Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E, BVY 06-076, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 8, BVY 06-079, 2006/08/22-Vermont Yankee License Renewal Application, Amendment 11, BVY 06-083, 2006/09/05-Vermont Yankee License Renewal Application, Amendment 12, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY 06-096, 2006/10/20-Vermont Yankee - License Renewal Application, Amendment No. 17, BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19, BVY 06-098, E-mail: (PA-LR) Copy of Vhs RAI Response, BVY 07-003, Email: (PA-LR) Vermont Yankee Nuclear Power Station License Renewal Commitment List, Rev. 5, BVY 07-009, License Renewal Application, Amendment 24, BVY 07-018, License Renewal Application, Amendment 26, BVY 07-034, License Renewal Application Annual Update, BVY 07-035, (PA-LR) Bvy 07-035 VY Lr SER Comments, BVY 07-047, License Renewal Application, Amendment 27, Submitted on January 25, 2006, BVY 07-058, License Renewal Application, Amendment 29, BVY 07-062, License Renewal Application, Amendment 30, BVY 07-066, License Renewal Application, Amendment 31, BVY 08-016, (PA-LR) Emailing Bvy 08-016 Final SER Review Comments, BVY 10-069, License Renewal Application Annual Update Information, ML060950195, ML060950215, ML060950218, ML060950220, ML060950224, ML060950235, ML060950250, ML060950258, ML060950262, ML060950269, ML060950271, ML060950277, ML060950279, ML060950284, ML060950290, ML060950301, ML060950311, ML060950323, ML060950328, ML060950331, ML060950347, ML060950351, ML060950356, ML060950364, ML060950370, ML060950372, ML060950375, ML060950540, ML060950549, ML060950559, ML060950567... further results
|
MONTHYEARML0629203681987-12-31031 December 1987 VY Annual Ecological Studies of the CT River Report 16-final.pdf Project stage: Other ML0629203651989-12-31031 December 1989 VY Annual Ecological Reports from the 1980's (1989) Project stage: Other ML0609503511998-02-28028 February 1998 GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E2006-01-25025 January 2006 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E Project stage: Other ML0609506372006-03-22022 March 2006 GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506322006-03-22022 March 2006 GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506292006-03-22022 March 2006 GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506202006-03-22022 March 2006 GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502792006-03-22022 March 2006 GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505962006-03-22022 March 2006 GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505872006-03-22022 March 2006 GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505822006-03-22022 March 2006 GALL AMP: XI.M25, BWR Reactor Water Cleanup System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505792006-03-22022 March 2006 GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505592006-03-22022 March 2006 GALL AMP: XI.M20, Open-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505402006-03-22022 March 2006 GALL AMP: XI.M18, Bolting Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503702006-03-22022 March 2006 GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502182006-03-22022 March 2006 GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609501952006-03-22022 March 2006 GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP) Project stage: Other ML0610001472006-03-22022 March 2006 GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001432006-03-22022 March 2006 GALL AMP: XI.S7, Rg 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001382006-03-22022 March 2006 GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001342006-03-22022 March 2006 GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001262006-03-22022 March 2006 GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001012006-03-22022 March 2006 GALL AMP: XI.S2, ASME Section XI, Subsection Iwl (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000962006-03-22022 March 2006 GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503232006-03-22022 March 2006 GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503112006-03-22022 March 2006 GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503012006-03-22022 March 2006 GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Project stage: Other ML0609503722006-03-22022 March 2006 GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503752006-03-22022 March 2006 GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505672006-03-22022 March 2006 GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505732006-03-22022 March 2006 GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506102006-03-22022 March 2006 GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506342006-03-22022 March 2006 GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000782006-03-22022 March 2006 GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502242006-03-22022 March 2006 GALL AMP: XI.E1, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502352006-03-22022 March 2006 GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502692006-03-22022 March 2006 GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP) Project stage: Other 1998-02-28
