ML18067A006
ML18067A006 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 03/12/2018 |
From: | Kuntz R F Plant Licensing Branch III |
To: | Wrona D J Plant Licensing Branch III |
Kuntz R F, NRC/NRR/DORL/LPLIII, 415-3733 | |
References | |
Download: ML18067A006 (4) | |
Similar Documents at Monticello | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20240506, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-15015 May 2024
[Table view]Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240505, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-0707 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18067A0062018-03-12012 March 2018 Forthcoming Closed Meeting with Northern States Power Company Related to Security Plan Changes at Monticello Nuclear Generating Plant ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML14258A0652014-09-15015 September 2014 Forthcoming Meeting with Northern States Power Company - Minnesota (NSPM) to Discuss License Amendment Requests Associated with Areva Fuel Transition and Future Extended Flow Window for the Monticello Nuclear Generating Plant ML14169A5522014-06-13013 June 2014 Operator License Workshop Invitation ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML12311A3342012-11-0707 November 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota to Discuss the Monticello Nuclear Generating Plant Extended Power Uprate Review ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0932302042009-11-20020 November 2009 Notice of Meeting with Northern States Power Company to Discuss Issues Related to a Future Application for Amendment to Use the Maximum Extended Load Line Limit Analysis Plus (Mella+) Methodology ML0827304372008-09-30030 September 2008 Notice of Meeting with Northern States Power Co. Regarding a Future Amendment on Extended Power Uprate ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant ML0735318272007-12-21021 December 2007 Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island ML0725602242007-09-14014 September 2007 Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0609606082006-03-22022 March 2006 Meeting Agenda for Draft Suplement EIS Public Meeting - Monticello Nuclear Generating Plant ML0606700372006-03-21021 March 2006 Summary of Meeting to Discuss Full-Scope Application of Alternative Source Term (AST) Methodology for Monticello Nuclear Generating Plant ML0605906122006-02-28028 February 2006 03/22/2006 - Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal at Monticello Nuclear Generating Plant (Monticello) ML0604502112006-02-17017 February 2006 Notice of Meeting with Nuclear Management Company, LLC, Monticello Nuclear Generating Plant, Regarding Full-Scope Application of Alternative Source Term Methodology 2024-05-07 Category:Memoranda MONTHYEARML24039A1802024-02-23023 February 2024
[Table view]January 29, 2024 Teleconference Between the U.S. Nuclear Regulatory Commission and Xcel Energy ML23332A1652023-11-30030 November 2023 Second Limited Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML23313A1592023-11-0909 November 2023 U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticello'S Condensate Backwash Receiving Tank Fatigue Evaluation ML23110A0142023-05-0101 May 2023 Memo March 22, 2023, Monticello Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting ML23115A4382023-05-0101 May 2023 March 29, 2023, Meeting Summary for Environmental Review of Subsequent License Renewal Application for Monticello Nuclear Generating Plant, Unit 1 ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML22292A0122022-10-24024 October 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022 ML22084A3852022-03-31031 March 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application on March 15, 2022 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21055A7342021-03-25025 March 2021 Memo to File (EA-FONSI) ML20218A4462020-08-0505 August 2020 Summary of the July 16, 2020 Public Outreach to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML20022A1982020-01-17017 January 2020 Summary of the Public Open House to Discuss NRC Activities and the 2018 End-of-Cycle Performance Assessment ML18319A2462018-12-0707 December 2018 TSTF-425 Electronic Audit Summary (181115) ML18067A0062018-03-12012 March 2018 Forthcoming Closed Meeting with Northern States Power Company Related to Security Plan Changes at Monticello Nuclear Generating Plant ML17089A1502017-03-30030 March 2017 Memo to A. Hsia Summary of March 2, 2017, Meeting with Xcel Energy to Discuss Xcel Energy'S Proposed Exemption Request for Dry Storage Nuhoms Canisters, Numbers 11-15 at the Monticello Nuclear Generating Plant (W/Enclosure 1: Attendance Lis ML16159A2182016-06-0808 June 2016 Memorandum to C. Bladey Notice of Availability of Exemption for Xcel Energy, Monticello Nuclear Generating Plant, Independent Spent Fuel Storage ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15127A5692015-05-0707 May 2015 Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) ML15105A0142015-04-22022 April 2015 Request for Additional Information: Monticello Nuclear Generating Plant Physical Security Plan Revision 14 L-MT-14-104, Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information2014-12-16016 December 2014 Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML13204A3182013-11-13013 November 2013 Federal Register Notice Regarding the ACRS Power Uprates Subcommittee Meeting, December 3, 2013 ML13154A4702013-06-0404 June 2013 Rai'S Following Ifib Analysis 2013 Decommissioning Funding Status Report for Prairie Island 1 and 2 and Monticello ML12311A3342012-11-0707 November 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota