ML20085K184

From kanterella
Revision as of 14:39, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Commonwealth of Massachusetts Public Alert & Notification Sys Conversion Proposal Which Contains New Fixed Siren Silent Test Procedures to Support Siren Pole Restoration in Ma Portion of Facility EPZ
ML20085K184
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/25/1991
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085K190 List:
References
NYN-91174, NUDOCS 9110300191
Download: ML20085K184 (8)


Text

r-

$ D r' O C New Hampshire Y khh Ted C. Feigenbovm Preddent and Chici brutive Of ficer NYN 91174 October 25, 1991 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Dest Referecces: (a) Facility Operating License No. NPF-86, Docket No. 50 443 (b) NilY Letter NYN-91058 dated April 15,1991, " Siren Pole Restoration in Massachusetts Portion of the Seabrook EPZ", T. C. Feigenbaum to USNRC l

(c) USNRC Letter dated J uly 16, 1991, " FEM A Response to NRC Request for Review of Siren Transition Plan for F-) brook", J. II. Joyner to T, C. Feigenbaum (d) FEMA Letter dated October 11, 1991, D.11. Kwiatkowski to F. J.

Congel (USNRC), concerning conversion of the Vehicular Alert and Notification System to a fixed pole siren system (e) IEMA Letter dated October 11, 1991, D. H. Kwiatkowsii to P. J.

Stroup (Nil Y), concerning conversion of the Vehicular Alert and Notification System to a fixed pole siren system

Subject:

Siren Pole Rcstoration in the Massachusetts l'ortion of the Seabrook Station l Emergency Planning Zone Gentlemen:

In a letter dated April 15,1991 l Reference (b)), New Hampshire Yankee (NilY) provided a description of the process for the restoration of siren poles in the Massachusetts portion of the Seabrook Station Emergency Planning Zone (EPZ). Subsequent NRC and Federal Emergency Management Agency (FEMA) reviews resulted in a request for technical data and supporti ng documentation to allow FEM A to complete a technical review and analysis [ Reference (c)]. NHY has provided the requested data to FEM A and has provided explanations and addressed questions raised during the technical assistance meetings.

In a ! citer dated October 11,1991 [ Reference (c)), FEMA identified three specific issues that remained to be addressed in NHY's siren conversion proposal before the proposal could be finalized. These specific issues were: 1) the operability and reporting method; 2) the silent test program for the new fixed sirens and the silent test program for the VANS during the conversion period; and 3) the maintenance and operability acceptance and backup time periods ("X" and "Y" periods).

9110300191 911025 PDR ADOCK 05000443 F PDR g.

f Ebb -

New Hampshire Ycnkee Division of Pubbc Service Comr.any of New Hampshire u P.O. Box 300

  • Scobrook, NH 03874
  • Telephone (603) 474-9521 I

r 1 .

O Of United States Nuclear Regulatory Commission Octo'oer 25, 1998 l Attention: ' Document Control Desk- Page two In regard-to.the first issue, NilY intends to calculate operability utilizing a straight arithmetic 3verage. For the second issue, NHY will continue to perform silent tests at the Vehicle Alert and Notification System (VANS) during the transition period in the same way that these tests are -currently performed, i.e., locally at the VANS vehicle. The only difference will be' in regard to the EOC Dispatcher training, which will include silent ,

activation of the fixed sirens as opposed to the Vn;4S. For the third issue, the VANS will  :;

remain operational at- the VANS staging areas during the first 30 days ("X' period) of a three month transition period. _ in addition, after the first 30 days, the VANS "back up' capabit!ty will remain operational for the remaining 60-day period (the "Y" period). ,

Enclosure 1 contains a summary of the revind siren ecstoration proposa:1. ' Enclosure 2 provides the_ actual proposal. This proposal contains a detailed description of the process that NHY will follow to restore a fixed pole siren system and remove the VANS sirens within ,

the Mas'sachusetts_ portion of the Seabrook Statica EPZ. The process description addresses questions raised by FEMA personnel during _ technical review meetings and the three issues .

described in References _(d) and (e). Enclosure 2 also contains the new fixed siren silent test procedures. Site Services procedures 91325 and 91337 concern the administrative cor. trol-

~

of thel siren conversion process and the conduct of the silent tests. Site Services procedure. i 91338 concerns-silent testing as part of the EOC Dispatcher training for Massachusetts pole

~

mounted ' sirens.

New Hampshire Yankee will document the completion of the convers;on to fixed pole mounted sirens. In - a revision to the - Seabrook Station Radiological Emergency Plan.

. Additionally, after a year of operability data has been collected on the fixed pole mounted sirens, NHY will document all the changes made to the Public Alect and Notification System as an addendum to the Seabrook Station FEM A. REP-10 Desig;. Report.

The . siren pole restoration -process will ensure that adequate public alert and notification: capabilities are continuously provided for the Massachusetts portion of the EP?

New Hampshire Yankee has reviewed the conversion to a fixed pole mounted siren system per the criteria of 10CFR50.54(q) and determined that it does not decrease the effectiveness of thel Seabrook Station Radiologiect Emergency Plan (SSREP) or the Seabrook Plan for Massachusetts Communities (SPMC), and that the-SSREP and the SPMC'will continue to meet the standards of 10CFR50.47(b) and the re quirements of 10CFR50, Appendix E. NilY- i has worked with FEMA in several technical assistance meetings to ensure that the conversion to fixed pole mounted sirens does not decrease the effectiveness of the emergency plans.

NHY believes;that _ the revised siren conversion proposal adequately addresses the issues:

identified by-FEMA in Reference (e).

?

L To date, five sirens have been le stalled on poles in Newburyport, Massachusetts. The

-installation was completed on October 3,1991 and the 30-day 'X" pcriod testing began on October 9,1991. ~ lt is anticipated that the community wide test of the Newburyport fixed sirens'will be-' conducted on November 7, .1991.

I c

U s .

O O

-: United States Nuclear _ Regulatory Commission' October 25, 1991-Attention: Document Control Desk -Page three Should you have any questlons or require additionalinformation regarding this matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at -(603) 474 9521,

. extenilon 3772.

P Very !!uly yours, 1 [(g g[, pr.6-r-,

Ted C Feigefibaum Enclosure.

TCF:JM P/ss cc: Mr. Thomas T; Martin, Regional Administrator U S. Nuclear Regulatory Comtnission Region I 475 Allendale Road '

King of Prussia, PA 19406 Mr. Gordon Edison, Sr. Project Mgr.

Project Directorate-I 3 Division.of Reactor Projects U.S, Nuclear Regulatory' Commission Washington DC _20555 Mr. Noel Dudley NRC Resident' Inspector P.O. Box 1149

-- Scabrook, NH 03874 '

' Mr.1 John C. Dolan, Chairman Regional- Assistance Committee Federal Emergency _ Management Agency Region I John W.11cCormack Post Office

_ & Courthouse -Building

_ Boston, M A' 02109 Mr. 'A. David Rodham, Director

!: Commonwealth of Massachusetts Emergency Management Agency P.O. Box 1496 400 Worcester Road Framingham, M A - 01701 l;

o -

L l

4 O O UniteW States Nuclear Regulatory Commission October 25, 1991

- Attention: Document Control Desk : Page - four  ;

l Mr. Ebc C. McCabei Chief Emergency Preparedness Section U,S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Richard H. Strome, Regional Director Federal Emergency Management Agency.

Region I ,

John W McCormack Post Office l

& Court House Building Boston, M A 02109 l

.Mr. Dennis H. Kwiatkowski  :

Assistant Associate Director Office of Technological Hazards '

Federal Emergency Management Agency Washington,-DC 20472 Mr. Craig T. -Wingo, Chief

. Radiological Preparedness- Division

'Federcl Emergency Management Agency Washington, . DC 20472 Mr. Robert Erickson, Chief Emergency Preparedness Branch U.S. Nuclear Regulatory Commission ,

