Issuance of Amendment No. 225, Revise Technical Specifications to Relocate Steam Generator Level - High Trip Function Requirements to Technical Requirements Manual
ML093480507
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/18/2010
From: Kalyanam N K
Plant Licensing Branch IV
To:
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME2464
Download: ML093480507 (19)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 18, 2010 Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 WATERFORD STEAM ELECTRIC STATION, UNIT 3 -ISSUANCE OF AMENDMENT RE: TECHNICAL SPECIFICATION CHANGE TO RELOCATE STEAM GENERATOR HIGH LEVEL TRIP FUNCTION (TAC NO. ME2464)

Dear Sir or Madam:

The Commission has issued the enclosed Amendment No. 225 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3). This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated October 19, 2009. The amendment relocates the Waterford 3 Steam Generator Level -High trip requirements from TS Sections 2.2 and 3/4.3.1 to the Technical Requirements Manual (TRM). This relocation of the Steam Generator Level -High trip requirements is consistent with Technical Specification Task Force (TSTF) 410-A, "Relocation of Steam Generator Level -High Trip to the TRM," and Revision 3 of NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants." A copy of our related Safety Evaluation is also enclosed.

The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Sincerely, N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

1. Amendment No. 225 to NPF-38 2. Safety Evaluation cc w/encls: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 ENTERGY OPERATIONS, INC. DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 225 License No. NPF-38 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment by Entergy Operations, Inc. (EOI), dated October 19, 2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1

-2Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.2 of Facility Operating License No. NPF-38 is hereby amended to read as follows: 2. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 225, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. This license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Michael 1. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-38 and Technical Specifications Date of Issuance:

l'v1arch 18, 2010 ATTACHMENT TO LICENSE AMENDMENT NO. TO FACILITY OPERATING LICENSE NO. DOCKET NO. Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Facility Operating License REMOVE INSERT Technical Specifications REMOVE 2-3 3/43-10 3/43-18b 3/4 3-3 3/4 3/4 3-4 3/4 3/4 3-5 3/4 3/4 3-6 3/4

-or indirectly any control over (i) the facility, (ii) power or energy produced by the facility, or (iii) the licensees of the facility.

Further, any rights acquired under this authorization may be exercised only in compliance with and subject to the requirements and restrictions of this operating license, the Atomic Energy Act of 1954, as amended, and the NRC's regulations.

For purposes of this condition, the limitations of 10 CFR 50.81, as now in effect and as they may be subsequently amended, are fully applicable to the equity investors and any successors in interest to the equity investors, as long as the license for the facility remains in effect. Entergy Louisiana, LLC (or its designee) to notify the NRC in writing prior to any change in (i) the terms or conditions of any lease agreements executed as part of the above authorized financial transactions, (ii) any facility operating agreement involving a licensee that is in effect now or will be in effect in the future, or (iii) the existing property insurance coverages for the facility, that would materially alter the representations and conditions, set forth in the staffs Safety Evaluation enclosed to the NRC letter dated September 18, 1989. In addition, Entergy Louisiana, LLC or its designee is required to notify the NRC of any action by equity investors or successors in interest to Entergy Louisiana, LLC that may have an effect on the operation of the facility. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3716 megawatts thermal (100% power) in accordance with the conditions specified herein. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 225, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. AMENDMENT NO. 225 TABLE REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT m ;;0 "'Tl o ;;0 o I -I w N I W >> m z o m z -I Z o _it N N FUNCTIONAL UNIT 1. Manual Reactor Trip 2. Linear Power Level -High Four Reactor Coolant Pumps Operating

