ML17319A975
From kanterella
Revision as of 21:25, 15 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
EPID:L-2017-LLR-0131, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule (Approved, Closed) EPID:L-2017-LLR-0137, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML17117A4422017-04-21021 April 2017
[Table View]Revision 30 to Updated Final Safety Analysis Report, Section 4, Reactor Coolant System Project stage: Request L-17-292, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule2017-10-0606 October 2017 Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request L-17-299, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BA-01)2017-10-24024 October 2017 Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BA-01) Project stage: Request ML17317A0032017-11-0808 November 2017 NRR E-mail Capture - Acceptance Review: Beaver Valley Power Station Unit No. 1: Proposed Alternative Request to Extend Inservice Inspection Interval from 10 to 20 Years Project stage: Acceptance Review L-17-317, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01)2017-11-15015 November 2017 Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01) Project stage: Request ML17340B2672017-12-0505 December 2017 NRR E-mail Capture - Acceptance Review: Beaver Valley Power Station Unit No. 1 - Proposed Alternative Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (1-TYP-4-BN-01) Project stage: Acceptance Review ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 Project stage: RAI ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 Project stage: RAI L-17-375, Response to Request for Additional Information Regarding Request 1-TYP-4-BA-01 to Extend the Inservice Inspection Interval for Certain Reactor Vessel Welds2018-01-0505 January 2018 Response to Request for Additional Information Regarding Request 1-TYP-4-BA-01 to Extend the Inservice Inspection Interval for Certain Reactor Vessel Welds Project stage: Response to RAI ML18073A1062018-03-28028 March 2018 Safety Evaluation of Proposed Alternatives 1-TYP-4-BA-01 and TYP-4-BN-01 Regarding the Fourth 10- Year Interval of the Inservice Inspection Program Project stage: Approval ML18096B4462018-04-0606 April 2018 e-mail Clarification Relief Request 1-TYP-4-BN-01 Project stage: Other 2017-12-19 |
ML17319A975 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 11/15/2017 |
From: | Bologna R D FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-17-317 | |
Download: ML17319A975 (15) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML24226A3652024-05-13013 May 2024
[Table view]Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-28028 September 2020 Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20223A0142020-08-20020 August 2020 Issuance of Relief Request SSR-1, Revision 0, from the Requirements of the ASME Code (EPID L-2020-LLR-0050 (COVID-19)) ML20206K8652020-08-0707 August 2020 Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19)) ML20145A0002020-06-0303 June 2020 Relief from the Requirements of the ASME Code for Requests VRR6 and VRR5 (EPID L-2020-LLR-0049 and EPID L-2020-LLR-0051 (COVID-19)) ML20100N3222020-04-0909 April 2020 Verbal Relief for Penetration Evaluation and Hot Leg Nozzles - Delivered 4/9/2020 at 10:00 Am ML20099B2572020-04-0808 April 2020 Verbal Relief Unit 2 CIV ML20098F3012020-04-0707 April 2020 Verbal Relief for Appendix I Safety Relief Valves ML20095J2192020-04-0404 April 2020 Email Beaver Valley Power Station, Unit 2 - Verbal Relief for MOVs - Delivered 4/4/2020 at 4:00 Pm ML20095J0992020-04-0404 April 2020 Email Beaver Valley Power Station, Unit 2 - Verbal Relief for Snubbers - Delivered 4/4/2020 at 4:00 P.M L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections2020-04-0303 April 2020 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing2020-04-0303 April 2020 CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing L-20-060, CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency2020-04-0202 April 2020 CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML20079F8162020-03-26026 March 2020 Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection Interval ML19275E2942019-10-16016 October 2019 Issuance of Relief Request Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in Lieu of Specific ASME Code Requirements L-19-107, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2019-08-27027 August 2019 Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements ML19051A1082019-02-20020 February 2019 Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0) ML18227A7332018-08-27027 August 2018 Request for Relief from the Requirements of the ASME Code ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) L-17-317, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01)2017-11-15015 November 2017 Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01) L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2)2017-10-25025 October 2017 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) ML17167A0672017-06-26026 June 2017 Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356). Note: Correction Safety Evaluation See ML17255A526 ML17159A4422017-06-26026 June 2017 Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357). Note: Correction Safety Evaluation See ML17255A508 ML17047A6102017-03-0202 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Code ML17041A1852017-03-0202 March 2017 Relief from the Requirements of the ASME Code ML17048A0042017-03-0202 March 2017 Relief from the Requirements of the ASME Code ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML16190A1332016-12-27027 December 2016 Relief from the Requirements of the ASME Code ML16319A0572016-12-0101 December 2016 Acceptance of Requested Licensing Action Relief Request for Proposed Alternative to Perform As-Found Set-Pressure Test ML16257A6212016-11-21021 November 2016 Relief Request BV2-PZR-01, Regarding Alternative to Requirements for Components Connected to the Steam Side of the Pressurizer ML16228A4082016-10-21021 October 2016 Correction to Relief Request 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds ML16147A3622016-06-17017 June 2016 Relief Request No. 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds ML14363A4092015-01-28028 January 2015 Relief Request No. 1-TYP-4-RV-04 Regarding the Examination Requirements of Code Case N-729-1 ML1202702982012-02-0707 February 2012 Relief Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency ML1131304282011-11-22022 November 2011 Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval ML1126404122011-09-20020 September 2011 Acceptance Review Results for VC Summer Relief Request (ME6879) ML1107705512011-04-26026 April 2011 Relief Request VRR2 Regarding the 10-Year Inservice Testing Program Interval ML1104705572011-02-25025 February 2011 Relief Request Regarding an Alternative Weld Repair Method for Reactor Vessel Head Penetrations J-Groove Welds ML1006807812010-03-12012 March 2010 Third 10-Year ISI Interval Relief Request (ME2608) L-08-362, Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements2008-12-0202 December 2008 Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements L-08-207, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement2008-09-24024 September 2008 Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement L-08-069, Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3)2008-04-0909 April 2008 Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3) ML0720504882007-09-17017 September 2007 Relief Request No. BV1-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds ML0705905552007-04-30030 April 2007 Relief, Relief Request No. BV2-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds L-07-056, Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update2007-03-28028 March 2007 Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update ML0625801202006-10-0202 October 2006 (BVPS-1 and 2), Inservice Inspection (ISI) Program, Alternative Examination of Reactor Coolant Pipe Welds, Request for Relief No. BV3-RV-2 2024-05-13 Category:Letter MONTHYEARIR 05000334/20240112024-10-17017 October 2024
[Table view]License Renewal Phase IV Inspection Report 05000334/2024011 L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-158, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 L-24-157, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-114, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation L-24-115, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 2024-09-17 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17319A975&oldid=1348839"