ML112060475

From kanterella
Revision as of 15:04, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 3
ML112060475
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/24/2011
From: Williams J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2011-004, W3F1-2011-0062
Download: ML112060475 (4)


Text

10CFR 55 W3F1-2011-0062

July 24, 2011

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

RIS 2011-04, Preparation and Scheduling of Operator Licensing Examinations Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

In response to NRC Regulatory Issue Summary (RIS) 2011-04, Entergy is hereby submitting the requested information. Attached, on NRC Form 536, is updated information on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations and the NRC's Generic Fundamentals Examination Section (GFES).

There are no new commitments contained in this submittal. If you have any questions, please contact the Licensing Manager, William Steelman, at (504) 739-6685.

Sincerely, Joe Williams for William Steelman

WJS/JDW

Attachment:

Operator Licensing Examination Data Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6698 wsteelm@entergy.com William J. SteelmanLicensing Manager Waterford 3 W3F1-2011-0062 Page 2 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission

Region IV RidsNrrPMWaterford.Resource@nrc.gov NRC Region IV Operations Branch Chief

Mark.Haire@nrc.gov

NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 Marlone.Davis@nrc.gov

NRC/NRR Project Manager for Waterford 3 Kaly.Kalyanam@nrc.gov

Attachment W3F1-2011-0062 Operator Licensing Examination Data

OPERATOR LICENSINGEXAMINATION DATANRC FORM 536(10-2008)U.S. NUCLEAR REGULATORY COMMISSIONNRC REGIONA. PROPOSED EXAMINATION PREPARATION SCHEDULEFACILITYNRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPEREstimated burden per response to comply with this voluntary informationcollection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internete-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an informationcollection does not display a currently valid OMB control number, the NRC maynot conduct or sponsor, and a person is not required to respond to, theinformation collection.APPROVED BY OMB: NO. 3150-0131EXPIRES: 10/31/2011PROPOSED NUMBERCYESTIMATED NUMBER OFLICENSEE-PREPAREDEXAMINATIONSCYCYCYB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBERNUMBER OF REACTOROPERATORSNUMBER OF SENIOR REACTOROPERATORS - INSTANTNUMBER OF SENIOR REACTOROPERATORS - UPGRADENUMBER OF SENIOR REACTOROPERATORS - LIMITEDPROPOSED DATESPRIMARY DATEALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSEDNUMBERESTIMATEDNUMBER OFCANDIDATESCYMARCHJUNECYCYCYCYCYSEPTEMBERDECEMBERESTIMATED NUMBER OFNRC-PREPAREDEXAMINATIONSMARCHJUNESEPTEMBERDECEMBERWaterford 3 SESIV20132014201520160110000020132014201520160106003300330000003/10/201408/03/201503/17/201408/10/20152013201400009000