3. Logarithmic Power Level -High (1) 4. Pressurizer Pressure -High 5. Pressurizer Pressure -Low 6. Containment Pressure -High 7. Steam Generator Pressure -Low 8. Steam Generator Level -Low 9. Local Power Density -High 10. DNBR -Low 11. DELETED 12. Reactor Protection System Logic 13. Reactor Trip Breakers 14. Core Protection Calculators
15. CEA Calculators
16. Reactor Coolant Flow -Low TRIP Not
108% of RATED THERMAL ::: 0.257% of RATED THERMAL POWER ::: 2350 1684 psi a ::: 17.1 666 psi a 27.4% ::: 21.0 kW/ft 1.26 Not Not Not Not 19.00 psid ALLOWABLE Not
108.76% of RATED THERMAL ::: 0.280% of RATED THERMAL POWER ::: 2359 1649.7 psia ::: 17.4 652.4 psia 26.48% ::: 21.0 kW/ft 1.26 Not Not Not Not 18.47 psid 01 TABLE REACTOR PROTECTIVE MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE

--j m FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION:::u "'Tl 0 1. Manual Reactor Trip 2 sets of 2 1 set of 2 2 sets of 2 1,2 1:::u 2 sets of 2 1 set of 2 2 sets of 2 3*,4*,5* z 2. Linear Power Level-High 4 2 3 1,2 w 3. Logarithmic Power

a. Startup and Operating 4 2(a)(d) 3 2** 2#,3# 4 2 3 3*,4*,5* 8 b. Shutdown 4 0 2 3,4,5 4 4. Pressurizer Pressure -High 4 2 3 1,2 2#,3# 5. Pressurizer Pressure -Low 4 2(b) 3 1,2 2#,3# 6. Containment Pressure -High 4 2 3 1,2 2#,3# w 7. Steam Generator Pressure -Low 4/8G 2/SG 3/SG 1,2 2#,3# w I 8. Steam Generator Level -Low 4/SG 2/SG 3/SG 1,2 2#,3#w 9. Local Power Density -High 4 2(c)(d) 3 1,2 2#,3# 10. DNBR -Low 4 2(c)(d) 3 1,2 2#,3# 11. DELETED 12. Reactor Protection System Logic 4 2 3 1,2 5 3*,4*,5* 8 >>:s: 13. Reactor Trip Breakers 4 2(f) 4 1,2 5 m z 3*,4*,5* 8 0 :s: m 14. Core Protection Calculators 4 2(c)(d) 3 1,2 2#,3# and 7 z --j 15. CEA Calculators 2 1 2(e) 1,2 6 and 7 z 0 16. Reactor Coolant Flow -Low 4/8G 2/SG(c) 3/SG 1,2 2#,3# : J TABLE 3.3-1 (Continued)

TABLE NOTATION *With the protective system trip breakers in the closed position, the CEA drive system capable of CEA withdrawal, and fuel in the reactor vessel. #The provisions of Specification 3.0.4 are not applicable.

    • Not applicable above 10-4 % RATED THERMAL POWER(1), Trip may be manually bypassed above 10-4% of RATED THERMAL POWER(1);

bypass shall be automatically removed when THERMAL POWER(1) is less than or equal to the reset point of the bistable.

The reset point shall be within 3.0x10-5% of RATED THERMAL POWER(1) below the bistable setpoint which is nominally 10-4% of RATED THERMAL POWER(1), This accounts for the deadband of the bistable. Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia. Trip may be manually bypassed below 10-4 % of RATED THERMAL POWER(1);

bypass shall be automatically removed when THERMAL POWER(1) is greater than or equal to 10-4 % of RATED THERMAL POWER(1).

During testing pursuant to Special Test Exception 3.10.3, trip may be manually bypassed below 5% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is greater than or equal to 5% of RATED THERMAL POWER. Trip may be bypassed during testing pursuant to Special Test Exception 3.10.3. See Special Test Exception 3.10.2. Each channel shall be comprised of two trip breakers; actual trip logic shall be one-out-of-two taken twice. (1) As m easured by the Logarithmic Power Channels.