to Discuss the Monticello Nuclear Generating Plant Extended Power Uprate Review ML12174A1562012-06-28028 June 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota (NSPM) to Discuss the Licensee'S Future Proposed Amendment Regarding Transition to Areva Astrium 10 Xm Fuel ML11356A2082011-12-30030 December 2011 Notice of Meeting with NSPM to Discuss a Future Proposed Amendment Regarding Revised Fuel Storage Criticality Analysis ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0932302042009-11-20020 November 2009 Notice of Meeting with Northern States Power Company to Discuss Issues Related to a Future Application for Amendment to Use the Maximum Extended Load Line Limit Analysis Plus (Mella+) Methodology ML0927303492009-09-30030 September 2009 Task Interface Agreement (TIA) - Unacceptable Preconditioning of Safety-Related Pressure Switches During Required Surveillance Testing at Monticello (TIA 2009-006) ML0826310122008-09-18018 September 2008 Special Inspection Charter for Loss of Normal Offsite Power to Non-Safety Buses and Resultant Reactor Scram on 9/11/2008 ML0813005872008-05-0909 May 2008 Notice of Meeting with Nuclear Management Company to Discuss the March 31, 2008, License Amendment Application for Extended Power Uprate for Monticello Nuclear Generating Plant ML0811302612008-04-25025 April 2008 Meeting Notice with Nuclear Management Co., to Discuss the 03/31/08 License Amendment Application for Extended Power Uprate for Monticello ML0811306982008-04-0707 April 2008 Notice of Meeting Cancellation with Nuclear Management Co., to Discuss the 03/31/2008 License Amendment Application for Extended Power Uprate for Monitcello ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0627604432006-10-31031 October 2006 Renewal of Full-Power Operating License for the Monticello Nuclear Generating Plant - Memo to Chairman and Commissioners from L. Reyes ML0612405562006-05-0909 May 2006 Operated by Nuclear Management Company (Nmc), LLC Safety Evaluation for the Conversion to the Improved Technical Specifications (TAC No. MC7505). Transmittal Memo ML0605906122006-02-28028 February 2006 03/22/2006 - Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal at Monticello Nuclear Generating Plant (Monticello) ML0602502942006-01-25025 January 2006 Canceled Notice of Meeting with Nuclear Management Company Regarding Fleet Transition to NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants ML0601300042006-01-10010 January 2006 Summary of Telephone Conference Call Held on December 21, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC Concerning Information Pertaining to the Monticello Nuclear Generating Plant License Renewal ML0535001712006-01-0505 January 2006 Safety Evaluation on Proposed Emergency Action Levels Based on Revision 4 to NEI 99-01, Methodology for Development of Emergency Action Level for Monticello Nuclear Generating Plant TAC No. MC5017, Docket No. 50-263 ML0535000842005-12-16016 December 2005 Docketing of the Sign-up Sheet and Slides for the Meeting of December 8, 2004, Regarding Independent Spent Fuel Storage Installation ML0516000812005-06-0909 June 2005 Memo Issuing Audit and Review Plan for Plant Aging Management Reviews and Programs for the Monticello Nuclear Generating Plant ML0432205822004-11-19019 November 2004 Forthcoming Meeting with Nuclear Management Company, LLC (NMC) Regarding the Independent Spend Fuel Storage Installation (ISFSI) at Monticello 2024-02-23 |
Contents
Text
MEMORANDUM TO: FROM:
SUBJECT:
DATE & TIME: LOCATION:
PURPOSE:
PARTICIPANTS:
MEETING CONTACTS:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 12, 2018 David J. Wrona, Chief Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Robert F. Kuntz, Senior Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licens* Office of Nuclear Reactor Regulation FORTHCOMING CLOSED MEETING WITH NORTHERN STATES POWER COMPANY RELATED TO SECURITY PLAN CHANGES AT MONTICELLO NUCLEAR GENERATING PLANT Thursday, March 22, 2018 9:00 a.m. -11 :00 a.m. U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 7-84 Rockville, Maryland The purpose of this meeting is for Norther States Power Company (NSPM) to describe planned security related modifications to the Monticello Nuclear Generating Plant. The meeting will discuss Sensitive Unclassified Non-Safeguards Information and therefore will not be open to public participation.
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Security and Incident Response (NSIR). NRC R.Kuntz, NRR P.Lee, NSIR et. al Robert Kuntz NRR 301-415-3733 robe rt. kuntz@nrc.gov Norther States Power Company M. Murphy, NSPM et. al Mahesh Chawla, NRR 301-415-8371 mahesh. chawla@nrc.gov D. Wrona To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket No. 50-263
Enclosure:
Agenda cc: Listserv AGENDA FORTHCOMING MEETING WITH NORTHERN STATES POWER COMPANY Meeting on Thursday, March 22, 2018 9:00 a.m. -11 :00 a.m.
- 9:00 a.m. -9:15 a.m.: Opening Remarks, Introductions
- 9: 15 a.m. -11 :00 a.m. -Northern States Power Company presentation of planned security related modifications to Monticello Nuclear Generating Plant Enclosure D. Wrona
SUBJECT:
FORTHCOMING CLOSED MEETING WITH NORTHERN STATES POWER COMPANY DATED MARCH 12, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorllpl3Resource RidsNrrPMRKuntz]
Resource RidsNrrLASRohrerResource RidsOpaMail Resource RidsRgn3MailCenter Resource Plee, NSIR ARivera, NSIR TWertz, NRR ADAMS Accession No.: ML 18067A006 OFFICE NRR/DORL/LPL3/PM NRR/D0RL/LPL3/LA NRR/D0RL/LPL3/BC NAME RKuntz SRohrer DWrona DATE 3/8/18 3/8/18 3/9/18 OFFICIAL RECORD COPY NRR/D0RL/LPL3/PM RKuntz 3/12/18