ML062430390

From kanterella
Revision as of 11:37, 26 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Shearon Harris, Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07
ML062430390
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/2006
From: Desai B B
NRC/RGN-II/DRP/RPB4
To: Gannon C J
Carolina Power & Light Co
Shared Package
ML062430386 List:
References
Download: ML062430390 (1)


Text

Harris Inspection / Activity Plan 08/01/2006

-07/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/30/2006 14:24:48 Report 22 2 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1 2515/169 IP Mitigating Systems Performance Index Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/18/2006 09/22/2006 1 7111121 IP Component Design Bases Inspection Baseline Inspections 10/02/2006 10/06/2006 1 7111121 IP Component Design Bases Inspection Baseline Inspections 10/16/2006 10/20/2006 1 7111121 IP Component Design Bases Inspection Baseline Inspections 10/30/2006 11/03/2006 1 7111121 IP Component Design Bases Inspection 1 PSB1-RP-RP PUBLIC PRE - INSP VISIT Baseline Inspections 12/18/2006 12/20/2006 1 7112101 IP A ccess Control to Radiologically Significant Areas 3 OL RQ-REQUAL INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1 7111111B IP Licensed Operator Requalification Program 3 PS2-EP-EP EXERCISE Baseline Inspections 04/09/2007 04/13/2007 1 7111401 IP Exercise Evaluation Baseline Inspections 04/09/2007 04/13/2007 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/09/2007 04/13/2007 1 71151 IP Performance Indicator Verification 3 EB3-HS-HEAT SINK Baseline Inspections 06/04/2007 06/08/2007 1 7111107B IP Heat Sink Performance 1 PSB1-RP-RP PUBLIC PRE-INSP. VISIT Baseline Inspections 06/11/2007 06/13/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas 4 OL PREP-INITIAL EXAM PREP Not Applicable 07/09/2007 07/13/2007 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 4 PSB1-RP-RP PUBLIC BASELINE INSP Baseline Inspections 07/09/2007 07/13/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/09/2007 07/13/2007 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/09/2007 07/13/2007 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/09/2007 07/13/2007 1 71151 IP Performance Indicator Verification 5 LIC RENE-LICENSE RENEWAL INSPECTION License Renewal Ins p 07/16/2007 07/27/2007 1 71002 IP License Renewal Inspection 4 OL EXAM-INITIAL EXAM Not Applicable 07/30/2007 08/10/2007 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.