WATERFORD

-UNIT 3/4 3-4 AMENDMENT NO. 4-4;49109, TABLE 3.3-1 (Continued)

ACTION STATEMENTS With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below: Process Measurement Functional Unit BypassedlTripped

1. Linear Power Linear Power Level -High (Subchannel or Linear) Local Power Density -High DNBR -Low Pressurizer Pressure -High Pressurizer Pressure -High Local Power Density -High DNBR -Low Containment Pressure -High Containment Pressure -High (RPS) Containment Pressure -High (ESF) 4. Steam Generator Pressure Steam Generator Pressure -Low Steam Generator t>P 1 and 2 (EFAS 1 and 2) Steam Generator Level Steam Generator Level -Low Steam Generator t>P (EFAS) Core Protection Calculator Local Power Density -High DNBR -Low ACTION 3 -With the number of channels OPERABLE one less than the Minimum Channels OPERABLE requirement, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied: Verify that one of the inoperable channels has been bypassed and place the other channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below: Process Measurement Functional Unit BypassedlTripped
1. Linear Linear Power Level -High (Subchannel or Local Power Density -High DNBR -Low WATERFORD

-UNIT 3/43-5 AMENDMENT NO. 225 TABLE 3.3-1 ACTION

2. Pressurizer Pressure Pressurizer Pressure -High High Local Power Density -High DNBR -Low Containment Pressure Containment Pressure -High (RPS) High Containment Pressure -High (ESF) Steam Generator Steam Generator Pressure -Low Pressure -Steam Generator L\P 1 and 2 (EFAS 1 and 2) Steam Generator Level Steam Generator Level -Low Steam Generator L\P (EFAS) Core Protection Local Power Density -High Calculator DNBR -Low STARTUP and/or POWER OPERATION may continue until the performance of the next required CHANNEL FUNCTIONAL TEST. Subsequent STARTUP and/or POWER OPERATION may continue if one channel is restored to OPERABLE status and the provisions of ACTION 2 are satisfied.

ACTION 4 -With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, suspend all operations involving positive reactivity changes.

  • ACTION 5 -With the number of channels OPERABLE one less those required by the Minimum Channels OPERABLE requirement, STARTUP and/or POWER OPERATION may continue provided the reactor trip breakers of the inoperable channel are placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; otherwise, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for surveillance testing per Specification 4.3.1.1. ACTION 6 -With one CEAC inoperable, operation may continue for up to 7 days provided that at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, each CEA is verified to be within 7 inches (indicated position) of all other CEAs in its group. Limited plant cooldown or boron dilution is allowed provided the change is accounted for in the calculated SHUTDOWN MARGIN. WATERFORD

-UNIT 3/4 3-6 AMENDMENT NO. 5, 185,225 TABLE 4.3-1 REACTOR PROTECTIVE INSTRUMENTATION 225SURVEILLANCE REQUIREMENTS CHANNEL MODES FOR WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALI BRA TION TEST IS REQUIRED 1. Manual Reactor Trip N.A. Rand S/U(1) 1, 2, 3*, 4*, 5* Linear Power Level -High S D(2,4),M(3,4), Q 3. Logarithmic Power Level -High R(4) Q and S/U(1) 2#,3,4,5 4. Pressurizer Pressure -High R Q 1,2 5. Pressurizer Pressure -Low R Q 1,2 6. Containment Pressure -High R Q 1,2 7. Steam Generator Pressure -Low R Q 1,2 8. Steam Generator Level -Low R Q 1,2 9. Local Power Density -High 0(2,4), R(4,5) Q, R(6) 1,2 DNBR -Low S S(7), 0(2,4), Q, R(6) 1,2 M(8), R(4,5) DELETED Reactor Protection System Logic N.A. N.A.

Q(11) and S/U(1) 1, 2, 3*, 4*, 5* WATERFORD

-UNIT 3/43-10 AMENDMENT NO. 40. 69. 153.

