MONTHYEARML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-28028 September 2020 Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20223A0142020-08-20020 August 2020 Issuance of Relief Request SSR-1, Revision 0, from the Requirements of the ASME Code (EPID L-2020-LLR-0050 (COVID-19)) ML20206K8652020-08-0707 August 2020 Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19)) ML20145A0002020-06-0303 June 2020 Relief from the Requirements of the ASME Code for Requests VRR6 and VRR5 (EPID L-2020-LLR-0049 and EPID L-2020-LLR-0051 (COVID-19)) ML20100N3222020-04-0909 April 2020 Verbal Relief for Penetration Evaluation and Hot Leg Nozzles - Delivered 4/9/2020 at 10:00 Am ML20099B2572020-04-0808 April 2020 Verbal Relief Unit 2 CIV ML20098F3012020-04-0707 April 2020 Verbal Relief for Appendix I Safety Relief Valves ML20095J2192020-04-0404 April 2020 Email Beaver Valley Power Station, Unit 2 - Verbal Relief for MOVs - Delivered 4/4/2020 at 4:00 Pm ML20095J0992020-04-0404 April 2020 Email Beaver Valley Power Station, Unit 2 - Verbal Relief for Snubbers - Delivered 4/4/2020 at 4:00 P.M L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections2020-04-0303 April 2020 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing2020-04-0303 April 2020 CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing L-20-060, CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency2020-04-0202 April 2020 CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML20079F8162020-03-26026 March 2020 Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection Interval ML19275E2942019-10-16016 October 2019 Issuance of Relief Request Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in Lieu of Specific ASME Code Requirements L-19-107, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2019-08-27027 August 2019 Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements ML19051A1082019-02-20020 February 2019 Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0) ML18227A7332018-08-27027 August 2018 Request for Relief from the Requirements of the ASME Code ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) L-17-317, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01)2017-11-15015 November 2017 Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01) L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2)2017-10-25025 October 2017 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) ML17167A0672017-06-26026 June 2017 Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356). Note: Correction Safety Evaluation See ML17255A526 ML17159A4422017-06-26026 June 2017 Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357). Note: Correction Safety Evaluation See ML17255A508 ML17047A6102017-03-0202 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Code ML17041A1852017-03-0202 March 2017 Relief from the Requirements of the ASME Code ML17048A0042017-03-0202 March 2017 Relief from the Requirements of the ASME Code ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML16190A1332016-12-27027 December 2016 Relief from the Requirements of the ASME Code ML16319A0572016-12-0101 December 2016 Acceptance of Requested Licensing Action Relief Request for Proposed Alternative to Perform As-Found Set-Pressure Test ML16257A6212016-11-21021 November 2016 Relief Request BV2-PZR-01, Regarding Alternative to Requirements for Components Connected to the Steam Side of the Pressurizer ML16228A4082016-10-21021 October 2016 Correction to Relief Request 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds ML16147A3622016-06-17017 June 2016 Relief Request No. 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds ML14363A4092015-01-28028 January 2015 Relief Request No. 1-TYP-4-RV-04 Regarding the Examination Requirements of Code Case N-729-1 ML1202702982012-02-0707 February 2012 Relief Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency ML1131304282011-11-22022 November 2011 Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval ML1126404122011-09-20020 September 2011 Acceptance Review Results for VC Summer Relief Request (ME6879) ML1107705512011-04-26026 April 2011 Relief Request VRR2 Regarding the 10-Year Inservice Testing Program Interval ML1104705572011-02-25025 February 2011 Relief Request Regarding an Alternative Weld Repair Method for Reactor Vessel Head Penetrations J-Groove Welds ML1006807812010-03-12012 March 2010 Third 10-Year ISI Interval Relief Request (ME2608) L-08-362, Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements2008-12-0202 December 2008 Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements L-08-207, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement2008-09-24024 September 2008 Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement L-08-069, Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3)2008-04-0909 April 2008 Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3) ML0720504882007-09-17017 September 2007 Relief Request No. BV1-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds ML0705905552007-04-30030 April 2007 Relief, Relief Request No. BV2-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds L-07-056, Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update2007-03-28028 March 2007 Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update ML0625801202006-10-0202 October 2006 (BVPS-1 and 2), Inservice Inspection (ISI) Program, Alternative Examination of Reactor Coolant Pipe Welds, Request for Relief No. BV3-RV-2 L-06-042, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements2006-04-0707 April 2006 Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements 2023-09-18
[Table view] Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
FENOC '%P.O.
Beaver Valley Power Station Box 4 FirstEnergyNuclear OperatingCompany Shippingport,PA 15077 Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 September 24, 2008 L-08-207 10 CFR 50.55a(a)(3)(i)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section Xl Inspection Period Extension Requirement (Request No. 1-TYP-3-IWB-2412)
Pursuant to 10 CFR 50.55a(a)(3)(i), FirstEnergy Nuclear Operating Company (FENOC) requests approval of a proposed alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Section Xl, paragraph IWB-2412(b). Events leading to the request and a description of the proposed alternative are provided below.
The Eighteenth Refueling Outage Inservice Inspection Report for Beaver Valley Power Station Unit No. 1 (BVPS-1), submitted January 21, 2008, incorrectly states that all examinations requiring plant shutdown conditions have been completed for the current 10-year interval. The third of three scheduled inservice inspections of an area containing a flaw indication was inadvertently removed from the BVPS-1 third interval Inservice Inspection Plan and consequently was not performed. The missed inservice inspection has been addressed in accordance with the FENOC Corrective Action Program.
