|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211B2381999-08-31031 August 1999 Revised Interjurisdictional Policy for Songs ML20210P5971999-08-11011 August 1999 Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 ML20210P6301999-08-10010 August 1999 Corrected Proposed Tech Specs Re Diesel Generator Testing ML20210N5121999-08-0909 August 1999 Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 ML20196A9981999-06-17017 June 1999 Revised Pages to Risk-Informed IST Program for Sce ML20195E5171999-06-0808 June 1999 Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A3911999-05-24024 May 1999 Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 ML20216D9741999-05-0707 May 1999 Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak ML20199D0391999-01-13013 January 1999 Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2801999-01-11011 January 1999 Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons ML20198L6211998-12-31031 December 1998 Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation ML20198L5111998-12-23023 December 1998 Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description ML20198G4001998-12-22022 December 1998 Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE ML20196H9321998-12-0404 December 1998 Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate ML20195J9021998-11-23023 November 1998 Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9551998-11-23023 November 1998 Proposed Tech Specs Re Turbine Missile Protection ML20155B8741998-10-20020 October 1998 Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal ML20154J2991998-10-0909 October 1998 Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B ML20153G7511998-09-22022 September 1998 Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6801998-09-10010 September 1998 Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6561998-09-0404 September 1998 Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances ML20206N5381998-08-12012 August 1998 Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 ML20236S6241998-07-22022 July 1998 Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO ML20249B4291998-06-19019 June 1998 Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels ML20216B6201998-05-11011 May 1998 Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B ML20216B4141998-05-0707 May 1998 Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8471998-04-0606 April 1998 Proposed Tech Specs Revising Containment Isolation Valves Completion Times ML20206N5231998-03-16016 March 1998 Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions ML20216C0051998-03-0606 March 1998 Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 ML20206E6001998-02-27027 February 1998 Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm ML20199K6451998-02-0303 February 1998 Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program ML20206N5021998-01-30030 January 1998 Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 ML20198H8511998-01-0909 January 1998 Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train ML20198H7601998-01-0909 January 1998 Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time ML20198H6881998-01-0909 January 1998 Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks ML20198E6051998-01-0202 January 1998 Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing ML20197C7281997-12-19019 December 1997 Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability ML20199C6391997-11-14014 November 1997 Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20198P4011997-10-31031 October 1997 Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan ML20217K0081997-10-16016 October 1997 Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20148R4051997-06-30030 June 1997 Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 ML20141B4481997-06-18018 June 1997 Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions ML20198R0281997-05-30030 May 1997 Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 ML20217P9981997-05-28028 May 1997 Rev 30 to SONGS Unit 2 & 3, Odcm ML20137V2501997-04-15015 April 1997 Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing ML20134P9941997-02-21021 February 1997 Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation 1999-08-09
[Table view] Category:TEST REPORT
