ML20203K846
From kanterella
ML20203K846 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 04/24/1996 |
From: | Beeler W, Lucchi D, Thomas R SOUTHERN CALIFORNIA EDISON CO. |
To: | |
Shared Package | |
ML20203K553 | List: |
References | |
S0123-606-1-359, S0123-606-1-359-1-R1, S123-606-1-359, S123-606-1-359-1-R1, NUDOCS 9803050252 | |
Download: ML20203K846 (200) | |
Similar Documents at San Onofre | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211B2381999-08-31031 August 1999
[Table view]Revised Interjurisdictional Policy for Songs ML20210P5971999-08-11011 August 1999 Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 ML20210P6301999-08-10010 August 1999 Corrected Proposed Tech Specs Re Diesel Generator Testing ML20210N5121999-08-0909 August 1999 Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 ML20196A9981999-06-17017 June 1999 Revised Pages to Risk-Informed IST Program for Sce ML20195E5171999-06-0808 June 1999 Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A3911999-05-24024 May 1999 Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 ML20216D9741999-05-0707 May 1999 Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak ML20199D0391999-01-13013 January 1999 Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2801999-01-11011 January 1999 Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons ML20198L6211998-12-31031 December 1998 Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation ML20198L5111998-12-23023 December 1998 Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description ML20198G4001998-12-22022 December 1998 Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE ML20196H9321998-12-0404 December 1998 Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate ML20195J9021998-11-23023 November 1998 Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9551998-11-23023 November 1998 Proposed Tech Specs Re Turbine Missile Protection ML20155B8741998-10-20020 October 1998 Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal ML20154J2991998-10-0909 October 1998 Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B ML20153G7511998-09-22022 September 1998 Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6801998-09-10010 September 1998 Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6561998-09-0404 September 1998 Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances ML20206N5381998-08-12012 August 1998 Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 ML20236S6241998-07-22022 July 1998 Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO ML20249B4291998-06-19019 June 1998 Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels ML20216B6201998-05-11011 May 1998 Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B ML20216B4141998-05-0707 May 1998 Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8471998-04-0606 April 1998 Proposed Tech Specs Revising Containment Isolation Valves Completion Times ML20206N5231998-03-16016 March 1998 Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions ML20216C0051998-03-0606 March 1998 Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 ML20206E6001998-02-27027 February 1998 Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm ML20199K6451998-02-0303 February 1998 Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program ML20206N5021998-01-30030 January 1998 Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 ML20198H8511998-01-0909 January 1998 Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train ML20198H7601998-01-0909 January 1998 Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time ML20198H6881998-01-0909 January 1998 Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks ML20198E6051998-01-0202 January 1998 Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing ML20197C7281997-12-19019 December 1997 Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability ML20199C6391997-11-14014 November 1997 Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20198P4011997-10-31031 October 1997 Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan ML20217K0081997-10-16016 October 1997 Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20148R4051997-06-30030 June 1997 Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 ML20141B4481997-06-18018 June 1997 Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions ML20198R0281997-05-30030 May 1997 Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 ML20217P9981997-05-28028 May 1997 Rev 30 to SONGS Unit 2 & 3, Odcm ML20137V2501997-04-15015 April 1997 Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing ML20134P9941997-02-21021 February 1997 Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation 1999-08-09 Category:TEST REPORT MONTHYEARML20217K0081997-10-16016 October 1997
[Table view]Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20147D6351996-11-15015 November 1996 Rev 0 to LOCA Test of 'Moisture Dam' Modified Rockbestos RSS-6-104/LE Coaxial Cable,Abb/Ce Mineral Insulated Triaxial Cable & Conax Coaxial Penetration Feedthroughs for Reg Guide 1.97 Hrrm Sys ML20203K8461996-04-24024 April 1996 Rev 1 to Electromagnetic Interference (EMI) Test Rept on Radiation Monitoring Sys ML18039A9371994-06-0606 June 1994 Approval Seismic Testing of High Voltage Shutdown Relay. ML20097D4831992-06-0505 June 1992 Reactor Containment Bldg Integrated Leak Rate Test San Onofre Nuclear Generating Station,Unit 3 ML20155J3541988-07-31031 July 1988 Reactor Containment Bldg Integrated Leak Rate Test, Final Rept ML20197A4581986-08-20020 August 1986 Rept of Analysis ML20151T9251986-01-31031 January 1986 End-of-Cycle 1 Diagnostic Fuel Exam Rept ML20151N8531985-11-30030 November 1985 Remote Initiation of Shutdown Cooling Test Performed 850916-17 at San Onofre Nuclear Generating Station Unit 3 ML20141N8811985-11-30030 November 1985 Reactor Containment Bldg Integrated Leak Rate Test Final Rept ML20099C2771984-11-30030 November 1984 Nonproprietary Rev 3 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase I Software Verification Test Rept ML20099C2581984-11-30030 November 1984 Nonproprietary Rev 2 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase II Software Verification Test Rept ML20095F9451984-03-31031 March 1984 Nonproprietary Version of Rev 2 to Cpc/Ceac Sys Phase I Software Verification Test Rept ML20095F9241984-03-31031 March 1984 Nonproprietary Version of Rev 0 to Cpc/Ceac Sys Phase II Software Verification Test Rept ML20080U4931984-01-31031 January 1984 Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station ML20079M6361984-01-25025 January 1984 Leakage Reduction Program Test Results ML20132E4051983-10-0505 October 1983 Suppl II to San Onofre Nuclear Generating Station Unit 2 Initial Startup Rept ML20073L9021983-01-19019 January 1983 Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 3 ML20073L8821983-01-0303 January 1983 Rev 0 to Plant Protection Sys Preoperational Test,San Onofre Nuclear Generating Station Unit 3 ML20073L9191982-04-21021 April 1982 Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 2 ML20050B8041982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 2 Program Results ML20050B8091982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 1 ML20050B8101982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 2 ML20050B8021982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 1 Executive Summary ML20053F0061982-03-31031 March 1982 Performance Test Rept,Prompt Alerting Sys for San Onofre Nuclear Generating Station. One Oversize Map Encl.Aperture Card Available in PDR ML20010C7741981-08-0505 August 1981 Nonproprietary Version of Cpc/Ceac Sys Phase II Software Verification Test Rept. ML20010C7821981-08-0505 August 1981 Nonproprietary Version of Cpc/Ceac Sys Phase I,Software Verification Test Rept. ML13311A2791981-04-15015 April 1981 Addendum to Review of Seismic Qualification Documentation for Certain Balance of Plant & NSSS Items. ML20002A5911980-10-10010 October 1980 Nonproprietary Version of CEN-140(S)-NP, Data Transmittal for Southern CA Edison Fuel Audit Analysis. ML13311A2781978-12-15015 December 1978 2AP&ALM-AR Style B C5-N/SRC Current Production & 2AP&ALM-AR Style a Naturally Aged Alarm,Relay Output. ML20151X0771977-07-31031 July 1977 Vol 1, Main - Technical Discussion, of Final Rept of Onshore Tracer Tests Conducted Dec 1977 - Mar 1977 at San Onofre Nuclear Generating Station ML20151X0911977-07-31031 July 1977 Vol 2, Meteorological Data Summaries W/Description of Instrumentation & Calibr, of Final Rept of Onshore Tracer Tests Conducted Dec 1976 - Mar 1977 at San Onofre Nuclear Generating Station 1997-09-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20203K846&oldid=3030334"