Acceptance Review Email License Amendment Request, Revise Technical Specifications to Relocate Steam Generator Level - High Trip Function Requirements to Technical Requirements Manual
ML093130710
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/09/2009
From: Kalyanam N
Plant Licensing Branch IV
To: Mason M, Joseph E Pollock
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME2464
Download: ML093130710 (1)


Text

From: Kalyanam, Kaly Sent: Monday, November 09, 2009 3:54 PM To: POLLOCK, JIM; MASON, MICHAEL E (WF3)

Cc: MURILLO, ROBERT J

Subject:

FW: Acceptance Review Result for Waterford LAR dated October 19, 2009 (ME2464)

Please note the TAC No. is ME2464.

From: Kalyanam, Kaly Sent: Monday, November 09, 2009 3:46 PM To: 'POLLOCK, JIM'; 'MASON, MICHAEL E (WF3)'

Cc: 'MURILLO, ROBERT J'

Subject:

Acceptance Review Result for Waterford LAR dated October 19, 2009 (ME2464)

Jim/Mike:

By letter dated October 19, 2009, Entergy Operations, Inc., submitted a license amendment request for Waterford Steam Electric Station, Unit 3. Entergy has proposed a change to Technical Specifications 2.2 and 3/4.3.1, to relocate Steam Generator High Level Trip Function to the Technical Requirements Manual (TRM).

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications.

Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please call me at 415 1480.

Thanks Kaly N. Kalyanam

E-mail Properties Mail Envelope Properties ()

Subject:

FW: Acceptance Review Result for Waterford LAR dated October 19, 2009 (ME2464)

Sent Date: 11/9/2009 3:52:49 PM Received Date: 11/9/2009 3:54:00 PM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:

RPOLLOC@entergy.com (POLLOCK, JIM)

Tracking Status: None MMASON@entergy.com (MASON, MICHAEL E (WF3))

Tracking Status: None RMURILL@entergy.com (MURILLO, ROBERT J)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 9948 11/9/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: