ML110630117

From kanterella
Revision as of 23:43, 12 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012
ML110630117
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 03/04/2011
From:
Division Reactor Projects II
To:
Duke Energy Carolinas
Shared Package
ML110630104 List:
References
IR-11-001
Download: ML110630117 (1)


Text

Inspection / Activity Plan Page 1 of 1 03/04/2011 12:10:18 Report 22 03/01/2011

-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire EB3 ISI-UNIT 2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 03/07/2011 03/11/2011 OL EXAM-INITIAL EXAM PREP 6 1 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES V23350 05/23/2011 05/27/2011 TI-177-TI-177 GAS INTRUSION 3 1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 06/27/2011 07/01/2011 OL EXAM-INITIAL EXAM WEEK 7 1 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES V23350 06/27/2011 07/01/2011 PSB1-RP-RP PUBLIC RADIATION PROTECTION INSP 4 1, 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 06/27/2011 07/01/2011 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/27/2011 07/01/2011 1, 2 IP Radiation Monitoring Instrumentation 71124.05 06/27/2011 07/01/2011 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/27/2011 07/01/2011 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/27/2011 07/01/2011 1, 2 IP Performance Indicator Verification 71151 06/27/2011 07/01/2011 ISFSI-ISFSI DRY RUN FOR MAGANASTOR 6 1, 2 IP Preoperational Testing Of An ISFSI 60854 07/11/2011 07/15/2011 ISFSI-ISFSI FIRST CAMPAIGN OF MAGNASTOR 4 1, 2 IP Operation Of An ISFSI 60855 07/23/2011 07/28/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP Exercise Evaluation 7111401 08/08/2011 08/12/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/08/2011 08/12/2011 1, 2 IP Performance Indicator Verification 71151 08/08/2011 08/12/2011 EB3 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR 7111108P 09/26/2011 09/30/2011 EB3SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR 7111108P 09/26/2011 09/30/2011 CDBI-COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP Component Design Bases Inspection 7111121 02/13/2012 02/17/2012 1, 2 IP Component Design Bases Inspection 7111121 03/05/2012 03/09/2012 1, 2 IP Component Design Bases Inspection 7111121 03/19/2012 03/23/2012 1, 2 IP Component Design Bases Inspection 7111121 04/02/2012 04/06/2012 EB3 HS-TRIENNIAL HEAT SINK INSPECTION 1 1, 2 IP Heat Sink Performance 7111107T 03/05/2012 03/09/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.