Category:Report
MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14051A7342014-02-20020 February 2014 Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 22014-02-20020 February 2014 Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 2 ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 2024-06-14
[Table view] Category:Technical
MONTHYEARNL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End2014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachme2014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment NL-14-0249, Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report2014-02-20020 February 2014 Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0812014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 162 of 217 Through 193 of 217 ML14071A0802014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 217 ML14071A0792014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 ML14071A0742014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 ML14071A0772014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 ML14071A0752014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14071A0732014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 ML14071A0722014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 ML14071A0712014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0682014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 562 ML14071A0672014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 2022-07-14
[Table view] |
Text
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Sheet 1 of/ 5 1 JvpStatus: YO NEI UFISeismic Walkdown Checklist (SWC)Equipment ID No. Q1R17BO02 Equip. Class' IEquipment Description MCC 10Location:
Bldg. AUXILIARY Floor El. 121 Room, Area 72 OManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y[2/N]of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
~~~&E ~ r fA.T, A e6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YECN/NO U- N/AOY[2'/N0 UO N/AOY4 ND U] N/AOYI[ NO U[ N/AQY[d NO U'-Enter the equipment class name from Appendix B: Classes of Equipment.
Page 351 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0F -F7Sheet 2 of 2I¢' -10Status: Yo N[O U[-Seismic Walkdown Checklist (SWC)EquipmentiDNo.
QIREf7fe2 Equip. iEquipment Description MCC 18Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
8, Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Yd ND UD N/ADY[2fANO U- N/AOYr/ND UD N/ADY4ND UOOther Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[ND UDadversely affect the safety functions of the equipment?
0 mnL~dtoa ae may be added as necessary) rL/ I 4vQ~*Jt~ ML~,(T~.Yu'AO Date: 7/to ,~Evaluated by:.Date: 1/1,P11 viv)I (K~)11/t01tVzPage 352 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Sheet 3 of:;3 , tkolt 90Status: Yj'NL-] UF'I]Seismic Walkdown Checklist (SWC)Equipment ID No. QIR178002 Equip.Equipment Description MCC 1BPhotographs I97To ppVE=P E-W JAOVe MjMtAt~E:10 TfH.E M~cC LQC-ATACI)0k AFth MrC C~)~ ~T C~Note:~ ~/ jn,T* dP WF~C 00J THE2ýT~ W~4--TI I iEAOT A~J AT Mep- 1Note:Note:Note:Page 353 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 354 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 355 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 356 of 562 NO. SNCF164-RPT-01, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 357 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.01\-,Jr-'% esmPage 358 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 359 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-'3-JPage 360 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS "T--I -V.nNO. SNCF164-RPT-01, VERSION 2.0Page 361 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-3-'t- N -. ,Page 362 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 363 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0TI..,-x ýZ-'Page 364 of 562 nki 11 AATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. lalNG io4-mr I-U0, vr'ru..' 'Page 365 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0,%Xshe ofStatus: Y9 NEI U[0Seismic Walkdown Checklist (SWC)Equipment ID No. OIR178507-A Equip. ClassýEquipment Description MCC INLocation:
Bldg. DIESEl Floor El. 155 Room, AreaManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL, The space below each of the following questions may be used to record the results ofjudgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Auchorase
- 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?NUI"2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Y9'Nr1 UlI N/ADYjN3UQ N/ADJYE'ND U-] N/AIDYO ND UD N/AlfY& NO UlEnter the equipment class name from Appendix B: Classes of Equipment Page 366 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0rC ~Status: uE%ýINJ USeismic Walkdown Checklist (SWC)Equipment ID No. 0IR17B507-A Equip. Class,Equipment Description MCC 1NInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yd"NQ U N/AC8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, UI] N/AC]and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Y[2/NE3 UC] N/AC]10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could UCadversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Plwc-~-, -z-t [IEvaluated'
-1161- Iq a" M frw"014v.
Page 367 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0.4Page 368 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0r-I I i .-- , I IPage 369 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Seismic Walkdown Checklist (SWC)Sheet 1 ofsfx'Staturs Y~dNI U1'N]uEquipment ID No. QIR18B029 Equip. Class'-2Equipment Description POWER DISCONNECT SWITCHLocation:
Bldg. AUIY U1ARY Floor E. ,/j4.. Room, AreaManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL, The space below each of the following questions may be used to record the results ofjudgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Auchorae1. Is the anchorage configuration verification required (i.e., is the item one YO N§1"1of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YNF'<0 U1) N/ADYe"NO Ul- N/AQY&NO UID N/ArYO NO U- N/AID "Yrb/NO 1)0IEnter the equipment clan name from Appendix B: Classes of Equipment.
