ML14154A403

From kanterella
Revision as of 07:04, 28 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Peach Bottom Atomic Power Station, Summary of Public Meeting on May 29, 2014 to Discuss Assessment of the Safety Performance
ML14154A403
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/03/2014
From: Bower F L
Reactor Projects Region 1 Branch 4
To:
BOWER, F
References
Download: ML14154A403 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 3, 2014 MEETING SUMMARY LICENSEE: EXELON GENERATION CO., LLC. FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY OF PUBLIC MEETING On May 29, 2014 at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2013. (public) Access and Management System (ADAMS) with Accession No. ML14071A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2013, as documented in our letter dated March, 4, 2013 (ADAMS Accession No. ML14058A409). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and a local township official attended the open-house and the role of the agency in ensuring safe plant operations. /RA/ Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML14153A535)

ML14058A409. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and a local township official attended the open-house and the role of the agency in ensuring safe plant operations.

Enclosures:

Attendee List (ML14153A535) /RA/ Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email) F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, SRI B. Smith, RI S. Schmitt, ROAA RidsNRRPMResource DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2013 PB AAM\PB Annual Assessment Meeting Summary 2014.docx ADAMS Accession No.: ML14154A403 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MFannon/ MSF ATurilin/AT FBower/ FLB DATE 06/03/14 06/03/14 06/03/14