TABLE 3.3-3 (Continued)

TABLE NOTATION Process Measurement Functional Unit BypassedlTripped

1. Steam Generator Steam Generator Pressure -Low -Steam Generator 1 and 2 (EFAS) Steam Generator Level Steam Generator Level -Low Steam Generator (EFAS) ACTION With the number of OPERABLE channels one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION and/or operation in the other applicable MODE(S) may continue provided the following conditions are satisfied: Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. With a channel process measurement circuit that affects multiple functional units inoperable or in test, bypass or trip all associated functional units as listed below: Process Measurement Functional Unit BypassedlTripped
1. Steam Generator Steam Generator Pressure -Low -Steam Generator 1 and 2 (EFAS) Steam Generator Level Steam Generator Level -Low Steam Generator (EFAS) Restore at least one of the inoperable channels to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Subsequent operation in the applicable MODE(S) may continue if one channel is restored to OPERABLE status and the provisions of ACTION 19 are satisfied.

WATERFORD

-UNIT 3/43-18b AMENDMENT NO. 47, 143, 154, 225 UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 225 TO FACILITY OPERATING LICENSE NO. NPF-38 ENTERGY OPERATIONS, INC. WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382

1.0 INTRODUCTION

By application dated October 19, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092940242, Reference 1), Entergy Operations, Inc. (Entergy, the licensee), requested changes to the Technical Specifications (TSs) for Waterford Steam Electric Station, Unit 3 (Waterford 3). The proposed changes would relocate the Waterford 3 Steam Generator Level -High trip requirements from TS Sections 2.2 and 3/4.3.1 to the Technical Requirements Manual (TRM). This relocation of the Steam Generator Level -High trip requirements is consistent with Technical Specification Task Force (TSTF) 41 O-A, "Relocation of Steam Generator Level -High Trip to the TRM," and Revision 3 of NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants."

2.0 REGULATORY EVALUATION

Section 182a of the Atomic Energy Act of 1954, as amended (the Act), requires applicants for nuclear power plant operating licenses to include TSs as a part of the license. The Nuclear Regulatory Commission's (NRC) regulatory requirements related to the content of TS are set forth in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36, "Technical specifications," which requires that the TSs include items in specific categories, including (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) surveillance requirements (SRs); (4) design features; and (5) administrative controls.

The regulations in 10 CFR 50.36(c)(2)(i) state that the TSs will contain LCOs which "are the lowest functional capability or performance levels of equipment required for safe operation of the facility.

When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met." The regulations in Enclosure 2

-10 CFR 50.36(c)(2)(i) state that an LCO must be established for each item meeting one or more of the following criteria: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary; A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier; A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier; A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. Therefore, existing TS LCOs and related SRs that fall within or satisfy any of these criteria, must be retained in the TSs, while those TS requirements that do not fall within or satisfy these criteria may be relocated to other, licensee-controlled documents.

The NRC staff also evaluated the proposed changes against the following criteria in 10 CFR 50.36(c)(2)(ii): (A) Criterion

1. Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.

(8) Criterion

2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. (C) Criterion
3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. (0) Criterion
4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. TECHNICAL EVALUATION

3.1 Proposed

TS Changes As stated in its letter dated October 19, 2009, the licensee proposed the following changes: Relocate the trip setpoints and allowable values for Functional Unit 11, "Steam Generator Level-High," from TS Table 2.2-1 to the Waterford 3 TRM (page 2-3);

-3Relocate the Functional Unit 11, "Steam Generator Level -High" requirements of TS Table 3.3-1 to the Waterford 3 TRM (page 3/4 3-3); Relocate Note (g) in TS Table 3.3-1 (steam generator high level trip bypass) to the Waterford 3 TRM (page 3/4 3-4); Relocate references to the Steam Generator Level -High functional units from Actions 2 and 3 of TS Table 3.3-1 to the Waterford 3 TRM (pages 3/4 3-5 and 3/43-6); Relocate the Functional Unit 11, "Steam Generator Level -High" surveillance requirements of TS Table 4.3-1 to the Waterford 3 TRM (page 3/4 3-10); Relocate references to "Steam Generator Level -High" from Actions 19 and 20 of TS Table 3.3-3 to the Waterford 3 TRM (page 3/4 3-18b); and Relocate the TS Bases in Section 2.2.1 for "Steam Generator Level-High" trip setpoint to the Waterford 3 TRM. In addition, Table Notation (4) of TS Table 2.2-1 will be retained in the TSs, but will be copied to the Waterford 3 TRM. NRC Staff Evaluation The reactor protection system "Steam Generator Level -High" trip function is provided to protect the main turbine from excessive moisture carryover from the steam generators that may result in damage to the turbine in the event of a feedwater transient.