Page 370 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment ID No. QIR18B029 Equip. Class, 2Equipment Description POWER DISCONNECT SWITCHCALSheeat ofStatus: YE N[-] U[']Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
YIV<DOUEJ N/ACJ8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, Y[tNF[] U--1 N/ADand masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yb/ND U0- N/AQ1;C'e t-T& r*i V-V POT~ or'4Q -JjC A I r a-XC Z t10.-'Baed on the above seismic interaction evaluations, is equipment free UDC of potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
YE4<cD UMComments (Additional pages may be added as necessary)
AJVDVfEvaluated by: .... k " * "( Y~yk~( x~1a <Z/Date: X -zo'Z-Page 371 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 372 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 373 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkcdown Checklist (SWC)Equipment ID No. Q1R168031 Equip. Class,NO. SNCF164-RPT-01, VERSION 2.0Sheet ofStatus:
UEJo .Equipment Description CIRCUIT BREAKER BOXLocation:
Bldg. AUXILIARY Floor El. 139 Room, Area 332Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Anehoraee
- 1. Is the anchorage configuration verification required (i.e., is the item one Y[C NEý 'of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?U['U N/AD*/N- U" N/AOY&<CJ UEJ N/AQYO1 Nil UC NI5",Y1140$F UQ]I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 374 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0She~t 2 ofV" 1Status: Yt NEI UL]Seismic Walkdown Checklist (SWC)Equipment ID No. OIR18B031 Equip. Class2Equipment Description CIRCUIT BREAKER BOXInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Y3,41( UD N/AD8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, Y[frlND UD N/ADand masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Y .-'ND- UD N/ADCOt,roo T A 00 5-5 / v,ý ,.-.fs,-w,
,.,,,Jj' t- k.,,W .t.. IT-s ,,'C.-40,, W_ -T- O's- hct ....5N1C tktkVC 1& -i5j --ýCL,-0. Based on the above seismic interaction evaluations, is equipment free UDof potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
Y&ýN[]UD]
Comments (Additional pages may be added as necessary)
/V 6 A.>;Evaluated by:G1 -1 04 1 DX-ýfUAýý Date: V.z /.r. u4¶i4 A_________
Page 375 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 376 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 377 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0F~I- r14Sheet I of 3Status: YEý N[] Ur"ISeismic Walkdown Checklist (SWC)Equipment ID No. QIR18B035 Equip. Class' 14Equipment Description CIRCUIT BREAKER BOXLocation:
Bldg. AUXILIARY Floor El. 139 Room, Area -3/Z Ai)Manufacturer, Model, Etc. (optional but recommended)
I ,Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y8-N"of the 50% of SWEL items requiring such verification)?
sewvALdd.. 3 -Z-o-q 52. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
Y[tA ur- N/A-1U0 N/A]ýýNO U!] N/AEYt< NO UI] N/AD-5& po-- &e p rd" , A,4cA d-- ýt --r Av c, e6. Based on the above anchorage evaluations, is the anchorage free of Y N0"] U!]potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 378 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Sheet 2 Of 3Status: 71NO] U0[Seismic Walkdown Checklist (SWC)Equipment ID No. O1R18B035 Equip. Class, 14Equipment Description CIRCUIT BREAKER BOXInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YA6NO- U["3 N/AD316N/NH UEJ N/ADYS.-N)D UD] N/AD" ~U0Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Yý NQ UDadversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 4 .02Evaluated by: 77 L.JA .Hg,"Date: 9,/o. 2_0/12ci. tOL'Page 379 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 380 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0SSheet 1 of-dýStatus: YMN-3 U-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q1R21BOO1A Equip. Class, 14Equipment Description VITAL AC BREAKER BOXLocation:
Bldg. AUXILIARY Floor El. 155' Room, Area 416Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchoraze I. Is the anchorage configuration verification required (i.e., is the item one YO Nof the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Yid NOI Ur N/AQY,0 NO UO N/AQYy"NO UO N/AOYO NO UO N/APfY)1No UQIEnter the equipment class name from Appendix B: Classes of Equipment.
Page 381 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Sheet 2 ofStatus: NI- UISeismic Walkdown Checklist (SWC)Equipment ID No. 01R21BOO1A Equip. Class,Equipment Description VITAL AC BREAKER BoxInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y)1NO UO N/AQY) NO UI N/AOY NEI U= N/AOYf ND UIOther Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y -NO U-Iadversely affect the safety functions of the equipment?
CommentS (Additional pages may be added as necessary)
- 2. ZAPEvaluated byEvaluated byDaeclý L-1 LLD(YDate:Page 382 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION 2.0Page 383 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS
&NO. SNCF164-RPT-01, VERSION 2.0Page 384 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 385 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Sheet 1 of " t L ',Status: Y[: f NO uf1Seismic Walkdown Checklist (SWC)Equipment ID No. QIR21EOO9C Equip. Class' 14Equipment Description INVERTER IC ,,W.., ..Location:
Bldg, AUXILIARY Floor El. # /it/ Room, Area ! p/ tManufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchoraee
- 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
YM NU2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?/YE/INC UO N/ACY[WN" U- N/AC/U NO UC N/AC5. Is the anchorage configuration consistent with plant documentation? NC UC(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
Vel~ie'l~b
£!OIIIOLVAANWOO t c *QHA2CtoMe FC7z5WS TOP-Q2IR2 w 9C " C,,IIZZI eO9A7 'PAT&V 'W/24/-9*
(N07)6. Based on the above anchorage evaluations, is the anchorage free of Y60t"No UCpotentially adverse seismic conditions?
N/ACIEnter the equipment class name from Appendix B: Classes of Equipment.
Page 386 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0r, 1 1 6? ý)ý-flSheet 2 off ;jrP1Status: YiA' N[] UrI] J11dF7Seismic Walkdown Checklist (SWC)Equipment ID No. QIR21EO09C Equip. Class, 14Equipment Description INVERTER ICInteraction Effects7. Are soft targets free firom impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YIN" UEJ N/ACY[V/NO U"I N/AlY[VN-I UCI N/AClY[4/N'- UCIOther Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YS(ND Ulladversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
MOVEEvaluated by:.RWPMKl5fi &J/ L/ 'IDate: __ __ __ __9 ,//Ox-I. 70AI/- 1 1 -IPage 387 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 388 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 389 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0Page 390 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0aII~1Page 391 of 562