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML15329A1802015-11-24024 November 2015 E-mail from J. Whited Draft RAIs Re Duke License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413 Through MF6422) ML15295A2132015-10-21021 October 2015 NRR E-mail Capture - VY RAI for Off-site Insurance Exemption (10 CFR 140.11) - MF3980 ML15289A6002015-09-24024 September 2015 La 3 - Vermont Yankee Draft Responses or Edits 9 24 15.docx ML15289A6012015-09-23023 September 2015 La 3 - Nrr_Vermont Yankee Nuclear Power Station Decommissioning Status.Docx ML15288A3532015-09-21021 September 2015 La 3 - VY Dtf LAR - Status ML15257A6172015-09-14014 September 2015 La 3 - Testing the New Profile for Vermont Yankee La 3 - Public ML15195A3592015-07-14014 July 2015 NRR E-mail Capture - Acceptance Review for Vermont Yankee Amendment -Revise Cyber Security Plan Implementation ML15289A0022015-06-17017 June 2015 La 3 - Question from Ma ML15289A5982015-06-0909 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 5 2015 Letter from Vermont, Vynpc, and Gmp to NRC Attached ML15289A0072015-06-0505 June 2015 La 3 - Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15289A2432015-06-0404 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 4 2015 Vermont Letter to NRC Attached ML15289A0062015-06-0404 June 2015 La 3 - FW: Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15288A3592015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3602015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3622015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A4822015-05-22022 May 2015 La 3 - Vermont Reply to NRC & Entergy Answers Re VY LA-3 ML15289A0042015-05-19019 May 2015 La 3 - New Proposal Dates for Phone Call with VT ML15289A0052015-05-11011 May 2015 La 3 - ML Numbers for Disbursement Letters for Vermont Yankee ML15289A5992015-05-0808 May 2015 La 3 - Call with State of VT ML15289A0032015-05-0707 May 2015 La 3 - Other than for Comanche Peak, ML15289A1252015-05-0606 May 2015 La 3 - FRN Review - VY Dtf Exemption ML15128A0232015-04-27027 April 2015 NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of Entergy 2021-03-15
[Table view] |
Text
'EqJonathan Rowley -Seipt.-2-5call summary 15ýqTe i From: To: Date:
Subject:
Jonathan Rowley mhamer@entergy.com 10/18/2006 3:28:47 PM Sept. 25 call summary Mike Please review and provide comments on the attached conference call summary.Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301) 415-4053 00008.TMP Pa6qe 1 ]t~D\GW~O~TMP ane ill I Mail Envelope Properties (4536806F.C9F:
12: 35182)
Subject:
Creation Date From: Created By: Sept. 25 call summary 10/18/2006 3:28:47 PM Jonathan Rowley JGR @nrc.gov Recipients entergy.com PM mhamer (mhamer@enftergy.com)
Action Transferred Date & Time 10/18/2006 3:29:22 Post Office Delivered Route entergy.com Files Size Date & Time MESSAGE 829 10/18/2006 3:28:47 PM Summary of Telephone Conference
-September 25, 2006 (VY).wpd 27994 10/18/2006 3:27:14 PM Options Auto Delete: No Expiration Date: None Notify Recipients:
Yes Priority:
Standard ReplyRequested:
No Return Notification:
Send Notification when Opened Concealed
Subject:
No Security:
Standard To Be Delivered:
Status Tracking: Immediate Delivered
& Opened
[Foathan Rowley -Summary of Telephone Conference
-September 25, 2006 (VY).wpdPa
ýa ýqeý I LICENSEE:
Entergy Nuclear Operations, Inc.FACILITY: Vermont Yankee Nuclear Power Station
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 25, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., (ENO) held a telephone conference call on September 25, 2006, to discuss and clarify the staff's requests for additional information (RAIs) concerning the Vermont.Yankee Nuclear Station (VYNPS) license renewal application (LRA). The conference call was..xw.: useful in clarifying the staff's questions.
Enclosure 1 provides a listing of the conference call participants.
Enclosure 2 contains a listings.of the. issues discussed with the applicant, including a brief discussion of the items' status. .,I: The applicant had an opportunity to comment on this summary.Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
As stated cc w/encls: See next page
_Rowle -- Sum m a--ry-o-f-Tele.phon--e Co-nference---S-eptemb--e-r-2-5--,-
20-0-6---(-V--Y---)-.w--
Page 2 ji VJo~at~n Rowley -Summary of Telephone Conference
-SeptembeK25, 2OO~ ('J'Yjwpd Pa~2~~LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 Participants Jonathan Rowley Lambros Lois Ganesh Cheruvenki Naeem Iqbal Andy Taylor[ori Potts Dave King Ron Finnin Larry Luckins Affiliations U.S. Nuclear Regulatory Commission (NRC)NRC NRC NRC Entergy Nuclear Operations, Inc. (ENO)ENO ENO ENO ENO SJonathan Rowley TelephoneConference
-September 25, 2006 (VY).wpd gj VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 25, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 25, 2006, to discuss and clarify the staff's requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call: RAI 2.3.3.8-1 License renewal application (LRA) drawing LRA-G-1 91163-SH-01
-0, "Fire Protection System Inner Loop," shows the yard fire hydrants as out of scope (i.e., not colored in purple). Verify whether the yard fire hydrants are in scope of license renewal in accordance with Title 10 Code of Federal Regulations Part 54.4(a) (10 CFR 54.4(a)) and subject to an aging management review (AMR) in accordance with 10 CFR 54.21(a)(1).
If they are excluded from the scope of license renewal and not subject to an AMR, please provide justification for the exclusion.
Discussion:
The staff did not find the applicant's response in their September 20, 2006 letter (License Renewal Application, Amendment
- 14) to this RAI acceptable.
The staff reiterated its position.