MONTHYEARML20217K0081997-10-16016 October 1997 Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20147D6351996-11-15015 November 1996 Rev 0 to LOCA Test of 'Moisture Dam' Modified Rockbestos RSS-6-104/LE Coaxial Cable,Abb/Ce Mineral Insulated Triaxial Cable & Conax Coaxial Penetration Feedthroughs for Reg Guide 1.97 Hrrm Sys ML20203K8461996-04-24024 April 1996 Rev 1 to Electromagnetic Interference (EMI) Test Rept on Radiation Monitoring Sys ML18039A9371994-06-0606 June 1994 Approval Seismic Testing of High Voltage Shutdown Relay. ML20097D4831992-06-0505 June 1992 Reactor Containment Bldg Integrated Leak Rate Test San Onofre Nuclear Generating Station,Unit 3 ML20155J3541988-07-31031 July 1988 Reactor Containment Bldg Integrated Leak Rate Test, Final Rept ML20197A4581986-08-20020 August 1986 Rept of Analysis ML20151T9251986-01-31031 January 1986 End-of-Cycle 1 Diagnostic Fuel Exam Rept ML20151N8531985-11-30030 November 1985 Remote Initiation of Shutdown Cooling Test Performed 850916-17 at San Onofre Nuclear Generating Station Unit 3 ML20141N8811985-11-30030 November 1985 Reactor Containment Bldg Integrated Leak Rate Test Final Rept ML20099C2771984-11-30030 November 1984 Nonproprietary Rev 3 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase I Software Verification Test Rept ML20099C2581984-11-30030 November 1984 Nonproprietary Rev 2 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase II Software Verification Test Rept ML20095F9451984-03-31031 March 1984 Nonproprietary Version of Rev 2 to Cpc/Ceac Sys Phase I Software Verification Test Rept ML20095F9241984-03-31031 March 1984 Nonproprietary Version of Rev 0 to Cpc/Ceac Sys Phase II Software Verification Test Rept ML20080U4931984-01-31031 January 1984 Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station ML20079M6361984-01-25025 January 1984 Leakage Reduction Program Test Results ML20132E4051983-10-0505 October 1983 Suppl II to San Onofre Nuclear Generating Station Unit 2 Initial Startup Rept ML20073L9021983-01-19019 January 1983 Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 3 ML20073L8821983-01-0303 January 1983 Rev 0 to Plant Protection Sys Preoperational Test,San Onofre Nuclear Generating Station Unit 3 ML20073L9191982-04-21021 April 1982 Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 2 ML20050B8041982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 2 Program Results ML20050B8091982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 1 ML20050B8101982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 2 ML20050B8021982-04-0505 April 1982 Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 1 Executive Summary ML20053F0061982-03-31031 March 1982 Performance Test Rept,Prompt Alerting Sys for San Onofre Nuclear Generating Station. One Oversize Map Encl.Aperture Card Available in PDR ML20010C7741981-08-0505 August 1981 Nonproprietary Version of Cpc/Ceac Sys Phase II Software Verification Test Rept. ML20010C7821981-08-0505 August 1981 Nonproprietary Version of Cpc/Ceac Sys Phase I,Software Verification Test Rept. ML13311A2791981-04-15015 April 1981 Addendum to Review of Seismic Qualification Documentation for Certain Balance of Plant & NSSS Items. ML20002A5911980-10-10010 October 1980 Nonproprietary Version of CEN-140(S)-NP, Data Transmittal for Southern CA Edison Fuel Audit Analysis. ML13311A2781978-12-15015 December 1978 2AP&ALM-AR Style B C5-N/SRC Current Production & 2AP&ALM-AR Style a Naturally Aged Alarm,Relay Output. ML20151X0771977-07-31031 July 1977 Vol 1, Main - Technical Discussion, of Final Rept of Onshore Tracer Tests Conducted Dec 1977 - Mar 1977 at San Onofre Nuclear Generating Station ML20151X0911977-07-31031 July 1977 Vol 2, Meteorological Data Summaries W/Description of Instrumentation & Calibr, of Final Rept of Onshore Tracer Tests Conducted Dec 1976 - Mar 1977 at San Onofre Nuclear Generating Station 1997-09-11
[Table view] |
Text
- --- -- ->
~
It' Ii0 I.M 411 P.OZ
-n) Ci) 00 z 'r > O
> Nd oo 0> 0:
x1 N Dr 0 P-4 N~~ 0 z 1- HUz
- xH 4-4 N . A 0 ci0
~~C02
>N CO NC 0 In
< m a cl 03 ci2
> )0 0 z 4
- 08 m i (D pa 00 H CD 00 t) r.
H 0C
K:)0 H- 0En < ~
- r. I-i "0 1:1 R i I tl c H 0t mf rt, MHP 0 H H- H :7 U CnPl ~UIM0 ~
0- En( 0j (-h md t~RO fl~.0 RI O~H rt fl.
ft H C0 (1 00m 0 ft ft 0 P. tki w A) :3 w :3 0 P_ :3 0 -1 -H hct Hr" 0 rt 0 lu0 * "P_0W p P1~. DO H 0 M0 (D 0 0 0 O3 1 '~t:j 0 0 M Fl tO H H IM P.Oj (t 0- Ro j ILH 0 H r0(pc i~~~, R ('r 'Ht'i ftf W nO (D0H 0 ft 0 A fO0HF 0(f 0 fLW 0 r 0 (0 aJ t 0) 0 :y 0OU)Rp U) 01 Ir pI Hrt m rt to0 (0r I i0 MFR i U)0 (Dm 0 too P 0
- Y1 0 ti H*
Ri ti m LQ R l ft m 0 P_ m0 ( f t X rt H
- 1 (n F -HRIa rtJ p-) CL 00 M(
Ht 0I %D fft tn. 0 00 rtH F, J' *
(n H-I- 0 0 ft U)
(D OtH- Zt ft P i ft 0 0 m't H. 0 tr U)- w:r 0 ft f.t (DH 0 :3 En -'V H
i m
L~~ oY zoo m
y m H. m O w C P. 0 (D O. 0 (
1H M 0ot
( 0 O (D O 'w MtP Pt H O p P.H O - H H m Pt es) HR~ ft, 010
- 0) Hrt0 H- (D ft w s 0O1-C F-W rt 0:m I-H (A 0000 C cn m wE t (D 0 . I w 0 x ft I Ot G1-OC0H. I t m HP - mH- W - 4 O mP O CD0(a Cg H 0 i t M '0 Pt H I t 0 H I ftH- OI H- i O *0f H O M A 0 O :P* O 0 O (D 0 o 0 11 0 P- M A# *4 CR 0 6 m Ij. rH- (<'D 8. a)8 0 t 0 o 0
'o a P. 0 CD CD , mwaHC 0 OOP H Mx fP O)
' t q H H NLl0 E H 0 OM EH (D f O0O P. 0 H #m Oj O0 O 0 CR (0 H (D . C (D :3 U) 0 (n 0 < 0 ow p. *O tt 0 0 0 0
() (a m0n P. 0 0 Ht H-> 0 0tD.
