Adverse to Quality |
IR 05000280/2002010 | 6 November 2002 | Stations - Addendum to NRC IR 05000338-02-010, 05000339-02-010, 05000280-02-010 and 05000281-02-010 | |
IR 05000280/2002301 | 19 April 2002 | NRC Examination Report 50-280/02-301 and 50-281/02-301 | |
IR 05000280/2003001 | 4 March 2003 | Annual Assessment Letter - Surry Power Station (Reports 50-280/03-01 & 50-281/03-01) | Significance Determination Process |
IR 05000280/2003002 | 25 April 2003 | IR 05000280-03-002 & IR 05000281-03-002, on 01/05 - 04/05/2003, Virginia Electric Power Co., Surry Units 1 & 2. Fire Protection & Resolution of Problems | Significance Determination Process Job Performance Measure Maintenance Rule Program Through-Wall Leakage Fire Protection Program |
IR 05000280/2003003 | 28 July 2003 | IR 05000280-03-003, IR 05000281-03-003, on 04/06 - 06/28/2003, Surry Power Station Units 1 & 2, Routine Integrated Report | Boric Acid Non-Destructive Examination Nondestructive Examination Earthquake Liquid penetrant Through-Wall Leak Fire Protection Program |
IR 05000280/2003004 | 27 October 2003 | IR 05000280-03-004, IR 05000281-03-004, IR 07200002-03-001, on 06/29/2003 - 09/27/2003, Surry Power Station, Units 1 & 2 and Independent Spent Fuel Storage Installation; Other Activities | Boric Acid High winds Internal Flooding Nondestructive Examination Significance Determination Process Maintenance Rule Program Liquid penetrant Through-Wall Leak Fire Protection Program Power change |
IR 05000280/2003005 | 26 January 2004 | IR 05000280-03-005 & 05000281-03-005 on 9/28/2003 - 12/27/2003 for Surry, Units 1 & 2; Inservice Inspection Activities, Integrated Resident Inspector Report | Boric Acid High winds High Radiation Area Ultimate heat sink Non-Destructive Examination Coatings Nondestructive Examination Temporary Modification VT-2 Condition Adverse to Quality Significance Determination Process Process Control Program Moisture barrier Maintenance Rule Program Liquid penetrant Pressure Boundary Leakage Fire Protection Program |
IR 05000280/2003006 | 21 February 2003 | IR 05000280-03-006 and IR 05000281-03-006 on 01/06 - 09/03 for Virginia Electric and Power Company | B.5.b |
IR 05000280/2003008 | 2 February 2004 | IR 05000280-03-008 & 05000281-03-008, on 04/21/03 Through 01/07/04, for Virginia Electric & Power Company, Surry, VA; Significance Determination of Unresolved Items from Triennial Fire Protection Inspection | Safe Shutdown Significance Determination Process Preliminary White Finding Fire Protection Program |
IR 05000280/2003009 | 2 January 2004 | IR 05000280-03-009, IR 05000281-03-009 on 11/17/2003 - 12/5/2003; Surry, Units 1 & 2, Biennial Baseline Inspection of the Identification and Resolution of Problems. a Violation Was Identified in the Area of Prioritization and Evaluation of | Boric Acid Probabilistic Risk Assessment Coatings Significance Determination Process Maintenance Rule Program Fire Protection Program |
IR 05000280/2004002 | 19 April 2004 | IR 05000280-04-002, IR 05000281-04-002, on 12/28/2003 - 03/27/2004, Surry Power Station Units 1 & 2, Surry, VA; Routine Integrated Report | Significance Determination Process Maintenance Rule Program Through-Wall Leak Fire Protection Program |
IR 05000280/2004003 | 20 July 2004 | IR 05000280-04-003, 05000281-04-003 & 07200002-04-001, on 03/28/2004 - 06/26/2004, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Routine Integrated Report | Significance Determination Process Maintenance Rule Program Fire Protection Program |
IR 05000280/2004005 | 27 January 2005 | IR 05000280-04-005, 05000281-04-005, on 09/26/2004 - 12/31/2004; Surry Power Station Units 1 & 2, Routine Integrated Report | Boric Acid Packing leak Non-Destructive Examination Mission time Temporary Modification VT-2 Significance Determination Process Maintenance Rule Program Pressure Boundary Leakage Fire Protection Program Siren |
IR 05000280/2004006 | 21 May 2004 | IR 05000280-04-006 & IR 05000281-04-006, on 03/22/04 Through 03/26/04 & 04/05/04 Through 04/08/04, for Surry Power Station Units 1 & 2; Safety System Design & Performance Capability Inspection | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Coatings Significance Determination Process Job Performance Measure Earthquake |
IR 05000280/2004009 | 28 April 2004 | IR 05000280-04-009 on 02/16/2004 - 03/27/2004 for Surry Power Station, Unit 1; Supplemental Inspection IP 95001 for a White Performance Indicator in the Initiating Events Cornerstone | Significance Determination Process |
IR 05000280/2004011 | 21 January 2005 | IR 05000280-04-011, 05000281-04-011, on 11/15-19-2004 & 12/06-10/2004, Surry Power Station, Units 1 & 2; Supplemental Inspection for Degraded Mitigating Systems Cornerstone | Safe Shutdown Unanalyzed Condition Probabilistic Risk Assessment Temporary Modification Significance Determination Process Preliminary White Finding |
IR 05000280/2005002 | 19 April 2005 | IR 05000280-05-002, 05000281-05-002, and 07200002-05-001, on 01/01/2005 - 03/31/2005, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Event Followup, Routine Integrated Report, and Annual Assessment Meeting | High winds Temporary Modification Significance Determination Process Job Performance Measure Earthquake Maintenance Rule Program Fire Protection Program Power change |