The applicant will attempt to provide an adequate supplemental response to this concern in a future letter to the NRC.RAI B.1.2-1 The applicant states that the Control Rod Drive (CRD) return line nozzle has been capped at VYNPS. The staff requests that the applicant provide the following information regarding the cap and the weld.(1) Describe the configuration, location and material of construction of the capped nozzle.This should include the existing base material for the nozzle, piping (if piping remnants exist) and cap material, and any welds.(2) Describe how the aging effects for this weld and the cap are managed in accordance with the guidelines of BWRVIP-75, "BWR Vessel and Internals Project (BWRVIP), Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedule." (3) Discuss whether the event at Pilgrim (leaking weld at capped nozzle, September 30, 2003)is applicable to VYNPS. The staff issued Information Notice 2004-08, "Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds," dated April 22, 2004, which states that the cracking occurred in an Alloy 182 weld that was previously repaired extensively.
Discuss experience with previous leakage at the VYNPS capped nozzle, if any.Include in your discussion the past inspection techniques applied, the results obtained, and mitigative strategies imposed. Provide information as to how the plant-specific experience related to this aging effect impacts the attributes specified in AMP B.1.2, "BWR CRD Return line Nozzles." Enclosure 2
nRowley -Sumiiimary of Telephone Conference
-September 25, 2006 (VY).wpd Discussion:
The staff did not find the applicant's response in their September 20, 2006 letter (License Renewal Application, Amendment
- 14) to this RAI acceptable.
The staff reiterated its position that yard fire hydrants casing require an AMR. The applicant believes that the hydrants are not required for compliance with 10 CFR 50.48 and thus no AMR is reuired. The applicant will attempt to provide an adequate supplemental response to this concern in a future letter to the NRC.RAI B.1.2-2 Section 4 of the Generic Aging Lessens Learned Report (GALL) AMP XI.M6, "BWR Control Rod Drive (CRD) Return Line Nozzle," recommends that the aging degradation in the CRD return line nozzles should be monitored per the inspection recommendations specified in NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking." Section 8.2(2) of NUREG-0619 recommends that ultrasonic testing (UT) should be performed on the welded connection joining the rerouted CRD return line to the system which then returns the flow to the reactor vessel during each refueling outage.In a letter dated January 15, 1982, the applicant made'a commitment to the staff indicating that-it will perform UT examination of the CRD to the reactor water cleanup (RWCU) weld joint as discussed in NUREG-0619 for three consecutive refuel outages. The applicant further stated that upon the completion of these inspections, the inspection frquency will be reassessed based-on the inspection results. In AMP B.1 .2, "BWR CRD,.ReturnLine Nozzle," the applicant stated.that it inspected the CRD return line to the RWCU weld joint using UT methods for three consecutiye refuel outages and found no indications.
Since no indications were found, the applicant intends to take exception to GALL AMP XI.M6; in which the applicant proposes not to.inspect the aforementioned weld joint during the extended period of operation.
The staff : :., determined that the following information regarding the subject weld is required to complete its:-.review.(1) The applicant should provide technical justification for not performing the UT examination of the subject weld as recommended by the GALL AMP XI.M6 and NUREG-0619 during the extended period of operation.
(2) The applicant should confirm that the CRD return lines that are connected to RWCU piping system that fall under the jurisdiction of the ASME Code,Section XI boundary will be inspected per the ASME Section XI Code.Discussion:
The staff did not find the applicant's response in their September 20, 2006 letter (License Renewal Application, Amendment
- 14) to this RAI acceptable.
The staff reiterated its position.
The applicant will attempt to provide an adequate supplemental response to this concern in a future letter to the NRC.RAI 4.2-1 In Section 4.2.1 of the VYNPS LRA it is stated that "...the reactor fluence .... has been projected to the end of the period of extended operation." In Sections 4.2.1 and 4.2.2 of the LRA there is no discussion of how this extrapolation was performed.
Vermont Yankee has been approved for operation at an extended power uprate. In general, power uprates are based on revised axial power profiles with higher axial peaks at a lower axial location.
Therefore, extrapolation of the existing axial profile may not provide an accurate projection.
4 IJonathanRowley
-Summary of Telephone Conference
-September 25, 2006 (VY).wpda2
---Dý4 1 In view of the above, please respond to the following:
(1) Compare the axial power profiles (at the peak power azimuthal location) and confirm that the extrapolation remains valid.(2) Confirm that the projected operating plan will support the assumed axial power profile to the end of the period of extended operation.
Discussion:
The staff did not find the applicant's response in their September 20, 2006 letter (License Renewal Application, Amendment
- 14) to this RAI acceptable.
The staff was unsure if the applicant had accounted for the shift in axial power profile due to the power uprate when performing the extrapolation.
The applicant will provide the staff the report mentioned in the response for verification of the values given in the response.
The staff will consider the item resolved if the values are verified.5