Washington, DC - 20555

^f e

i

O O-New flampshire Yankee October 25, 1991 ENCL.OSURE 1 TO NYN 01174 l

l l

l i

l l

l t-i l-I-

[',-. ' " ~ " - - _ , ,_ ,__ _ _ _ _ _ _ _ . -

t,1 O O Summary of Siren Conversion Pronosal The process tc, icpir.ce the VANS with a fixed pole system is a joint _ cffort between NHY and the six Massachusetts communities within the Sechrook Station EPZ. At all times during the process, the alert and _ notification capabilities provided to the Massachusetts residents within the EPZ will be at least equivalent to that curredly provided by the VANS as described in the' Seabrook Station FEMA REP 10 Design Report. NilY will again utilire the services of Wyle Laboratories to develop and verify acoustical models and to prepare the acoustical coverage analysis for the fixed pole mounted sirens. By applying design and -

testing programs similar to those already used for the VANS and the New llampshire fixed ,

pole mounted sirens, NHY will ensure that new fixed pole-mounted sirens in Massachusetts provide alert and notification capabilities at least equivalent to that of the existing VANS.

. NHY will follow what is essentially a six step -process covering all . aspects of the l transition from site selection through the submittal of an updated REP-10 Design Report to

. FEM A. The six steps are

s

. Selection of proposed fixed siren sites,

. Approval and permitting of sites by local authorities,

. Acoustical analysis of siten locations,

.. Installation, training and siren testing,  ;

e Removal of the -VANS from service, and

. Submittal of an updated Seabrook Station REP 'to Design Report.

During the installation and testing phase, each community in the Massachusetts portion  ;

of the Seabrook Station EPZ will train on the use of their respective portion of the siren j system during the initial functional teits, in addition, NHY will perform in-situ operability '

testing of each-of the pole mounted sirens, This testing will be an inaudible activation of  ;

the siren and control circuitry, or a ' silent test". The " silent test" will verify that the siren I will respond as expected upon receipt of an-activation signal.

When all sirens in a particular community have been installed and at or near the end of the X period testing, as described in Enclosure 2, the functional test of all sirens in that community will be performed. This test will be an actual and simultaneous activation of the Alert tone of_ all- sirens ~ in that community. Activation for this portion of the test will be from the NHY Offsite Response Organization (ORO) Emergency Operations Center (EOC) located in - Newington, - NH. . Local emergency _ management pe.sonnel will also _ test _

simultaneous ' activation.of the Alert tone of 'all sirens and activation of the public _ address mode. New Hampshire _ Yankee' will provide notification to FEMA regarding the community 3

wide tests to allow FEMA to observe, t

i:

1

i. _

I l

, 2

O O New llampshire Yanker will perform maintenance of the fixed pole mounted sirens utili7ing procedures simila* to those used on the New llampshire portion of the Public Alert ,

and Notification System (PANS). After the fixed pole mounted sirens in a community are operable and the initial acceptance test is complete the VANS that cover only that community will be removed from service. The VANS will be removed only after an acoustical analysis verifies that the remaining VANS and the pole mounted sirens will provide the required public alert and notification eeverage.

Upon completion of the conversion from VANS to fixed pole mounted sirens, a system wide test will be conducted with activation from the Nil t' 0110 Emergency Operations Center in Newington, Nil and the Massachusetts State Police Troop "A" lleadquarters in Framingha4a, M A.

t at 2

~

^

e

, # g O

t I

g

/

~

d 1

0

.4 A e a . Ja,M n. J i ai aim . .

f , .

~~

4 . ,

i ' T g

,f , g

, i

\' 4 k

  • _'.

g ,

s g g .4'  ; ,

d .e h 8 - r 6 .

9 e

r %f-9.

' is 4 f, .

1 > _

e-e

  • 6 i . , . . . . . . , . , '

,,,-b . y

  • ._+.,'a . ' . i ,, ., , , , , . ..

h

a.- I I

i i i

1. .

5 '-

.i E ~

New llampshire Ya5 Lee-Octc ber 25, 1991 I n

s i

i i.

j. --

r .\

i -

s E,

l' l,

1 i

!.1 ENCLOSURE 2 TO NYN-91174 l l';- I l f

' l r 1

(- 1 I

i <

a l~

i '.

d F

l. i 4J 'i i #

sJ'.

f t.

I 1

g iL  :

a _;

Iv _

f '_ i

.. s 4

4 I

O .

-