ft O C ) DP 1-3 C P
,aH HO 43 I'H 001 (Dl (D CD
( P Y 3 OH-t 0 HC)HPP10 mo . 0 (DfO 0 k 0) 0 0CR CR ;'-iq M1 OP I0 0 H ft
M m0 (A fu1 0 ~ ~ wc jI C t'r *H Jp 10'0 O mftH-
- P D(DE OLOP 3F H-c F, (D optwm00I a
- j r I . t He A H H-C ' A) o< (D(it H-u D 1 04 M 0 AOa 0 1 1 Ht M3
" i O j 0 A m 0 0 M mHL# P mS 0
PP)P
(. 0 Eh F4 o0 0-P- M-t1 H C) 0 NO
- 0. H--t 0) 0 0 t00 ,: a *)rt( SH :jHC10 CrP-IY0 P m'1f PI(AC) CRtf CH H C Fit C m0 ft 04 0' PI0 R 0 H-C) 0 CP- IOH '0' 1"g )
x:
0 0 m' ft 4 H0 mft 0 t OPpmH P. 0~f jw Dm ft2P UN 0 00D 00t En :MCR A)HUI0 :y H j( MMr 0w ODI m (D0 w CR CR U
P, H H)O 0 U) H)
I WVYLE LABORA1UME3 REPORT NO. 26321-1 SCIENTIFIC SERVICES &SYSTEMS GROUP WESTERN OPERATIONS, NORCO FACILITY PAGE NO 4 I
4.5 BOP 22 - Auxiliary Relay Cabinets The cabinet structure was qualified by analysis. The components were qualified by test to computer predicted test levels.
Multi-frequency and sinusoidal tests were performed on the components.
The test program is acceptable.
5.0 REVIEW OF NUCLEAR STEAM SUPPLY SYSTEM ITEMS 5.1 NSSS 1 b-l- PPS Items The TRS enveloped the RRS for a biaxial multi-frequency excitation.
A sine burst at four frequencies was superimposed on the random waveform to achieve enveloping at frequencies from 1 to 2 hz.
Minor mechanical and electrical deficiencies were noted. No judgement is;made herein as to the acceptability of these deficiencies.
In all other respects, the test program is acceptable.
5.2 NSSS 2 f - RCP SSSS Signal Processor The TRS enveloped the RRS above 12 hz, except as noted below. The accelerometers were adequately located. There were .no resonances detected in the signal processor. The TRS from the 16 hz sine beat excitation dipped below the predicted RRS at 40 and 65 hz but the ZPA was 1.8 times the required level, so this is judged to be acceptable.
The processor was supported at the back during the testing, and should, therefore, be supported in a similar manner in its cabinet mounting.
The test program is acceptable.
5.3 NSSS 9 - Indicators I The tests were performed with sine beat tests at each integer frequencies from 1 to 35 hz at 3.5 g's (limited to 18 inches d.a.)
The indicators are mounted in the main control console which has been shown to be rigid. The sine beat tests are judged to be of sufficient-le-vel-to-be-an--acceptable-test..for .these-devices..
No judgment is made here of the acceptability of certain functional questions.
I I
I WYLE lAMES ": REPORT NO. 26321-1 SCIENTIFIC SERVICES & SYSTEMS GROUP WESTERN OPERATIONS, NORCO FACILITY PAGE NO 5 I 5.4 NSSS 10 - Indicating Controller I -
These devices are mounted in a rigid section of the main control panel. The items were tested with sine beat excitation from 1-35 hz. The peak acceleration level was 3 g's. Considering the mounting location, this is judged to be a sufficient test level.
5.5 NSSS 11 - Recorder This unit was tested with 3 g sine beats over a frequency range of 1-35 hz. The recorders are mounted ina panel which has been shown to be rigid. The sine beat level is judged to be sufficient, and the test is acceptable.
5.6 NSSS 16 & 17 - Nuclear Instrument Detector/Preamplifier/Filter The.TRS did not envelop the RRS below 4 hz. The lowest resonance I frequency by was 10 hz (the reported 6 hz resonance has been raised a design change). The items were adequately instrumented.
In the horizontal direction the TRS dipped below the RRS by 10%
at 70-80%hz. Considering the overall TRS, this is judged to be acceptable. In the vertical direction the TRS is below the RRS from 30 to 44 hz and above 70 hz. Considering the design of the detector and other static pull tests performed on it, this devi ation is judged to be acceptable. Considering the size, weight, design, andorientation of the pre-amplifier and filter, the deviation is judged to be acceptable..
The test program is acceptable.
5.7 NSSS 19 & 20 - Magnetic Flow Tube & Transmitter These items were subjected to sine beat tests from 2-3 g's.
Considering the compact and non-resonant nature of the items, the test is considered satisfactory.
5.8 NSSS 21 & 22 - Containment Purge Isolation Detector & Transmitter The TRS enveloped the RRS. The test was performed with biaxial multi-frequency excitation. The equipment was operated and monitored during the test.
The test program is acceptable.
I I
I
m -M rn m JtW.~c o~ 0 C)~ r 3:>1nM m Cm_ C mm
--- M o~ e, CC>OM r- -
m m C
.z