IR 05000280/2005003 | 25 July 2005 | IR 05000280-05-003, IR 05000281-05-003; 04/01/2005-06/30/2005; Surry Power Station Units 1 & 2. Identification and Resolution of Problems | Unanalyzed Condition Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000280/2005004 | 21 October 2005 | IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance Effectiveness | Boric Acid Time of Discovery High winds Stroke time Past operability Temporary Modification Significance Determination Process Maintenance Rule Program Liquid penetrant Through Wall Leak Fire Protection Program Downpower |
IR 05000280/2005005 | 30 January 2006 | IR 05000280-05-005, IR 05000281-05-005, on 10/01-12/31/2005, Virginia Electric and Power Company | Internal Flooding Temporary Modification Significance Determination Process Maintenance Rule Program Through Wall Leak Fire Protection Program Downpower |
IR 05000280/2005006 | 20 September 2005 | IR 05000280-05-006 and IR 05000281-05-006 on 08/08/05 - 08/26/05, Surry Power, Units 1 and 2, Biennial Baseline Inspection of the Identification a Resolution of Problems. Three Violations Were Identified in the Area of Corrective Actions | Boric Acid Packing leak Mission time Temporary Modification Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Through Wall Leak Operability Assessment |
IR 05000280/2006002 | 24 April 2006 | IR 05000280-06-002, 05000281-06-002, on 01/01/2006 - 03/31/2006, Surry, Units 1 & 2 | Boric Acid Internal Flooding Condition Adverse to Quality Significance Determination Process Maintenance Rule Program Through Wall Leak Fire Protection Program Downpower |
IR 05000280/2006003 | 21 July 2006 | IR 05000280-06-003, IR 05000281-06-003; 04/01/2006 - 06/30/2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated Report | Boric Acid High winds Nondestructive Examination Temporary Modification Condition Adverse to Quality Significance Determination Process Maintenance Rule Program Liquid penetrant Fire Protection Program Power change Downpower |
IR 05000280/2006004 | 26 October 2006 | IR 05000280-06-004, IR 05000281-06-004, and IR 07200055-06-001, Virginia Electric and Power Company | Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Temporary Modification Maintenance Rule Program Liquid penetrant Through Wall Leak Fire Protection Program |
IR 05000280/2006005 | 31 January 2007 | IR 05000280-06-05, IR 05000281-06-05, IR 05000280-06-501, IR 05000281-06-501, IR 07200002-06-003; on 10/01-12/31, 2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated Repo | Boric Acid High winds Ultimate heat sink Nondestructive Examination Temporary Modification Significance Determination Process Maintenance Rule Program Biofouling Fire Protection Program |
IR 05000280/2006006 | 8 March 2006 | IR 05000280-06-006, 05000281-06-006, on 01/13, 01/23 - 27, 02/06 -02/10/2006, Surry, Units 1 and 2, Component Design Bases Inspection | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Foreign Material Exclusion Time Critical Operator Action |
IR 05000280/2006008 | 5 May 2006 | IR 05000280-06-008, IR 05000281-06-008 on 02/06-10/2006 for Surry Power Station, Units 1 and 2; Exercise Evaluation | Significance Determination Process Design basis earthquake Earthquake Preliminary White Finding |
IR 05000280/2006009 | 11 August 2006 | IR 05000280-06-009, IR 05000281-06-009, on 06/12-16/2006 & 06/26-30/2006 for Surry, Units 1 and 2; Triennial Fire Protection Inspection | Safe Shutdown Fire Barrier Coatings Emergency Lighting Significance Determination Process Job Performance Measure Thermoset Fire Protection Program Fire Watch |
IR 05000280/2006010 | 25 July 2006 | EA-06-071, Surry, Final Significance Determination for a White Finding & Notice of Violation (Surry Power Station - NRC Inspection Report Nos. 05000280-06-010, 05000281-06-010) | Time of Discovery Significance Determination Process Earthquake Preliminary White Finding |
IR 05000280/2006011 | 1 December 2006 | IR 05000280-06-011, IR 05000281-06-011 on 10/16/06 - 10/27/06 for Surry Power Station, Unit 1 & 2; Special Insp Report | Reserve Station Service Transformer Significance Determination Process |
IR 05000280/2006401 | 4 October 2006 | IR 05000280-06-401, & IR 05000281-06-401, Safeguards Removed) Surry Power Station | Affidavit |
IR 05000280/2006502 | 15 December 2006 | IR 05000280-06-502; 05000281-06-502; 11/13/2006 - 11/15/2006; Surry Power Station, Units 1 and 2; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. | Earthquake |
IR 05000280/2007001 | 1 March 2007 | Annual Assmt. Ltr - Surry, IR 05000280-07-001 and 05000281-07-001 | |
IR 05000280/2007002 | 30 April 2007 | IR 05000280-07-002, IR 05000281-07-002, on 01/01/2007 - 03/31/2007; Surry Power Station Units 1 & 2; Maintenance Risk Assessment and Emergent Work, Identification and Resolution of Problems, and Followup of Events | Reserve Station Service Transformer Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program Incremental Core Damage Probability Deficit |
IR 05000280/2007003 | 30 July 2007 | IR 05000280-07-003 and 05000281-07-003 on 04/01/2007 - 06/30/2007 for Surry Power | Safe Shutdown High winds Commercial Grade Dedication Probabilistic Risk Assessment Significance Determination Process Operability Determination Maintenance Rule Program Incremental Core Damage Probability Deficit Power change |