During a feedwater malfunction, the steam generator level may rise to the point that excessive moisture entering the steam line could cause potential damage to components within the main turbine and failure of the turbine itself. The moisture mist entering the steam line could cause increased vibration, blade wear, and eventual permanent damage to the main turbine. Therefore, upon the steam generator level exceeding the steam generator high level trip setpoint, a reactor trip is initiated, which in turn automatically trips the main turbine. However, the main turbine is not a safety-related component and its loss does not impact the safety of the reactor core. The high steam generator level trip function does not act to protect the reactor core. This trip function is not credited in any design-basis accident and transient analysis, nor does it correspond to any safety limit. The steam generator high level trip function was evaluated against the four criteria stated in 10 CFR 50.36(c)(2)(ii).

The NRC staff's evaluation determined the following: The steam generator high level trip does not provide control room instrumentation that is used to detect a significant abnormal degradation of the reactor coolant pressure boundary.

Based on the licensee's November 22, 1994, response (Reference

2) to NRC Generic Letter (GL) 89-19, "Safety Implication of Control Systems in LWR Nuclear Power Plants," dated September 20, 1989 (ADAMS Legacy Library Accession No. 890920223), appropriate provisions have been met and maintained which adequately

-4 address the concerns of GL 89-19 without the reliance on the steam generator high level trip function. The steam generator high level trip is not a process variable, design feature, or operating restriction that is an initial condition of a design-basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The steam generator high level trip function supports main turbine protection and is not credited in any accident analyses nor does it correspond to any safety limit. The steam generator high level trip is not a structure, system, or component that is part of the primary success path which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The steam generator high level trip function provides main turbine protection and is not analyzed to mitigate the consequences of a design-basis accident that threatens the integrity of a fission product barrier. The steam generator high level trip is not a structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. The steam generator high level trip function supports main turbine protection.

In its response to GL-89-19 (Reference 2), the licensee stated that it had reviewed the Combustion Engineering Owners Group's (CEOG) report and verified that the generic aspects of the report are applicable to Waterford

3. As discussed in its January 3, 1995, safety evaluation (Reference
3) on the CEOG's response to GL 89-19 regarding the steam generator overl:ill protection, the NRC staff accepted the CEOG's contention from a probabilistic risk assessment viewpoint that steam generator overfill events do not have a significant impact on the public health and safety. The Waterford 3 Final Safety Analyses Report (FSAR), Section 13.7.1.2, states that the TRM is administered as part of the FSAR, changes to the TRM are subject to the criteria of 10 CFR Section 50.59, "Changes, tests and experiments," and administrative controls for processing TRM changes are included in the Waterford 3 site procedures.

Therefore, the NRC staff concludes that sufficient regulatory controls exist for the TRM. Based on the above, the NRC staff concludes that the proposed TS changes are acceptable.

The NRC has also concluded that sufficient controls exist to maintain regulatory requirements via the TRM. Summary The NRC staff concludes that the above requirements associated with the steam generator high level trip function may be deleted from the TSs because (1) the 10 CFR 50.36 TS inclusion criteria are not applicable to the steam generator high level trip function, and (2) these requirements have been appropriately relocated to the licensee's TRM. The NRC staff has reviewed the licensee's request to relocate the portions of the Waterford 3 TSs associated with the steam generator high level trip function to the TRM and, based on its evaluation, the staff concludes that the requested TS changes are acceptable.