Plant shutdown conditions are required to access the area to be examined, and the next refueling outage when plant conditions would permit the examination is scheduled to begin 20 days after the end of the allowed inspection period. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), FENOC hereby requests Nuclear Regulatory Commission (NRC) approval of an alternative to extend the inspection period so that inservice inspection of the area containing the flaw indication can be performed during the BVPS-1 spring 2009 refueling outage (1R19). FENOC requests approval prior to March 31, 2009, which is the end of the one year inspection period extension permitted by ASME Code Section Xl, paragraph IWB-2412(b).
Beaver Valley Power Station, Unit No. 1 L-08-207 Page 2 The proposed alternative provides an acceptable level of quality and safety and is described in detail in the enclosure.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -
Fleet Licensing, at 330-761-6071.
Sinc Peter P. Sena III
Enclosure:
10 CFR 50.55a Request Number 1-TYP-3-IWB-2420, Revision 0 cc: Mr. S. J. Collins, NRC Region I Administrator Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRR Project Manager Mr. K. L. Howard, NRC DLR Project Manager Mr. D. J. Allard, Director BRP/DEP Mr. L. E. Ryan (BRP/DEP)
10 CFR 50.55a Request Number 1-TYP-3-IWB-2412, Revision 0 Page 1 of 2 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) 1.0 ASME Code Component Affected Reactor Coolant System 'C' loop cold leg pipe weld DLW-LOOP3-7-S-02 at Beaver Valley Power Station, Unit No. 1 (BVPS-1) 2.0 Applicable Code Edition and Addenda American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Section Xl, 1989 Edition, no Addenda 3.0 Applicable Code Requirement Paragraph IWB-2420(b) states that if flaw indications are evaluated in accordance with IWB-3132.4, and the component qualifies as acceptable for continued service, the areas containing such flaw indications shall be reexamined during the next three inspection periods listed in the schedules of the inspection programs of IWB-2410.
Paragraph IWB-2412(b) states that the inspection period may be extended by as much as one year to enable an inspection to coincide with a plant outage.
4.0 Reason for Request During a BVPS-1 inservice inspection of reactor coolant system piping performed in the spring 1996 refueling outage (1R11, March - May, 1996), an indication was identified on cold leg pipe weld DLW-LOOP3-7-S-02 that exceeded the ASME Code, Section Xl, Subsection IWB-3500 acceptance criteria. Subsequently, an evaluation was performed to ensure that this indication would remain within ASME Code, Section Xl, Appendix C evaluation acceptance standards. This evaluation concluded that the postulated flaw met the applicable requirements with significant margins of safety to the end of the service lifetime. The NRC concluded in the Safety Evaluation regarding the flaw indication in the reactor coolant system cold leg pipe weld, dated May 1, 1996 (Reference 7.1), that the reported flaw was acceptable for continued service until the end of the service lifetime provided the weld was reexamined during each of the next three inspection periods. Paragraph IWB-2420(b) also states that areas containing such flaw indications shall be reexamined during the next three inspection periods.
The successive weld examinations were performed during each of the two subsequent 40-month periods. However, the third successive examination was inadvertently deleted from the schedule during a program revision associated with the implementation of the risk-informed inservice inspection methodology, and was not performed within the third 40-month period, which ended on March 31, 2008. Implementation of the one year period extension permitted in ASME Code Section XI, paragraph IWB-2412(b), extends
Request Number 1-TYP-IWB-2412 Page 2 of 2 the required completion date of this examination to March 31, 2009. Examination of this weld requires plant shutdown conditions. The next BVPS-1 refueling outage (1R19) is currently scheduled to begin April 20, 2009, twenty days after the end of the extended period.
5.0 Proposed Alternative and Basis for Use The proposed alternative is to extend the third 40-month inspection period as necessary to enable the final successive examination on weld DLW-LOOP3-7-S-02 during the spring 2009 refueling outage (1R19), which is scheduled to begin 20 days after the 1 year inspection period extension permitted by paragraph IWB-2412(b). The examination would be performed during 1R19, when plant conditions allow access to this reactor coolant loop pipe weld.
The initial analytical evaluation of the identified flaw concluded that the indication was acceptable for further service without repair (Reference 7.2). A subsequent analytical evaluation of the flaw was performed recently, in association with BVPS-1 license renewal. This evaluation likewise concluded the reported flaw was acceptable for continued service through the end of the extended license period. The analytical evaluations are supported by the results of the two successive 40-month examinations that found no evidence of flaw growth. Based on the above, completion of the examination prior to startup from 1R1 9 would provide an acceptable level of quality and safety.
6.0 Duration of Proposed Alternative The duration of the proposed alternative is from March 31, 2009 until the examination is performed during 1R19.
7.0 References
- 1. Letter from D. S. Brinkman, Senior Project Manager, Office of Nuclear Reactor Regulation, to J. E. Cross, Senior Vice President and Chief Nuclear Officer, Duquesne Light Company,
Subject:
"Evaluation of Flaw Indication in Reactor Coolant System (RCS) Cold Leg Pipe Weld, Beaver Valley Power Station, Unit No. 1 (BVPS-1) (TAC No. M95232)," dated May 1, 1996.
- 2. Letter from S. C. Jain, Division Vice President, Duquesne Light Company to U. S. Nuclear Regulatory Commission, Document Control Desk,
Subject:
"Beaver Valley Power Station, Unit No. 1, Docket No. 50-334, License No.
DPR-66, Analysis of Flaw Indications: 1989 Edition of ASME Xl, Article IWB-3640," dated April 23, 1996.