-In addition, the staff concludes that the licensee has provided adequate justification to support the requested changes and reasonable assurance that Waterford 3 will be able to comply with the regulatory requirements and, therefore, meets 10 CFR 50.36. Therefore, the NRC staff concludes that the proposed TS changes are acceptable. Regulatory Commitments In its letter dated October 19, 2009, the licensee made the following commitment:

Upon NRC approval of the proposed TS change, Entergy will relocate Waterford 3 Steam Generator Level -High trip function to the Technical Requirements The NRC staff concludes that the proposed commitment is acceptable. STATE CONSULTATION In accordance with the Commission's regulations, the Louisiana State official was notified of the proposed issuance of the amendment.

The State official had no comments. ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.

The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on December 1, 2009 (74 FR 62834). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. CONCLUSION The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public. REFERENCES Kowalewski, J. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request, Technical Specification Change to Relocate the Steam Generator High Level Trip Function, Waterford Steam Electric

-Station Unit 3, Docket No. 50-382, License No. NPF-38," dated October 19, 2009 (ADAMS Accession No. ML092940242). Burski, R. F., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Waterford 3 SES, Docket No. 50-382, License No. NPF-38, Generic Letter 89-19, 'Safety Implication of Control Systems in LWR Nuclear Power Plants'," dated November 22, 1994 (ADAMS Legacy Library Accession No. 9411280050). Patel, C. P., U.S. Nuclear Regulatory Commission, letter to Ross P. Barkhurst, Entergy Operations, Inc., "Transmittal of the NRC Safety Evaluation for the Combustion Engineering Owners Group Response to Generic Letter 89-19, "Request for Action Related to Resolution of Unresolved Safety Issue A-47 'Safety Implication of Control Systems in LWR Nuclear Power Plants' Pursuant to 10 CFR 50.54(f),'

and the Closeout of this Issue -Waterford Steam Electric Station, Unit 3 (TAC No. M75016)," dated January 3, 1995 (ADAMS Legacy Library Accession No. 8909200223).

Principal Contributor:

K. Bucholtz March 18, 2010 March 18, 2010 Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 WATERFORD STEAM ELECTRIC STATION, UNIT 3 -ISSUANCE OF AMENDMENT RE: TECHNICAL SPECIFICATION CHANGE TO RELOCATE STEAM GENERATOR HIGH LEVEL TRIP FUNCTION (TAC NO. ME2464)

Dear Sir or Madam:

The Commission has issued the enclosed Amendment No. 225 to Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3). This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated October 19, 2009. The amendment relocates the Waterford 3 Steam Generator Level -High trip requirements from TS Sections 2.2 and 3/4.3.1 to the Technical Requirements Manual (TRM). This relocation of the Steam Generator Level -High trip requirements is consistent with Technical Specification Task Force (TSTF) 410-A, "Relocation of Steam Generator Level-High Trip to the TRM," and Revision 3 of NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants." A copy of our related Safety Evaluation is also enclosed.

The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Sincerely, IRA by Lynnea Wilkins forI N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

1. Amendment No. 225 to NPF-38 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDirsllsb Resource RidsOgcRp Resource LPLIV r/f RidsNrrDorlLpl4 Resource RidsRgn4MailCenler Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource KBuchollz, NRRIDIRS/ITSB RidsNrrDeEicb Resource RidsNrrPMWalerford Resource PChung, NRRlDE/EICB RidsNrrDssSrxb Resource RidsNrrLAJBurkhardl Resource KDesai, NRRlDSS/SRXB ADAMS Accession No ML093480507 OFFICE NRR/LPL4/PM NRR/LPL4/LA DE/EICB/BC DSS/SRXB/BC DIRS/ITSB/BC OGC NRR/LPL4/BC NRRlLPL4/PM II NAME DATE NKalyanam 2/23/10 JBurkhardt 2/23/10 WKemper 3/1110 GCranston 3/10/10 REIliott MHamm for 1212/09 DRoth 3111/10 MMarkley 3/17/10 NKalyanam LWilkins for 3/18/10 OFFICIAL RECORD COPY I